| 1 | GST % for the tender Please select the rate of GST in cell AY13. Rate selected shall be applicable for the entire BoQ. |
| 2 | Mech- Supply |
| 3 | Supply and delivery of Steel Flanges (ASME B16.5) as per technical specifications from approved vendors specified in tender document : |
| 4 | 14\\" WNRF 300# |
| 5 | 12\\" WNRF 300# |
| 6 | 10\\" WNRF 300# |
| 7 | 8\\" WNRF 300# |
| 8 | 6\\" WNRF 300# |
| 9 | 4\\" WNRF 300# |
| 10 | 3\\" WNRF 300# |
| 11 | 2\\" WNRF 300# |
| 12 | 1\\" WNRF 300# |
| 13 | 18\\" WNRF 150# |
| 14 | 14\\" WNRF 150# |
| 15 | 12\\" WNRF 150# |
| 16 | 10\\" WNRF 150# |
| 17 | 6\\" WNRF 150# |
| 18 | 4\\" WNRF 150# |
| 19 | 3\\" WNRF 150# |
| 20 | 2\\" WNRF 150# |
| 21 | 1\\" WNRF 150# |
| 22 | 14\\" BLRF 300# |
| 23 | 12\\" BLRF 300# |
| 24 | 10\\" BLRF 300# |
| 25 | 18\\" BLRF 150# |
| 26 | 14\\" BLRF 150# |
| 27 | 12\\" BLRF 150# |
| 28 | 3\\" BLRF 150# |
| 29 | 2\\" BLRF 150# |
| 30 | 12\\" SORF 150# |
| 31 | 4\\" SORF 150# |
| 32 | Supply and delivery of Gaskets (ASME B16.20) as per technical specifications from approved vendors specified in tender document: |
| 33 | 14\\" SWMG ANSI 300# |
| 34 | 12\\" SWMG ANSI 300# |
| 35 | 10\\" SWMG ANSI 300# |
| 36 | 8\\" SWMG ANSI 300# |
| 37 | 6\\" SWMG ANSI 300# |
| 38 | 4\\" SWMG ANSI 300# |
| 39 | 3\\" SWMG ANSI 300# |
| 40 | 2\\" SWMG ANSI 300# |
| 41 | 1\\" SWMG ANSI 300# |
| 42 | 18\\" SWMG ANSI 150# |
| 43 | 14\\" SWMG ANSI 150# |
| 44 | 12\\" SWMG ANSI 150# |
| 45 | 6\\" SWMG ANSI 150# |
| 46 | 4\\" SWMG ANSI 150# |
| 47 | 3\\" SWMG ANSI 150# |
| 48 | 2\\" SWMG ANSI 150# |
| 49 | Supply and delivery of Steel Fasteners as per technical specifications from approved vendors specified in tender document: |
| 50 | Fasteners for Flanges 18\\" x 150# (1.125\\" Dia. X 6.50\\" Length) |
| 51 | Fasteners for Flanges 14\\" x 150# (1.000\\" Dia. X 6.00\\" Length) |
| 52 | Fasteners for Flanges 12\\" x 150# (0.875\\" Dia. X 5.50\\" Length) |
| 53 | Fasteners for Flanges 6\\" x 150# (0.750\\" Dia. X 4.50\\" Length) |
| 54 | Fasteners for Flanges 4\\" x 150# (0.625\\" Dia. X 4.00\\" Length) |
| 55 | Fasteners for Flanges 3\\" x 150# (0.625\\" Dia. X 4.00\\" Length) |
| 56 | Fasteners for Flanges 2\\" x 150# (0.625\\" Dia. X 3.75\\" Length) |
| 57 | Fasteners for Flanges 10\\" x 300# (1.0\\" Dia. X 7\\" Length ) |
| 58 | Fasteners for Flanges 8\\" x 300# (0.875\\" Dia. X 6.25\\" Length) |
| 59 | Fasteners for Flanges 6\\" x 300# (0.75\\" Dia. X 5.25\\" Length ) |
| 60 | Fasteners for Flanges 4\\" x 300# (0.75\\" Dia. X 5.00\\" Length ) |
| 61 | Fasteners for Flanges 2\\" x 300# (0.625\\" Dia. X 4.00\\" Length) |
| 62 | Supply and delivery of Pipe Fittings (ASME B16.9) as per technical specifications from approved vendors specified in tender document : |
| 63 | 18\\"x 8\\" ANSI 150# Un Equal Tee |
| 64 | 18\\"x 10\\" ANSI 150# Un Equal Tee |
| 65 | 10\\" x 8\\" ANSI 150# Un Equal Tee |
| 66 | 10\\" x 6\\" ANSI 150# Un Equal Tee |
| 67 | 10\\" x 4\\" ANSI 150# Un Equal Tee |
| 68 | 3\\" x 2\\" ANSI 150# Un Equal Tee |
| 69 | 10\\"x8\\" x 300# Unequal Tee |
| 70 | 10\\"x6\\" x 300# Unequal Tee |
| 71 | 18\\"ANSI 150# Equal Tee |
| 72 | 10\\" ANSI 150# Equal Tee |
| 73 | 4\\" ANSI 150# Equal Tee |
| 74 | 3\\" ANSI 150# Equal Tee |
| 75 | 2\\" ANSI 150# Equal Tee |
| 76 | 1\\" ANSI 150# Equal Tee |
| 77 | 10\\" 300# Equal Tee |
| 78 | 8\\" 300# Equal Tee |
| 79 | 6\\" 300# Equal Tee |
| 80 | 4\\" 300# Equal Tee |
| 81 | 3\\" 300# Equal Tee |
| 82 | 2\\" 300# Equal Tee |
| 83 | 10\\" 300# 90 deg LR Bend |
| 84 | 8\\" 300# 90 deg LR Bend |
| 85 | 6\\" 300# 90 deg LR Bend |
| 86 | 4\\" 300# 90 deg LR Bend |
| 87 | 3\\" 300# 90 deg LR Bend |
| 88 | 2\\" 300# 90 deg LR Bend |
| 89 | 1\\" 300# 90 deg LR Bend |
| 90 | 18\\" x 150# 90° LR Bend |
| 91 | 12\\" x 150# 90° LR Bend |
| 92 | 3\\" x 150# 90° LR Bends |
