| 1 | (A) ROAD WORK IN R.E. WALL PORTION |
| 2 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.(Wet Mix Macadam) |
| 3 | Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401(Granular Sub-Base with Graded Material ) |
| 4 | (B) SERVICE ROAD WORK |
| 5 | Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2(Earth work in filling ) |
| 6 | Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (VG-30) @ 5.2 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects(Bituminous Concrete Grading-1) |
| 7 | Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder (VG-30) @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects.(Dense Graded Bituminous Macadam Grading-2) |
| 8 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.(Wet Mix Macadam) |
| 9 | Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401(Granular Sub-Base with Graded Material ) |
| 10 | Providing and applying tack coat with bitumen (VG-10) using pressure distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.(Tack Coat ) |
| 11 | Providing and applying primer coat with cutback MC 30 bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.60 to 0.90 kg/sqm using mechanical means.(Prime Coat ) Please Enable Macros to View BoQ information |