|
| 1 | The work for erection of line for new connection on Jhatpat portal, Nives mitra & Deposti Work under EE, UEDD-Machhodari, Varanasi in Deposit Scheme |
| 2 | 3 Phase LT Distribution Box with clamp |
| 3 | Danger Board with Clamp |
| 4 | Dead end clamp with eye hook |
| 5 | Suspension clamp with eye hook |
| 6 | LT Insulated piercing clamp for enagiging D/B |
| 7 | Stay clamp for STP/PCC |
| 8 | X-arm clamp for STP/PCC |
| 9 | Top Channel Clamp for STP/PCC |
| 10 | Dropper Channel Clamp for STP/PCC |
| 11 | M.S. Nut & Bolts off size |
| 12 | Barbed wire |
| 13 | Shackle Insulator |
| 14 | Loop/Stay Insulator |
| 15 | F- Bracket |
| 16 | Stone Pad 300x300x75 mm |
| 17 | LT PVC Cable 1x35 Sq mm for energizing D.B. |
| 18 | Alu. Lug 70/150/240/400 Sq mm Long Barrel |
| 19 | HDPE Pipe Dia 160 mm |
| 20 | Copper Z Clamp |
| 21 | Number Plate |
| 22 | 2*6 Sq MM Armoured Cable Three Phase |
| 23 | 4*25 Sq Mm Armoured Cable Three Phase |
| 24 | 3.5C*35 Sq MM Armoured Cable Three Phase |
| 25 | 3.5*70 Sq MM Armoured Cable |
| 26 | Holding Clamps for Nuts & Bolts |
| 27 | Laying of 11KV D/C Cable in HDPE Pipe by horizontal drilling method. |
| 28 | Laying and dressing of under ground 11 KV XLPE Cable (Size may vary) by open trench method using sand brick and stone slab as per RESPO norms. |
| 29 | Laying and sagging of overhead 11 KV XLPE Cable as per site required with support wire |
| 30 | Fabrication, Erreaction, Commissioning & Testing of 25/63/100/250/400 KVA T/F on Double Pole/Plinth with all accessories including make its LT and HT Connection. |
| 31 | spl. earthing of Transformer 2x60ft deep (Body+Neutral) as per IS Code 3043 - 1987 specificationand connection with 50x5 mm GI Strip (Materials will be provided by contractor) |
| 32 | Erection and grouting of stay in CC ratio 1:4:8 of Cement, Sand and Stone Ballast including cost of grouting material with nozelling and binding of stay wire (Complete work) |
| 33 | Erection of Fuse Set |
| 34 | Erection of TPMO |
| 35 | Erection & Commissioning of PPMC & CT/PT Unit |
| 36 | Earthing of PPMC & CT/PT unit sp. Earthing by 2x60 ft deep |
| 37 | Loading, Unloading & Carriage of Conductor/Cables & Other Centralized Material from Store to site ( Except Pole/Transformer/CT-PT/PPMC) |
| 38 | Loading, Unloading & Carriage of 9/11/13 m ST Pole/PCC Pole from Store to Site |
| 39 | Loading, Unloading & Carriage of PPMC& CT/PT Unit from Store to Site |
| 40 | Loading, Unloading & Carriage of 25/63/100/250/400 KVA T/F from Store to Site |
| 41 | Errection of Single pole support of 9/11/13 mtr STP Pole then grouting and concreting of pole, Fixing of fitting for LT/HT Line. |
| 42 | Errection of Single pole support of 9/11/13 mtr PCC Pole then grouting and concreting of pole, Fixing of fitting for LT/HT Line. |
| 43 | Laying, stringing, sagging, binding and jumpering of ABC Cable (Size may vary) of LT Line with fixing of Distribution Box with Clamp, Insulated Dead end clamp with I hook, Suspension clamp with I hook(Insulated), LT insulated Piercing connector, XLPE 1X35 Sq.mm. Al. cable for enerzing DB, XLPE 1X16 Sq.mm. |
| 44 | Laying, stringing, sagging, binding and jumpering of ACSR Dog/Weasel conductor for LT/HT Line with fabrication and fixing of structure , LT Clamps/other clamps, Shackle insulator and nuts&bolts off size as per required. |
| 45 | Painting of ST Pole & Fitting with one coat of Red-Oxide Paint & Two Coat Al. Paints. ( Including Paint & Other Accessories) |