| 93 | 2\\" x 150# 90° LR Bends |
| 94 | 1\\" x 150# 90° LR Bends |
| 95 | 18\\" x 150# 45° LR Bends |
| 96 | 3\\" x 150# 45° LR Bends |
| 97 | 2\\" x 150# 45° LR Bends |
| 98 | 1\\" x 150# 45° LR Bends |
| 99 | 10\\" 300# 45 deg LR Bend |
| 100 | 8\\" 300# 45 deg LR Bend |
| 101 | 6\\" 300# 45 deg LR Bend |
| 102 | 14\\"x10\\" x Concentric Reducer x 150# |
| 103 | 10\\"x6\\" x Concentric Reducer X 300# |
| 104 | 2\\" 3000 Class St. NIPPLE |
| 105 | 18\\"x2\\" X 150# Weld-o-let |
| 106 | 10\\"x2\\" X 150# Weld-o-let |
| 107 | 10\\"x4\\" X 300# Weld-o-let |
| 108 | 18\\"x2\\" X 300# Weld-o-let |
| 109 | 12\\"x2\\" X 300# Weld-o-let |
| 110 | 10\\"x2\\" X 300# Weld-o-let |
| 111 | 8\\"x2\\" X 300# Weld-o-let |
| 112 | 6\\"x2\\" X 300# Weld-o-let |
| 113 | 10\\" Spectacle Blind 300# F/F |
| 114 | 8\\" Spectacle Blind 300# F/F |
| 115 | 6\\" Spectacle Blind 300# F/F |
| 116 | Supply and delivery of API 5L PSL2/ ASTM A106 Gr.B / ASTM A333 pipes at respective stations as per Station-wise Break up of material supply and as per technical specifications from approved vendors specified in tender document: |
| 117 | 10.75\\" OD x 0.365\\" WT, API5L X46 SEAMLESS OR ASTM A106 PIPE, BARE, SEAMLESS |
| 118 | 8.625\\" ODx 0.322\\" WT (Sch.STD) ASTM A 106 Gr B Bare Pipe |
| 119 | 6.625\\" ODx 0.280\\" WT (Sch.STD) ASTM A 106 Gr B Bare Pipe |
| 120 | 4.500\\" ODx 0.237\\" WT (Sch.STD) ASTM A 106 Gr B Bare Pipe |
| 121 | 3.500\\" ODx 0.216\\" WT (Sch.STD) ASTM A 106 Gr B Bare Pipe |
| 122 | 2.375\\" ODx 0.218\\" WT (Sch.XS) ASTM A 106 Gr B Bare pipe |
| 123 | 1.315\\" ODx 0.179\\"WT (Sch.XS) ASTM A 106 Gr B Bare pipe |
| 124 | 12.75\\" OD x 0.25\\" WT IS:3589 FE410 Pipe |
| 125 | Supply and delivery of Ball Valves (API 6D), Globe Valves (API 623 / BS 1873), Swing Check Valves (API 6D / BS 1868), Gate Valves (A PI 602) and Thermal Relief Valves, Pressure Safety Valve as per technical specifications from approved vendors specified in tender d ocument: |
| 126 | BALL API6D HOV F/F A/G TRU BOL 2IN 300# |
| 127 | BALL API6D HOV F/F A/G TRU BOL 10IN 300# |
| 128 | BALL API6D HOV F/F A/G TRU BOL 4IN 300# |
| 129 | BALL API6D,HOV,F/F, A/G,TRU,BOL,3IN 300# |
| 130 | BALL API6D,HOV,F/F, A/G,TRU,BOL,2IN 300# |
| 131 | 1\\" x 800# W/W, A/G, HOV, API 602 GATE VALVE |
| 132 | VLV,CHK,A216 WCB,A216 WCB,FLG,300,10IN |
| 133 | 2\\" x 2\\" 150# x300# F/F TRV |
| 134 | 2\\" x 2\\" 150# x150# F/F TRV |
| 135 | Spring Loaded Pressure Safety Valve, 4\\" x 6\\"-300# x 300# F/F |
| 136 | Spring loaded pressure safety valve - 3\\" X 4\\", 300# X 300#, F/F |
| 137 | 18\\"x ANSI 150# HOV F/F API 600 Gate Valve |
| 138 | 4\\"x ANSI 150# HOV F/F API 600 Gate Valve |
| 139 | Supply and delivery of Fire Fighting Equipment at respective stations as per Station-wise Break up of material supply and as per tec hnical specifications from approved vendors specified in tender document. |
| 140 | 4\\" x 150# High Volume Long Range Water-cum-Foam Monitor, stand post type, 1000-500 GPM, Manual Operated |
| 141 | 4\\" x 150# Water-cum-Foam Monitor, stand post type, 750-500 GPM Manual Operated |
| 142 | Supply and delivery of Y-type strainer (Cast /Plate Fabricated Body), F/F end connection at respective stations as per Station-wise Break up of material supply and as per technical specifications indicated in tender documents (Each strainer shall be supplied with 1 set of companion WNRF Flanges, Gaskets & Fasteners, 02 Nos. cover Gaskets, 1 spare filter element) |
| 143 | Y-type Strainer 10\\"x ANSI 300# |
| 144 | Y type strainer 8\\" X ANSI 300# |
| 145 | Mech-Service |
