| 1 | Earth filling including Cutting. of earth in odinary soil (loam, clay or sand) includy lift 1.5m and lead 50.m. The earth from cutting will be used in making embankment in 20cm layer with a lead of 8km. with ramming dressing the surface to requried level Slope all complete as pes direction of E/Iinculding earth cutting, Cost of earth 8km Cantage cost, louding, unloading. ete all Comp P.W.D. SI No.(253A+231a) 2022 |
| 2 | Earthwork: Excavation in trenches for foundations,pipes cables etc. in ordinary soil (Loam, Clay or Sand) including lift upto 1.5 m lead upto 50m and drassing of sides and ramming of bottom disposal of surplus excavated earth as directed by Engineer- in- charge with lead of 50 m 2.6 DSR 2023 |
| 3 | Cement Concrete with 4cm. Guage brick ballast fine sand of 1:25 F:M and cement in proporation of 8:4:1 in foundation and under floors including supply of all meterials. labour T&P etc all complete. S.I. No 275/2022 |
| 4 | M-150 brick work in 1:4 cement and coarse sand mortar in foundation and plinth in Cement mortar 1:4 (1 cement: 4 coarse sand). including all materials, labour and T&P etc. required for proper completion of work. DSR 6.1.1 2022 |
| 5 | 12 mm. thick plaster with 1 : 4 (one part cement & Four parts of coarse sand of 2.75 F.M.) over brick work minimum thickness not to be less than 1 cms. Including supply of all material , labour , T & P etc. required for proper completion of the work. SI 584/2022 |
| 6 | Providing and fixing stainless steel (Grade 304) railing made of Hollow tubes, channels, plates etc., including welding, grinding, buffing, polishing and making curvature (wherever required) and fitting the same with necessary stainless steel nuts and bolts complete, i/c fixing the railing with necessary accessories & stainless steel dash fasteners, stainless steel bolts etc., of required size, on the top of the floor or the side of waist slab with suitable arrangement as per approval of Engineer-in-charge (for payment purpose only weight of stainless steel members shall be considered excluding fixing accessories such as nuts, bolts, fasteners etc.). |
| 7 | 40 mm thick fine dressed stone flooring over 20mm (average) thick base of cement mortar 1\\"5 (1 cement: 5 corse sand ) with joints finished flush, red sand stone 11.28.1 DSR2023 |
| 8 | Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate) finished with a floating coat of neat cement, including cement slurry, but excluding the cost of nosing of steps etc. complete. 11.3.1 40 mm thick with 20 mm nominal size stone aggre. S.I. 4.1.4 DSR 2023 |
| 9 | Finishing walls with Acrylic Smooth exterior paint of required shade :13.46.1 New work (Two or more coat applied @ 1.67 ltr/10 sqmover and including priming coat of exterior primer applied on previsully paint on old surface.@ 2.20 kg/10 sqm) DSR 13.46.1/2023 |
| 10 | Horticulture WorkUprooting rank vegetation and weeds by digging the area to a depth of 60 cm, removing all weeds and other growth with roots by forking repeatedly, breaking clods, rough dressing, flooding with water, uprooting fresh growths after 10 to 15 days and then fine dressing for planting new grass, including disposal of all rubbish with all leads and lifts. (Item No-2.12 DSR-2020) (A.R) |
| 11 | Supply and stacking at site dump manure from approved source, including carriage upto 5km lead complete (manure measured in stacks will be reduced by 8% for payment) Screened through sieve of I.S designation 20 mm. (item No-2.4.1 DSR-2020) (A.R) |
| 12 | Spreeding of sludge, dump manure and/or good earth in required thickness as per direction of Officer-in-charge (cost of sludge, dump manure and/or good earth to be paid separately). Item No-2.8 DSR-2020 (A.R) |
| 13 | Mixing earth and sludge or manure in the required proportion specified or directed by the Officer-in-Charge. Item No-2.9 DSR-2020 (A.R) |
| 14 | Providing and laying Selection no-1 doob grass turf with earth 50mm to 60mm thickness of existing ground prepared with proper level and ramming with require tools wooden and then rolling the surface with light roller make the surface smoothen and light watering the same and maintenance for 30 days or more till the grass establish properly, as per direction of the Officer in charge. Item No-2.34 DSR-2020 (A.R) |
