|
| 1 | PM057 Hire charges for JCB with bucket capacity more than 0.75 cum with fuel and driver. |
| 2 | 4.4.1 Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m.All kinds of soil. |
| 3 | 26.13.3 Digging holes in all kinds of soil, and refilling the same, with the excavated earth, mixed with well decayed farmyard manure (cost of well decayed farm yard manure to be paid separately)Hole 0.75 metre dia and 0.75 metre deep |
| 4 | 26.13.4 Digging holes in all kinds of soil, and refilling the same, with the excavated earth, mixed with well decayed farmyard manure (cost of well decayed farm yard manure to be paid separately)Hole 0.60 metre dia and 0.60 metre deep |
| 5 | 26.14 Supplying and planting in prepared pits and watering, healthy , vigorous growing , permanent trees including ,application of 10 ml chlorpyriphos 20% EC, planting desired disease free, 200 cm to 220 cm height ,5 cm to 6 cm calliper size stem , full of foliage ornamental tree sapling each to be supplied in 30cm x 30cm poly bags. |
| 6 | 26.18 Supply and planting of disease free healthy , vigorous growing more than 75 cm height permanent shrubs in already prepared pits, supplied in 25 cm x 20 cm poly bags , application of 10 ml chlorpyriphos 20% E.C. termiticide each and watering supplied through the tractor tanker. |
| 7 | 26.15.1 Maintenance of tree including fertilization, application of insecticide, watering, weeding, training, pruning,.Maintenance of tree for one year for the 1st three years of age including weeding, hoeing , plant protection , watering from Deptt. source , application of 10 ml chlorpyriphos four times, 0.0289 cum FYM each,50 gm urea and 50 g DAP twice ,replacement of casualty ,disposal of debris and other activities.etc. |
| 8 | 26.19.1 Maintenance of shrub for one year including weeding, hoeing, plant protection, watering from Deptt. source, application of 10 ml chlorpyriphos four times in a year , 0.0289cum FYM each, 20 gm urea and 20 gm DAP twice, replacement of casualty etc. with same species and same age of plant.Individual shrubs. |
| 9 | 26.53 Watering of trees, shrubs, ground covers etc. through tractor tanker of 5000 litre capacity including cost of water with all leads and lifts and including cost of water, fuel ,filling of tanker, watering at site with all leads and lifts as per direction of officer - in-charge.(for 1 No. Tree 30 litres water per plant 27 no . irrigations per year , shrub 20 litres/ per plant 27 no irrigations per year , lawn 2.5 cm layer or 25 litre/sqm 50 no irrigations per year , ground cover / flower bed / rose bed 2.5 cm layer or 25 litre/sqm 40 no. irrigations per year , hedge for 2.5 cm layer or 25 litre/sqm 40 no. irrigations per year , Pot plant 3 litre water daily 250 irrigations per year. |
| 10 | 26.63.2 Providing and fixing steel tree guardMS circular tree guard with wire mesh, having 4 No. legs of angle iron size 25x25x3mm, 1.80 metre. height, 3 No rings of M.S Flats of 25 x 6 mm, 60cm dia and fixing of wire mesh size 50x75mm. Tree guard in two halves bolted together with 8mm dia & 30 mm long bolts, and fixing 250 mm X 100 mm iron plate, fixed in ground with 1:2:4 cement concrete, complete in all respects. Minimum weight should be 23 kgs. Please Enable Macros to View BoQ information |