| 146 | \\"MLPU Installation (Motor Driven): Taking delivery of mainline pumping units having electrical motor, horizontal centrifugal pump (to be mounted on a common base plate ), Local control panel, Hydraulic coupling and other auxiliaries and accessories, grouting materials etc from designated storage loc ation within the Pump Station, shifting and placing the equipments in the pre-constructed foundation, carrying out levelling and gro uting, aligning the equipment, assembling together of all sub-assemblies, auxiliaries, mountings, fittings, interconnecting piping e tc., providing assistance for carrying out trial run of motor on no load, coupling the electrical motor with the pump, making final alignment, checking and testing of the complete pumping unit and completing the work in all respects in accordance with the drawings , manufacturer's installation instructions, technical specifications and as per the instruction of the Site Engineer / EIC. Note: 1. The auxiliaries and mountings shall include but not limited to pipe works etc., 2. Electrical & Instrumentation connections are not included in this item. 3. Weight of equipment is indicative only, Payment shall be done based on actual weight of equipment. 4. Gro uting material shall be supplied by owner.\\" |
| 147 | \\"Above Ground Equipments Installation: Taking delivery of equipments, shifting/transporting within station premises, placing on pre-constructed foundations, assembling tog ether all sub-assemblies, levelling, alignment, grouting, cleaning and flushing by water, draining, checking, testing, dressing and making good of the foundation and completing the work in all respects in accordance with the relevant drawings, manufacturer's inst allation instruction, specifications and instructions of Site Engineer / EIC., Note: Weight of equipment is indicative only, Payment shall be done based on actual weight of equipment \\" |
| 148 | Installation of Y-type strainer |
| 149 | \\"Above ground Process Piping Erection: Taking delivery & transporting of pipes from designated stock pile location /Designated godown both from outside & inside station pr emises. Taking delivery of pipe fittings, steel flanges, spiral wound metallic gaskets & fasteners from designated location within s tation premises, transporting the same to site, fabrication and erection of above ground piping including cutting, edge preparation, bending, threading, lining up, welding and installing pipes and pipe fittings, flanges, elbows, equal and reducing outlet tees,conc entric/eccentric reducers, y-type strainers, drain funnels, vent pipes and tapping for instruments such as pressure gauges, thermal relief valves, thermowells etc., installing above ground at all elevations connecting with equipment nozzles, valves, vessels, in li ne instruments etc., welded and threaded pipe line of different pressure ratings, flushing pipes by water after cleaning by compress ed air, hydrostatic testing of each section to the specified pressure, draining the water, tie-in, final cleaning-up and dispoal of wastes and surpluses including providing all inputs such as labour, material, equipments and consumables necessary to perform the wo rk (other than those specifically under taken by the owner in this contract) and completing the work in all respects in accordance w ith the drawings, specifications and instructions of Site Engineer / EIC. Thickness and Grade mentioned in the item are for referenc e only and may vary. Payment shall be based on OD.\\" |
| 150 | 18\\" OD x 0.375\\"/ 0.438\\"/ 0.500\\" WT APL 5L Pipe |
| 151 | 10 NPS (10.75\\" OD x 0.250\\"/ 0.280\\"/ 0.365\\"/ 0.438\\" WT) APL 5L / ASTM A106 Pipe |
| 152 | 8 NPS (8.625\\" OD x 0.250\\"/ 0.277\\"/ 0.312\\"/ 0.322\\"/ 0.375\\"/ 0.438\\" WT) API 5L/ ASTM A106/ A333 Pipe: |
| 153 | 6 NPS (6.625\\" OD x 0.250\\"/ 0.280\\" WT) API 5L/ ASTM A106/ A333/ A53 Pipe |
| 154 | 4 NPS 4.5\\" OD x 0.237\\"/0.337\\" WT ASTM A106/ A333/ A53 Pipe |
| 155 | 3 NPS (3.5\\" OD x 0.216\\"/ 0.438\\" WT) ASTM A106/ A333/ A53 Pipe |
| 156 | 2 NPS (2.375\\" OD x 0.218\\"/ 0.344\\" WT) ASTM A106/ A333/ A53 Pipe |
