|
| 1 | Excavating over areas, n exc 1.5 m deep and getting out in hard/dense soil complete all as specified and directed. |
| 2 | Excavating over areas, exc 1.5 m to n exc 3.0 m deep and getting out in hard/dense soil complete all as specified and directed. |
| 3 | S & F for Steel work in tubular pipes (vertical poles / trusses / purlins /Rafter) including welding etc. complete using ERW or induction butt welded tubes conforming to I.S.1161-1979 grade St.-240 complete all as specified and directed. |
| 4 | S & F steel work of Fe-410-W(Gde- E-250) quality-B Mild steel plates, plain or chequered, 5mm thick or over in thickness in available sizes complete all as specified and directed (6mm thk for Wall & Floor and 12mm thk for Roof). |
| 5 | S & F Mild Steel Pressed handles Size of handle in 150 mm, cast type, anodised all as specified and as directed by Engineer-in-charge. |
| 6 | S & F for 125 mm size of Butt hinges, heavy weight, cold rolled mild steel, and fixed all as specified and as directed by Engineer-in-charge. |
| 7 | M & L for Preparation of new steel surfaces of any description, over 10cm in width or girth, not otherwise described with one coat of primer with Red oxide and two coat of synthetic enamel paint all as specified and as directed by Engineer-in-charge. (For interior side) |
| 8 | M & L for Preparation of new steel surfaces of any description, over 10cm in width or girth, not otherwise described with one coat of primer with Red oxide and two coat of Black Bituminous paint all as specified and as directed by Engineer-in-charge. (For exterior side) |
| 9 | M&L for 12 mm thick Perforated particle board for insulation purposes, fixed with screw to Steel plate on walls and roof, complete all as specified and directed by Engineer in Charge. |
| 10 | M&L for polythin film black/white, 150 micron laid around the bunker (sides and top), before the earth refilling complete all as specified and directed by Engineer in Charge. |
| 11 | Returning. filling in, including spreading, leveling, watering and well ramming in layers not exceeding 25cm thick each, complete all as specified and directed by Engineer-in-Charge. |
| 12 | Labours only for soil filling over modular bunker including watering and consolidation, complete all as specified and directed by Engineer-in-Charge. |
| 13 | Removing excavated material exc. 1.50 km but n exc. 5 km and depositing where directed, complete all as specified and directed by Engineer-in-Charge. Please Enable Macros to View BoQ information |
| 14 | Removing excavated material exc. 1.50 km but n exc. 5 km and depositing where directed, complete all as specified and directed by Engineer-in-Charge. Please Enable Macros to View BoQ information |