| 1 | Carriage of 8.5/09/11 Mtrs Long PCC Pole from Store Center Mathura/Other Sites in District Mathura to Site of Work with Erection of Single Pole Structure Complete in all respect as per RESPO Norms (including all labour, T&P, grouting material etc arrenged by Contractor on his own cost). |
| 2 | Carriage of 09/11 Mtrs Long ST Pole from Store Center Mathura/Other Sites in District Mathura to Site of Work with Erection of Single Pole Structure Complete in all respect as per RESPO Norms (including all labour, T&P, grouting material etc arrenged by Contractor on his own cost). |
| 3 | Carriage of 8.5/09/11 Mtrs Long PCC Pole from Store Center Mathura/Other Sites in District Mathura to Site of Work with Erection of Double Pole Structure Complete in all respect as per RESPO Norms (including all labour, T&P, grouting material etc arrenged by Contractor on his own cost). |
| 4 | Carriage of 11 KV XLPE Cable size 3x70/120 sq.mm. Cable form Store Center Mathura/Other Sites in District Mathura with Laying as per direction by supervising engineer. |
| 5 | Mounting of 63 KVA Transformer on the Plinth structures and making connections thereof (including Carriage of Transformer from Store Centre, Mathura to site of work with loading & unloading at both ends) |
| 6 | Mounting of 100 KVA Transformer on the Plinth structures and making connections thereof (including Carriage of Transformer from Store Centre, Mathura to site of work with loading & unloading at both ends) |
| 7 | Mounting of 250 KVA Transformer on the Plinth structures and making connections thereof (including Carriage of Transformer from Store Centre, Mathura to site of work with loading & unloading at both ends) |
| 8 | Carriage of Stey Set from Store Center Mathura/Other Sites in District Mathura to Site of Work and Installation of with grouting and nuzzling etc. as per RESPO drawing along with all routine material to be used for such works. |
| 9 | Carriage of Earth Rod from Store Center Mathura/Other Sites in District Mathura to Site of Work and fixing earthing rod and binding with earth wire as per standard norms including cost of labour T&P and required material for such work. |
| 10 | Carriage and Laying, sagging stringing and binding of ACSR Weasel/Dog/Rabbit/Raccon Conductor on the erected PCC pole/STP including jumpering as per RESPO manual. |
| 11 | Carriage and Laying, sagging stringing and binding of Arial Bunch Conductor 3x50/95/120 sqmm on the erected PCC pole/STP including jumpering and making connections in all respects and fixing of Distribution Box and other accessories as per RESPO manual. |
| 12 | Carriage and Laying, sagging stringing and binding of LT PVC Cable on the erected PCC pole/STP including jumpering and making connections in all respects and fixing of Distribution Box and other accessories as per RESPO manual. |
| 13 | Carriage of 11 KV Drop Out Fuse Set form Store Center Mathura/Other Sites in District Mathura with Installation on various capacity Transformers as per RESPO Norms. |
| 14 | Carriage of LT Distribution Box form Store Center Mathura/Other Sites in District Mathura with Installation on various capacity Transformers as per RESPO Norms. |
| 15 | Fixing of LT Protection PVC Box form Store Center Mathura/Other Sites in District Mathura with Installation on various capacity Transformers as per RESPO Norms. |
| 16 | Providing and Fixing of 11 KV Cable Indoor/Outdoor Jointing Kit of size 3x70/120 sq.mm Outdoor including removal of insulation, semi-conductor of the cable end and filling of cable box complete work as per direction of supervising engineer. |
| 17 | Construction of plinth of 250 KVA T/f size 5'x5'x4' above ground level and one. Ft. below the ground level of 9\\" after excavation of 4 earth brick ballast shall be provided and hammering will be done properly. After that a retaining wall of 9 width by first class brick in ratio 1:4 of cement and sand shall be made. The earth shall be filled up to one ft. below the top of the plinth. after this brick ballast shall be provided upto 6 from the earth level and proper hammering shall be done. One No. Jall of 12 mm. MS tore shall be fixed in the hollow of plinth and one. Ft. thick RCC in ration of cement, sand and stone ballast shall be laid on the top of the plinth. The 12 mm. thick plastering shall be done all around the plinth in 1:4 ratio of cement and sand. The contractor shall be responsible to complete the work as per direction of Supervision Engineer. It includes the cost of all material, labour, T & P, carrier etc. required for proper completion of work. |
| 18 | Body and neutral earthing of 250 KVA transformers by digging pits 6\\" dia up to 3 mtr deep including inserting lowering 80mm dia G.I. and insert 50mm G.I. pipe chemical filled pipe (Pipe in pipe earthing) I.S.I. Mark B- Grade connecting with G.I. flat 50x6 mm Power Transformer to 80mm diaG.I. pipe and filling of chemical mixture around the G.I. pipe up to 3mtr.Including making of chamber. |
| 19 | Making of wire mesh fencing around constructed 250 KVA T/f plinth 4mtr. x 3 mtr. with proper grouting Erection and construction of Toe- wall around the transformer plinth including digging of pits and making wall 9 inch wide & 30 cm. under the ground level and 30 cm. up to the ground level and making pocket Filling the concreting for grouting of wire mesh fencing and plastering around the wall in ratio 1:4 cement and sand providing of one no. main gate in the wire mesh fencing for shifting the transformer size of gate 8 ft. x 4ft. including fixing of dandala for locking system, (Size of angle iron 50x50x6mm. and size of wire mesh fencing 1.5x2 sq. inch wire gauge 10 SWG.) All material/labour will be arranged by the contractor. Please Enable Macros to View BoQ information |