| 157 | 1 NPS (1.315\\" OD x 0.179\\"/ 0.250\\" WT) ASTM A106/ A333/ A53 Pipe |
| 158 | Under ground piping for Process piping (with PU/3LPE Coating):Taking delivery of bare Pipes, pipe fittings, steel flanges, spiral wound metallic gaskets & fasteners from designated location within station premises transporting the same to site, fabrication and erection of underground piping including cutting, edge preparation, bending, threading, lining up and welding, excavating, trenching in all kind of soil to specific depths as indicated in drawings and installing pipes and all types of pipe fittings like flanges, elbows, equal and reducing outlet tees, concentric/eccentric reducers, drain funnels, vent pipe and tapping for instrument such as pessure gauges, thermal relief valves, thermowells etc., underground at elevations indicated in the drawing connecting with equipment nozzles, valves, vessels, in-line instruments etc.,Cleaning exposed steel surfaces of Bare Pipes, Pipe Joints, Fittings, Flanges,equipment and valves etc. by sand blasting or with power wire brush (wherever sand blast cleaning is not possible) free of dust, grease, mill scales etc. and applying single layer polyurethane coating(PU) using 100% solvent free elastomeric plyurethane/ liquid epoxy, with approved materials,Equipment etc, holiday detection of the coating, cleaning of coated pipes by water flushing after cleaning by compresed air,hydrostatic testing of each section to the specified pressure, draining the water, tie-in, back filling, restoration of site final cleaning up and disposal of water and surpluses, providing all inputs such as labour, materials equipment and consumable necessary to perform the work (other than those specifically undertaken to be supplied by the owner under the contract) and completing the work in all respects in accordance with the drawings, specifications and instructions of the Site Engineer / EIC. In case of 3LPE coated pipes, weld joints shall be PU coated. Note: 1. Thickness and Grade mentioned in the item are for reference only and may vary. Payment shall be based on OD. 2. Payment for external PU/ epoxy coating shall be done separately as per relevant SOR item. |
| 159 | 18\\" OD x 0.375\\"/ 0.438\\"/ 0.500\\" WT APL 5L Pipe |
| 160 | 3 NPS (3.5\\" OD x 0.216\\"/ 0.438\\" WT) ASTM A106/ A333/ A53 Pipe |
| 161 | Above ground piping for Fire Water Services: (with internal epoxy coating at welding joints, fittings and flanges): Taking delivery of internal epoxy coated pipes, pipe fittings, steel flanges, spiral wound metallic gaskets & fasteners from designated location within station premises, transporting the same to site, fabrication and erection of above ground piping including cutting, edge preparation, bending, threading, lining up, welding and installing pipes and pipe fittings, flanges, elbows, equal and reducing outlet tees, concentric/eccentric reducers, y-type strainers, drain funnels, vent pipes and tapping for instruments such as pressure gauges, thermal relief valves, thermowells etc., installing above ground at all elevations connecting with equipment nozzles, valves, vessels, in line instruments etc., welded and threaded pipe line of different pressure ratings, flushing pipes by water after cleaning by compressed air, hydrostatic testing of each section to the specified pressure, draining the water, tie-in, final cleaning-up and disposal of wastes and surpluses including providing all inputs such as labour, material, equipments and consumables necessary to perform the work (other than those specifically under taken by the owner in this contract).The scope shall also include cleaning of internal surface of pipes conforming to SSPC SP-10 at all location where coating has been distroyed due to welding and repairing the internal surface by application of 2-pack cold cured Isophthalic polyster acrylic co-polymer glass flake filled /Liquid epoxy / Equivalent with coating of thickness 700-1000 Microns. Internal coating shall be done at the inner surface of pipe ends, Flanges, pipe fittings, valves, etc so that the internal surface of piping is not directly exposed to water, and completing the work in all respects in accordance with the drawings, specifications and instructions of Site Engineer / EIC. Thickness and Grade mentioned in the item are for reference only and may vary. Payment shall be based on OD. |
