Name of Work:- Electric Pole Shiffting & Raising Work Under - PMGSY-III (Navegaon to Devgaon Bridge)
Sl. No.
Item Description
1
Electric Pole Shiffting & Raising Work
2
Electric Pole Shiffting & Raising Work under Package No.MP-01-EL-P2-18/Balagaht-02 (Offer Based on SSR issued by MPRRDA Effective from -As per SOR 2024-25 (M.P.P.K.V.V.com- Ltd).) as per detailed BOQ attached in Annex-II A. Please Enable Macros to View BoQ information MPRRDA, PIU-PIU-01 Balaghat Annex-II A Bill of Quantity Details for the Percentage(%) Rate Tender Based As per SOR 2024-25 (M.P.P.K.V.V.com- Ltd) District :-Balaghat, PIU-Balaghat 02, Package No. :- MP01 EL-P2-18/Balaghat-02 S.No. Block Name of the Road Length in m.
3
Total Total Bridge Length 150.0 Amount of Construction Cost 536758.0 Amount of Mantenance Cost Total Amount of PAC 536758.0 Sl. No. Serial Number Item Code Description of item Unit Quantity Rate Amount
4
2.0 Task No.- Micellaneous, Task Name - Misc Capital Rate
5
- TOTAL 157588.07 - Task No.- NC-15.2 Material , Task Name - NC-15.2 Material
6
- TOTAL 158866.0 Task No.- NC-15.3 Material , Task Name - NC-15.3 Material
7
- TOTAL 110100.28
8
- TOTAL 110204.0 G. TOTAL 536758.0 426554.35 536758.35 The estimated rates indicated in Column No. 7 are inclusive of All Taxes. Design suply labour. Transportation electric pole shifting/Raising/Testing in commissioing of lines in all tespects and comprising of follwing material as per MP Poorv Kshetra Vidyut Vitran Company Ltd.
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.