| 1 | Loading Carriage and unloading of PCC/ST pole from Electricity store center Unnao /Sub Station store/other site to site work as per required and vice versa. Distance 0-70 Km. |
| 2 | Loading Carriage and unloading of CT/PT unit from ESC store Unnao/Sub station store/other site to site work as per required and vice versa. |
| 3 | Carriage all type loose line material from ESC store Unnao/Sub station store/other site to site work as per required and vice versa. |
| 4 | ACSR Weasel Conductor |
| 5 | Three Phase A.B. Cable of diff. Size |
| 6 | LT PVC Cable size 1x400 sqmm |
| 7 | Dismantling of old damaged pole/double pole and X-arms, brackets, insulators channels and all hardware fitting. |
| 8 | Erection of PCC/ST pole for fitting of X-Arms, brackets insulators and other hardware fittings. |
| 9 | Erection of Double Pole structure including digging of pit and fitting of all accessories complete. |
| 10 | Placement of 10/16 KVA T/F & 25/63/100 KVA Transformer on Existing damage single /Double pole and Re-Installation and commissioning old T/F on new single/double pole in same place including dressing damaged cable, lugs, jumping & connecting Earthing of body & neutral as per required. |
| 11 | Carriage of damaged T/F 25/63/100/160/250/400 KVA under UGP from site tom ESC store Unnao and carriage of healthy T/F From store Center Unnao To Dump Site |
| 12 | Dismantling re-usable old damaged pole/double pole and X-arms, brackets, insulators channels and all hardware fitting etc. |
| 13 | Dismantling /Laying/Repairing of repairing of aerial bunched cable from L.T.O.H. line ( To be replace/damaged) |
| 14 | Dismantling of old 11 KV/L.T. line including rolling back its conductor from work site to dump site |
| 15 | Digging of cable trench approx. 1200x1200 mm by JCB/Kachha Road/Pakka Road for suitable size for damaged cable joints/new cable lying. |
| 16 | Laying, stringing and sagging of 33 KV/11 KV/L.T. Line by ACSR conductor including all associated works and making clearance of road with joints/jumpers and binding of insulators as required |
| 17 | Replacement and Installation testing and commissioning New/old 11 KV/33 KV CT/PT unit and all related work. |
| 18 | Supply and fixing holding clamps for PCC/STP with nuts & Bolts |
| 19 | Supply and fixing Stay/LT clamps for PCC/STP with nuts & Bolts |
| 20 | Supply and fixing F clamps for PCC/STP with nuts & Bolts |
| 21 | Supply and fixing of stay Loop Insulator (Guy Insulator) |
| 22 | Making & fixing of cable box for 11 KV 3x70 to 3x300 mm2 for XLPE cable (Jointing Kit/Cbale box/ O/D and I/D cable box providing by department) |
| 23 | Grouting of pole with cement brick ballast and coarse sand as per standard specifications. |
| 24 | Repositioning of tilted PCC/ST pole |
| 25 | Repositioning of tilted ST pole by welding with 4 No. iron angle with proper grouting and plinthing of ST pole |
| 26 | Fixing of stay rod and its erection and grouting by fitting of stay clamp, stay wire and its proper binding and tighting etc. |
| 27 | Chopping of tree branches lying in te route of existing line touching the tree branches to the phase line conductor as per requirements of site. |
| 28 | Carriage of old conductor scrap from work site to substation dump site with loading unloading and proper placing Please Enable Macros to View BoQ information |