| 162 | 12.75\\" ODx 0.250\\" WT IS3589 Pipe |
| 163 | 4.5\\" ODx 0.237\\" WT ASTM A106/ ASTM A53/ API 5LGr B Pipe: |
| 164 | Under ground piping for Fire Water Piping (with external PU/3LPE Coating and internal epoxy coating at welding joints, fittings and flanges): Taking delivery of internal coated Pipes, pipe fittings, steel flanges, spiral wound metallic gaskets & fasteners from designated location within station premises, transporting the same to site, fabrication and erection of underground piping including cutting, edge preparation, bending, threading, lining up and welding, excavating, trenching in all kind of soil to specific depths as indicated in drawings and installing pipes and all types of pipe fittings like flanges, elbows, equal and reducing outlet tees, concentric/ eccentric reducers, drain funnels, vent pipe and tapping for instrument such as pessure gauges, thermal relief valves, thermowells etc., underground at elevations indicated in the drawing connecting with equipment nozzles, valves, vessels, in-line instruments etc.,Cleaning exposed steel surfaces of Bare Pipes, Pipe Joints, Fittings, Flanges,equipment and valves etc. by sand blasting or with power wire brush (wherever sand blast cleaning is not possible) free of dust, grease, mill scales etc. and applying 100% solvent free elastomeric plyurethane (PU)/ liquid epoxy on external surface, with approved materials, Equipment etc, holiday detection of the coating, cleaning of internal surface of pipes conforming to SSPC SP-10 at all location where internal coating has been distroyed due to welding and repairing the internal surface by application of 2-pack cold cured Isophthalic polyster acrylic co-polymer glass flake filled /Liquid epoxy / Equivalent with coating of thickness 700-1000 Microns. Internal coating shall also be done at the inner surface of pipe ends, Flanges, pipe fittings, valves, etc so that the internal surface of piping is not directly exposed to water; cleaning of coated pipes by water flushing after cleaning by compresed air,hydrostatic testing of each section to the specified pressure, draining the water, tie-in, back filling, restoration of site final cleaning up and disposal of water and surpluses, providing all inputs such as labour, materials equipment and consumable necessary to perform the work (other than those specifically undertaken to be supplied by the owner under the contract) and completing the work in all respects in accordance with the drawings, specifications and instructions of the Site Engineer / EIC. Note: 1. In case of 3LPE coated pipes, weld joints shall be PU coated.Thickness and Grade mentioned in the item are for reference only and may vary. Payment shall be based on OD. 2. Payment for external PU/ epoxy coating shall be done separately as per relevant SOR item. |
| 165 | 12.75\\" ODx 0.250\\" WT IS3589 Pipe |