| 15 | Providing and stacking of Ficus panda of height 45-60 cm. with 6-7 branches and healthy foliage in bag of size 25 cm as per direction of the officer-in-charge. (Item No-8.26 DSR-2020) |
| 16 | Providing and stacking Jasmine grandiflorum (chameli) of height 30 cm to 45 cm. in 20 cm size of Earthen pots / Plastic pots & as per direction of the officer-in-charge. (Item No-9.8 DSR-2020) |
| 17 | Providing and stacking of Hamelia patens of height 60-75 cm. with 6-8 branches in poly bags of size 25 cm as per direction of the officer-in-charge (Item No.8.32 DSR-2020) |
| 18 | Providing and displaying of Dracaena rosea plant, having ht. 30 cm & above with 8 to10 leaves, well developed, fresh and healthy in 20 cm size of Earthen pot/Plastic pot & as per direction of the officer-in-charge (Item No-3.52 DSR-2020) |
| 19 | Providing and stacking of Tabernaemontana coronaria (chandni variegated) of height 45-60 cm. with 3-4 branches earthen pots of size 20 cm as per direction of the officer-in-charge. (Item No-8.61 DSR-2020) |
| 20 | Providing and Displaying Golden Bottle brush Topiary well developed with fresh & healthy foliage 5 to 6 big ball 115 to 180 cm ht in 40 cm Cement Pot as per direction of the officer-in-charge (Item No-5.33 DSR-2020) |
| 21 | Providing and Displaying Topiary of Casuarina fresh & healthy having 5 to 6 specific shape and size ball well developed 195 to 210 cm ht. in 40 cm Cement Pot as per direction of the officer-in-charge (Item No-5.41 DSR-2020) |
| 22 | Planting of topairy plants(i) Digging holes in ordinary soil and refilling the same with the excavated earth mixed with manure or sludge in the ratio of 2:1 by volume (2 parts of stacked volume of earth after reduction by 20% 1 part of stacked volume of manure after reduction by 8%) flooding with water dressing including removal of rubbish and surplus earth if any with all leads and lifts cost of manure, sludge or extra good earth if needed paid separately): holes 45 cm dia and 45 cm deep (2.14.4 DSR 2016)(ii) Plantation of Tree shrubs, and hedge at site i/c 306 watering and removal of unserviceable material s as per direction of officer in charge (excluding cast of plant & water) 2.57.1 Trees Plant (2.57 DSR 2016)(iii) Using Antitarmite 20 gm per pit as a medicine for the plant.(iv) Vermicampost 0.5kg per pit as a Fertilizer for the growth of plant etc. all complete As per analysis attached |
| 23 | Plantation of Trees, Shrubs, and Hedge at site i/c watering and removal of unserveiceable material’s as per direction of officer in charge (excluding cast of plant & water) 2.57.3 Hedge Plant /Ground cover (item No- 2.57.3 DSR-2020) |
| 24 | Complete maintenance of the entire garden features having as per yard stick in the garden area i.e. lawn trees, shrubs, herbs, edge, flower beds, foliages, creepers etc. including hoeing, weeding, pruning, replacement of plants, gap filling, watering, mowing of lawn, grass cutting by lawn mover and brush cutter, removal of garden waste, applying insecticide, pesticide & fertilizers (whenever required) top dressing of lawn with good earth and manure and maintenance of other garden related works as directed by office-in-charge (Cost of Good Earth, Manure, Fertilizer, Insecticide, Pesticide will be provided by the Department & lawn mover and brush cutter with fuel and other T & P material/articles shall be provided by the contractor.) and as per direction of officer in charge. 2.40.5 Play grounds/ Public parks (1Mali for 2.00Acre). (Item No-2.40 DSR-2020) A.R. (Per Month Rate= 1.65 Per Year Rate=1.65 X12= Rs. 19.80) |
| 25 | Same as abave item for Second Year |
| 26 | Same as abave item for Third Year |
| 27 | Topiary cutting/shaping of plant removing of cut materials, cleaning, hoeing of plants complete sensing hoeing of trees (topiary) watering manure department and as per discretion of officer in charge. (height of topiary above 120cm.) item no 2.38.2. DSR 2020(Per Month Rate= 65.55 Per Year Rate= 65.50 X 12= Rs. 786) |
| 28 | Same as abave item for Second Year |
| 29 | Same as abave item for Third Year Please Enable Macros to View BoQ information |