| 1 | Wiring for light point with 1.5 sq.mm FRLS/HFFR PVC insulated copper conductor single core cable in surface/ recessed medium class PVC conduit, with modular switch, modular plate, suitable GI box and earthing the point with 1.5 sq.mm FRLS/HFFR PVC insulated copper conductor single core cable etc. as required. |
| 2 | Wiring for fan point with 1.5 sq.mm FRLS/HFFR PVC insulated copper conductor single core cable in surface/ recessed medium class PVC conduit, with modular switch, modular plate, suitable GI box and earthing the point with 1.5 sq.mm FRLS/HFFR PVC insulated copper conductor single core cable etc. as required. |
| 3 | Wiring for exhaust fan point with 1.5 sq.mm FRLS/HFFR PVC insulated copper conductor single core cable in surface/ recessed medium class PVC conduit, with modular switch, modular plate, suitable GI box and earthing the point with 1.5 sq.mm FRLS/HFFR PVC insulated copper conductor single core cable etc. as required. |
| 4 | Wiring for call bell point with 1.5 sq.mm FRLS/HFFR PVC insulated copper conductor single core cable in surface/ recessed medium class PVC conduit, with modular switch, modular plate, suitable GI box and earthing the point with 1.5 sq.mm FRLS/HFFR PVC insulated copper conductor single core cable etc. as required. |
| 5 | Wiring for twin control light point with 1.5 sq.mm FRLS/HFFR PVC insulated copper conductor single core cable in surface / recessed medium class PVC conduit, 2way modular switch, modular plate, suitable GI box and earthing the point with 1.5 sq.mm FRLS/HFFR PVC insulated copper conductor single core cable etc. as required. |
| 6 | Wiring for circuit/ submain wiring along with earth wire 2 X 1.5 sq. mm + 1 X 1.5 sq. mm earth wire of FRLS/HFFR PVC insulated copper conductor, single core cable in surface/ recessed medium class PVC conduit as required. |
| 7 | Wiring for circuit/ submain wiring along with earth wire 2 X 2.5 sq. mm + 2 X 1.5 sq. mm earth wire of FRLS/HFFR PVC insulated copper conductor, single core cable in surface/ recessed medium class PVC conduit as required. |
| 8 | Wiring for circuit/ submain wiring along with earth wire 2 X 4 sq. mm + 1 X 4 sq. mm earth wire of FRLS/HFFR PVC insulated copper conductor, single core cable in surface/ recessed medium class PVC conduit as required. |
| 9 | Wiring for circuit/ submain wiring along with earth wire 2 X 10 sq. mm + 1 X 6 sq. mm earth wire of FRLS/HFFR PVC insulated copper conductor, single core cable in surface/ recessed medium class PVC conduit as required. |
| 10 | Supplying and fixing suitable size GI box with modular plate and cover in front on surface or in recess, including providing and fixing 3 pin 5/6 A modular socket outlet and 5/6 A modular switch, connections etc. as required. |
| 11 | Supplying and fixing suitable size GI box with modular plate and cover in front on surface or in recess, including providing and fixing 6 pin 5/6 & 15/16 A modular socket outlet and 15/16 A modular switch, connections etc. as required. |
| 12 | Supplying and fixing suitable size GI box with modular plate and cover in front on surface or in recess, including providing and fixing 2 nos. 3 pin 5/6 A modular socket outlet and 2 nos. 5/6 A modular switch, connections etc. as required. (For light plugs to be used in non residential buildings). |
| 13 | Supplying & fixing suitable size GI box with modular plate and cover in front on surface or in recess including providing and fixing 25 A modular socket outlet and 25 A modular SP MCB, \\"C\\" curve including connections, painting etc. as required. |
| 14 | Supplying and fixing call bell/ buzzer suitable for single phase, 230 V, complete as required. |
| 15 | Installation, Testing and Commissioning of Upto 450 mm sweep exhaust fan in the existing opening, including making good the damage, connection, testing, commissioning etc. as required. |
| 16 | Extra for fixing the louvers/ shutters complete with frame for a exhaust fan of all sizes. |
| 17 | Supplying and fixing 8 way , Double door single pole and neutral, sheet steel, MCB distribution board, 240 V, on surface/ recess, complete with tinned copper bus bar, neutral bus bar, earth bar, din bar, interconnections, powder painted including earthing etc. as required. (But without MCB/RCCB/Isolator) |