| 166 | \\"Installation of Swing Check Valves: Taking delivery of valves of all types and pressure rating from the designated location within station premises, transporting the sa me to site, erecting above ground on pre-constructed foundations or underground including earth work in excavation and filling for u nder ground valves at elevations specified in the drawings, priming and painting of above ground valves, PU Painting of under ground portions (if applicable) including all inputs, labour, material and consumable (other than those specifically undertaken to be supp lied by the owner) and completing the work in all respects in accordance with the drawings, manufacturer's installation instructions and specifications and instructions of the Site Engineer / EIC. Note: Payment for conctruction of foundations shall be done seprately as per relevant SOR item.\\" |
| 167 | 10\\", 150#/300#, F/F: |
| 168 | 8\\", 150#/300#, F/F: |
| 169 | 6\\", 150#/300#, F/F: |
| 170 | 2\\", 150#/300#, F/F: |
| 171 | \\"Installation of Ball Valves & other type of valves: Taking delivery of valves of all types and pressure rating from the designated location within station premises, transporting the sa me to site, erecting above ground on pre-constructed foundations or underground including earth work in excavation and filling for u nder ground valves at elevations specified in the drawings, priming and painting of above ground valves, PU Painting of under ground portions (if applicable) including all inputs, labour, material and consumable (other than those specifically undertaken to be supp lied by the owner) and completing the work in all respects in accordance with the drawings, manufacturer's installation instructions and specifications and instructions of the Site Engineer / EIC. Note: Payment for conctruction of foundations shall be done seprately as per relevant SOR item.\\" |
| 172 | 18\\", 150#/300#, F/F |
| 173 | 10\\", 150#/300#, F/F |
| 174 | 8\\", 150#/300#, F/F |
| 175 | 6\\", 150#/300#, F/F |
| 176 | 4\\", 150#/300#, F/F |
| 177 | 3\\", 150#/300#, F/F |
| 178 | 2\\", 150#/300#, F/F |
| 179 | 1\\", 150#/300#, F/F |
| 180 | 1\\", 150#/300#, W/W |
| 181 | 1\\", 600#/800#/900#/1500#, W/W |
| 182 | 4\\"x 6\\" Pilot Operated Surge Pressure Relief Valve (SRV) / Pressure Relief valve(PRV) 300# F/F |
| 183 | 3\\"X4\\" Pilot Operated Surge Pressure Relief Valve (SRV) / Pressure Relief valve(PRV) 300# F/F |
| 184 | 2\\" x 2\\" (300#/ 150# x 150#) F/F Thermal Relief Valve |
| 185 | Installation of Manual High Volume Long Range Foam Monitor 750 GPM capacity stand post type with inlet flange of 4\\" X 150# MHVLR |
| 186 | Installation of Stand Post Type double way fire hydrant fitted with 2 Nos of single landing valve complete as per IS: 5290 alongwith 4\\" x 150# WNRF Flange |
| 187 | \\"Radiographic Inspection: Inspection of welding by Digital Radiography (CR) or by conventional film radiographic method on all types of piping including proce ssing of images/ films and interpreting the results of weld quality and reporting the same to the Site Engineer together with recomm endations as to the acceptability or otherwise of the welds, submitting the finished radiographic films as may be approved or direct ed by Engineer-in-Charge inclusive of supply of all pesonnel, labour, materials, equipment, consumable, inputs, etc. and providing a ll services complete in all respects as envisaged in the contract documents. Note: i) Payment will be on the basis of number of welds of the respective size radiographed and shall be all inclusive for the complete job of radiographic inspection as envisaged in the contract document. ii) Radiography not involving full girth weld will be paid at 50% of the rate for full girth weld for the respective size. iii) For set-on type branch welding, the rate for radiography will be as applicable to the branch pipe size. iv) Repeat radiography of individual welds due to defective films or repair of welds shall be done at contractor's cost. v) In case where radiography is not possible, verification by utrasonic testing shall be done at contractors cost., vi) Magenetic particle inspection as and where required shall be done at Contractors cost. vii) In case of conventional film radiography, all films shall be digitised and submitted to EIC/ Site Engineer in USB drives. viii) In case of Digital/ Computed Radiography, native files along with image/ pdf files shall be submitted to EIC/ Site Engineer in USB drives.\\" |
