| 1 | Carriage of PCC/ST Pole 9 mtr./11 mtr. And other loose line material from store/other site to site work as per required. |
| 2 | Carriage all type of loose line material from ESC store unnao /sub station store /other site to site as per required and vice versa. |
| 3 | Dismantling of old damaged pole /double pole and X arm ,brackets ,insulators, channels and other hardware fittings. |
| 4 | Erection of new PCC/ST single pole include digging of pits and fitting of all accessories . |
| 5 | Erection of PCC /ST double pole structure include digging of pits and fitting of all accessories. |
| 6 | Carriage and shifting of old re-usable old pole from site to site and their erection and fitting of all accessories. |
| 7 | Replacement of old and damaged ABC from LTOH lines. |
| 8 | Opening and reconnection of consumer connections for shifting or replacement of pole. |
| 9 | Re-Sagging of conductor, on old line after erection/repair of pole, binding of conductor etc. |
| 10 | Opening of H.T./L.T. Jumpers/Re-jumpering from the exiting H.T.O.H./L.T.O.H. Line for erection work. |
| 11 | Grouting of pole with cement brick ballast and coarse sand as per RESPO norms. |
| 12 | Repairing of OLD and Damaged ST pole (Rotted Bottom) by welding MS Sheet / No angel size 45x45x6 mm 750 mm long 3 side. |
| 13 | Digging of cable trench in cable fault area size 60 cm wide and one meter deep in:(a)Normal soil/Kharanja Road/Metallic Road after work complete pit back filling ad remaining pack cable trunch etc. |
| 14 | Making of cable box for 11 KV 3x70 to 3x185 mm2 for XLPE/Pillca cable (jointing kit/cable box/state through cable box provided by department). |
| 15 | Fabrication/Modifications of MS Items/Nuts & Bolts as per requirement of site condition. |
| 16 | Making jumpers from cable box to line, cable support section poles of each phase. |
| 17 | Fixing of stay rod and its erection and grouting by fitting of stay clamp, stay wire and its proper binding and tightening etc. |
| 18 | Chopping of tree branches lying in the route of exiting line touching the tree branches to the phase line conductor making fault to the feeder, for 3\\" to 8\\" dia or as per requirement of site. |
| 19 | Replacement and Installation testing and commissioning new/old 11KV/33KV CT/PT unit and all related work |
| 20 | Supply and Fixing of below material |
| 21 | Holding Clamp For PCC/ST Pole |
| 22 | F Clamp for PCC/ST Pole |
| 23 | LT Clamp / Stay Clamp for PCC/ST Pole |
| 24 | LT Shackle Insulator Please Enable Macros to View BoQ information |