| 46 | Hoisting & Looping of 11 KV XLPE Cable Providing GI Pipe 100mm dia and 3 M Long with complete Work |
| 47 | making jointing of 11 KV XLPE Cable Jointing Kit/Straight Through with complete work |
| 48 | Earthing of ST Pole By MS Earthing Rod & 6 SWG earthing Wire as per Respo Norms |
| 49 | Construction of T/F plinth of size 2x2x1.2 mtr with the help of first class brick & 9\\" masonary in the ratio 1:4 cement & sand coarse. Filling the structure completely and plastering outer surface as per RESPO norms. Top of the plinth covered with 4\\" RCC Slab of ratio 1:1.5:3 (Cement, sand & concrete) grouting with 2 Nos. ISMC size 125X65X6 MM (confirming to IS 808:1989) of 2000 mm long for resting. All required materials will be provided by the contractor. |
| 50 | Grill fencing of 11/0.4 KV S/S shall be made of rectangular of size & height approx 2 meter as per site requirement with fabrication 50X50X5 mm angel the frame is also have 1 no. Horizontal runner of MS flat 40x5 welded in middle to support of grill, having a gate on road side must have provision of locking arrangement. The work is including painting of fencing as per norms. Work will be done as per RESPO specification. |
| 51 | Unmounting and mounting of existing distribution transfomer from old place to new place |
| 52 | Supply and Complete Installation of 2 Nos. Henley Type Tailless Unit 300 AMP in Box using LT XLPE 1X240 Sq.mm. Cable, LT Crimping Lug, GI Nuts & Bolts etc (as per site requirement) on 11/0.4 KV Distribution Transformer. (Only LT XLPE 1X240 Sq.mm. Cable will be provided by Department)Specification of Henley Type Tailless Unit 300 AMP described as below-1. Henley Type MS Sheet duly painted grey enameled paint- MS of 18 SWG (54X4.5 inches) with holes as per requirement2. 6 No. Insulator- Made of White Glazed Porcelain3. 6 No. Copper Spring Contact- 32X3.7 mm Made of Copper4. 3 No. \\"L\\" Contact - Brass5. 3 No. Metal Part Connector For Holding Busbar- Brass6. 1 No. Casted Patti- M.S.7. 1 No. Neutral- Brass8. Iron Clip, Bolt, Nuts, Washer and Screw etc for Tightening- All Galvanized9. Copper Bus Bar Strip- 500X50X5 mm (3 Nos.Copper Busbar Strip to be used on 2 Nos. Tailless unit)10. Aluminium Bus Bar Strip- 500X50X5 mm (1 No)All work will be done as per RESSPO Norms & relevent IS Specification. |
| 53 | Supply, fabrication, erection of LT Pillar Box for Tailless Unit after making Plinth of Height 300 mm above ground level LT Pillar Box Size- 1650X1050X520 mm with Gate and Proper Locking arrangement (Canopy of 15 Degree), should be made of Galvanised steel sheet.All work will be done as per RESSPO Norms & relevent IS Specification. |
| 54 | Supply and complete installation of SMC Box of size 450x375x200 mm for 25 kVA to 100 kVA Transformer on Pole (Box made out of (Thermostate Plastic) Sheet Moulding Compound by the process of Hot Press Compression moulding confirming to IS: 13410, SMC base or Doors shall not soften or bend on Heating, Doors fitted to Base by concealed hinges, Thickness- 2mm, Tolerence : +/- 5%) including provision of LT Fuse Protection set suitable for Transformer (All material including Aluminium Lugs, Clamp, Nuts & Bolts etc shall be supplied by the contractor.) |
| 55 | Fixing of Dist. Boxes on LT Pole including all Clamps and material for mounting, connection & sealing with connection of consumer service cable |
| 56 | Guarding of 11 KV line with GI Wire along with lacing |
| 57 | Dismantling of Old line with Loading, Unloading, carriage of Scrap material to Store from site Please Enable Macros to View BoQ information |