| 188 | 18\\" NB Pipe Joints RT |
| 189 | 10\\" NB Pipe Joints RT |
| 190 | 8\\" NB Pipe Joints RT |
| 191 | 6\\" NB Pipe Joints RT |
| 192 | 4\\" NB Pipe Joints RT |
| 193 | 3\\" NB Pipe Joints RT |
| 194 | 2\\" NB Pipe Joints RT |
| 195 | Double Cut Joint: Cutting (Hot/ Cold cutting) of portion of existing piping upto and including a length of 500 mm, trimming, grindin g, bevelling the edges, adding spool piece of required length / tee and the corresponding pipe size, thickness, adjoining and weldin g both the ends including supply of all inputs such as labour, materials, equipment, consumables etc. necessary to perform and compl ete the work in all respect as per specification and instruction of the Site Engineer / EIC. Note: The job also include evacuation o f product from the piping section after isolating the section and flushing with water and its disposal. |
| 196 | 18\\" NB |
| 197 | 8\\" NB |
| 198 | 6\\" NB |
| 199 | Fabrication of Mitre Bends - Long Radius: 10\\" NB - Mitre Bend (angle more than 45° & up to 90°) Taking delivery of pipes from design ated locations, transporting the same to site and fabrication of carbon steel piping specials by cutting, edge preparation, welding, all types of testing including radiography & including supply of all inputs such as labour, materials (other than those specificall y undertaken to be supplied by the Owner under the contract), equipments, consumables etc. necessary to perform and completing the w ork in all respects in accordance with drawings, specifications and instructions of the Site Engineer / EIC. |
| 200 | Dismantling of existing over ground piping works of all types and sizes by opening flange joints or by gas cutting/ cold cutting or any other approved suitable means without damaging other portions of work. The job includes evacuation of the contents of the piping , cutting the pipes to required sizes as directed, taking out valves, flanges, tees, bends, gaskets nuts, bolts etc. attached suppor ts alongwith any instruments such as pressure gauge, temperature gauge etc. handling, transporting and storing at owner's designated store in safe manner to avoid damage including supply of all labour, materials, equipments, consumables etc. necessary to perform a nd complete the work in all respects as per drawings, instructions of the Site Engineer / EIC (payment shall be made on linear measu rement of dismantled piping including bends tees etc.). Note : The contractor shall indicate the piping system to be dismantled and shall take specific approval from the Site engineer before dismantling of pipe. Certain redundant pipes which in the opinion of the Owner need not be retrieived, those items shall not be dismantelled. |
| 201 | Carrying out stress and flexibility analysis of process, utility and firewater piping including creation of model in CAESAR-II (late st edition) software from isometric/ assembly piping drawings/ site measurements, analysis as per relevant codes/ standards, interpr etation, recommendations of suitable mitigation measures and design changes, if required as per specification and instructions of EI C/ Site Engineer. Soft copy of Model in software (CARSAR-II) to be provided in USB drive to EIC/ Site Engineer. |
| 202 | Development of as built drawings, data sheets, system details covering all additional facilities incorporated under this project in the station and furnishing them as reference document. Additionally, electronic copy of the documents shall also be furnished in USB drives to EIC/ Site Engineer |