| 18 | Supplying and fixing 5 A to 32 A rating, Single pole 240/415 V, 10 kA, \\"C\\" curve, miniature circuit breaker suitable for inductive load of following poles in the existing MCB DB complete with connections, testing and commissioning etc. as required. |
| 19 | Supply and fixing of 40 Amp. DP MCB(10KA) C Curve |
| 20 | Supplying and fixing DP sheet steel enclosure on surface/ recess along with 25/32 A 240 V \\"C\\" curve DP MCB complete with connections, testing and commissioning etc. as required. |
| 21 | Supply and laying of one number PVC insulated and PVC sheathed/ XLPE Power Aluminium Cable of 1.1 KV Grade of 2C x 6 Sq.mm. on wall surface as required. |
| 22 | Earthing with G.I. earth pipe 4.5 Meter long, 40 mm dia including accessories, and providing masonry enclosure with cover plate having locking arrangement and watering pipe etc. with charcoal/ |
| 23 | Supplying and laying 6 SWG G.I. wire at 0.50 Meter below ground level for conductor earth electrode, including connection/ termination with GI thimble etc. as required. |
| 24 | Add for invertor wiring in wiring point for light/fan/plug points complete.(4+2+4= 10 Nos. for each residence). |
| 25 | Supply of fresh air Fan 300 mm. Make-Crompton and equivalent. |
| 26 | Supply of 10 Watt LED Bulb Philips Make and equivalent. |
| 27 | LED Batten light (System lumen efficacy ≥120 <135 lm/Watt) Supplying, installation, Testing & Commissioning of 18-22 Watt LED surface mounted Batten light of following body material and construction as per IS : 10322 with driver (Replaceable) as per the requirement with Driver efficiency >85%, Operating voltage AC 140270 Volt, frequency 50/60 hz, Operating temp range -5 0C to 40 0C, internal surge protectionof 2.5 KV with Short & Open circuit protection ,THD < 10% , P. F.≥0.95, IP20, CRI >80, Flicker free (flicker should be below 5 %), life time (LED,Driver & electrical circuitry), of minimum 50000 Burning Hours with 70% of initial Lumen maintained till life nds, CCT 3000°K / 4000°K / 5700°K /6500°K |
| 28 | (As per ANSI Bin), SDCM(Standard Deviation Colour Matching) <3, Maximum power consumption should not more than the specified rating and Fixture shall be of relevant BIS standard. Manufactures Word Mark/ Name Engraved/ Embossing / Screen printing on housing. complete in all respect i/c external connections with 1.5 sq.mm FRLS /HFFR, PVC insulated copper conductor single corecable and earthing etc. as required with Minimum 5 yearOEM warranty. System lumen efficacy ≥120 <135 lm/Watt output . LM79 & LM80 Test report and all testing required for LED fixtures as per BIS shall be submitted. Shape size and CCT shall be as approved by Engineer-in Charge as per requirement. (Thermal management: heat sink of aluminium housing such that LED junction temperature shall not rise above 90°C). Powder coated die cast /Extruded aluminium Body (Thickness > 1.20 mm) |
| 29 | Supply, Installation, Testing and Commissioning of 1200mm, service value ≥ 6.0 CM/Min/Watt, air delivery 210 CM/Min (Minimum) ceiling fan with Brush Less Direct Current (BLDC) Motor, class of insulation: B, 3 nos. metal( Aluminium alloy) blades, 30 cm long down rod, 2 nos. canopies, shackle kit, safety rope, copper winding, (CM/M/W) minimum as below, 350 RPM (tolerance as per IS : 374-2019), THD (Total Harmonic Distortion) less than 10%, suitable for operation with regulator for speed control and all remaining accessories including safety pin, nut bolts, washers, temperature rise=75 0C (max.), insulation resistance more than 2 mega ohm, suitable for 230 V, 50 Hz, single phase AC supply, Ceiling Fan compliant to IS 374:2019 fan i/c external connections with 1.5 sq.mm FRLS/HFFR, PVC insulated copper conductor single core cable and earthing etc. as required. steel/Al body Power Factor not less than 0.9, Service Value Note - 1- Rates are inclusive of all taxes but excluding GST which shall be paid extra as applicable 2- Labour cess @ 1% will be deducted from contractor's bill at the time of payment Please Enable Macros to View BoQ information |