| 1 | Dismantling of cement concrete or brick or granolithic floors including base concrete and including stacking of materials as directed by engg. i/c. within a distance of 60mtr. |
| 2 | Providing and laying in position cement cocrete of specified grade excluding the cost of centering and shuttering - All work up to the plinth level in 1:4:8 (1 cement : 4 coarse sand (zone-iii) : 8 graded stone aggregate 40 mm nominal size |
| 3 | Providing and laying tactile for vision impaired persons as per standards of size 300x300x9.8 mm having with water absorption less than 0.5% and and conforming to IS:15622 of appraved make in all colour and shades in for out floor such |
| 4 | Providing and laying factory made chamfered edge cement concrete paver blocks in footpath,parks lawn,drive,ways or light traffic parking etc, of required strength. Thickness & size/shape, made by table vibratory method using PU |
| 5 | Kota stone slab flooring over 20 mm (average) thick base laid over and jointed with grey cement slurry mixed with pigment to match the shade of slab, including rubbing and polishing complete with base of cement mortar 1:4 (1 cement: 4 coarse sand). |
| 6 | Brick work with common burnt clay (non modular) bricks of class-150 in foundation and plinth in cement mortar 1:4 (1 cement : 4 coarse sand) |
| 7 | 12mm cement plaster of mix : 1:4 (1 cement : 4 coarse sand) |
| 8 | Finishing walls with Putty approved brand and manufacture and of required shade on umdacorated wall surface to give even shade over including curing and cost of all material, labour, T&P etc. required for proper completion of work. |
| 9 | Finishing walls with exterior emulsion paint (Apex) of approved brand and manufacture and of required shade on undecoarated wall surface to give even shade over @ 1.25Ltr/10Sqm including one coat of primer apllied @ 0.75Ltr/10Sqm coat curing and cost of all material, labour T&P etc all complete. |
| 10 | Construction of gullypit of 0.60x0.60x0.75 m internal size with jali, labour, T&P etc, required for proper completion of work. |
| 11 | Providing and laying at or near ground level factory made kerb stone of M-25 grade cement in position to the required line, level and curvature jointed with cement mortar 1:3 (1cement : 3 coarser sand) including making joints with or without grooves (thickness of joints except ar sharp curve shall not to more than 5mm) including making drainage, opening wherever required complete etc. as per direction of Engg-in-charge (Length of finished kerb shall be measured for payment) |
| 12 | Construction of cement concrete kerb with top and bottom width 115 and 165 mm respectively, 250 mm high in M20 grade PCC on M-10 grade foundation, foundation having 50mm projection beyond kerb stone, kerb stone laid with kerb laying machine, foundation concrete laid manually, all complete as per clause 408. |
| 13 | Providing, laying and jointing of 300mm dia R.C.C. NP-2 hume pipe with all charges complete. |
| 14 | Making connection of pipe to the existing manhole/sewer line etc all complete. |
| 15 | Construction of manhole chamber of 0.60x0.60x0.90m internal size with b/w, plaster, cover, C.I. sheet, labour T&P etc required for proper completion of work. |
| 16 | Disposal of surplus earth/malwa upto 10.00km distance including loading/unloading of material with all charge complete. |
| 17 | Add 18 % G.S.T. Please Enable Macros to View BoQ information |