| 203 | Providing Temporary Barricading made of GI/ steel sheet with angle iron frame (40x40x6) in panels of 1.5 to 2.0m including lateral/ vertical angle bracing/ steel beam at bottom for stability, earth filling up to 300mm height above ground level, maintaining the bar ricading during construction at site, removing the same and clearing site after construction complete in all respects as per instruc tions of Site Engineer |
| 204 | Pipe size 3 inch NB to 6 inch NB: Carrying out modification in already fabricated and/ or erected pipe due to change in drawing or a s required by site condition, taking delivery of pipe, pipe fittings, steel flanges, spiral wound metallic gaskets & fasteners from designated location within station premises, transporting the same to site, cutting of pipe and / or weld joint , edge preparation, bending, lining up, welding and installing pipes and pipe fittings, flanges, elbows, equal and reducing outlet tees, concentric/ecce ntric reducers, y-type strainers, drain funnels, vent pipes and tapping for instruments such as pressure gauges, thermal relief valv es, thermowells etc., installing above ground at all elevations connecting with equipment nozzles, valves, vessels, in line instrume nts etc., welded and threaded pipe line of different pressure ratings, flushing pipes by water after cleaning by compressed air, hyd rostatic testing of each section to the specified pressure, draining the water, tie-in, final cleaning-up and dispoal of wastes and surpluses including providing all inputs such as labour, material, equipments and consumables necessary to perform the work (other t han those specifically under taken by the owner in this contract) and completing the work in all respects in accordance with the dra wings, specifications and instructions of Site Engineer / EIC. (Item is to be operated upon approval of SIte Enginner, Item covers o nly modification / rework jobs.) |
| 205 | Pipe size 8 inch NB to 28 inch NB: Carrying out modification in already fabricated and/ or erected pipe due to change in drawing or as required by site condition, taking delivery of pipe, pipe fittings, steel flanges, spiral wound metallic gaskets & fasteners from designated location within station premises, transporting the same to site, cutting of pipe and / or weld joint , edge preparation, bending, lining up, welding and installing pipes and pipe fittings, flanges, elbows, equal and reducing outlet tees, concentric/ecc entric reducers, y-type strainers, drain funnels, vent pipes and tapping for instruments such as pressure gauges, thermal relief val ves, thermowells etc., installing above ground at all elevations connecting with equipment nozzles, valves, vessels, in line instrum ents etc., welded and threaded pipe line of different pressure ratings, flushing pipes by water after cleaning by compressed air, hy drostatic testing of each section to the specified pressure, draining the water, tie-in, final cleaning-up and dispoal of wastes and surpluses including providing all inputs such as labour, material, equipments and consumables necessary to perform the work (other than those specifically under taken by the owner in this contract) and completing the work in all respects in accordance with the dr awings, specifications and instructions of Site Engineer / EIC. (Item is to be operated upon approval of SIte Enginner, Item covers only modification / rework jobs.) |
| 206 | Providing the air compressor of suitable capacity for flushing of annular space of carrier casing as per direction of EIC. One day s hall be equivalent to 24 hrs. Please Enable Macros to View BoQ information |
| 207 | Providing the air compressor of suitable capacity for flushing of annular space of carrier casing as per direction of EIC. One day s hall be equivalent to 24 hrs. Please Enable Macros to View BoQ information |