| 1 | Fly Ash Brick masonry using Fly Ash Bricks (25cmX12cmX8cm) having crushing strength not less than 75Kg/sqcm with dimensional tolerance +2% in cement mortar (1:6) after immersing the bricks for six hours in water before use in SUPERSTRUCTURES in all floors including splays, cutting, circular moulding, corbelling, champhering and similar such type of works, scaffolding, watering, curing, including cost, conveyances, royalties, taxes of all materials and cost of all labour with T&P required for the work etc. complete as per specification & direction of Engineer-in-charge.(i)Ground floor |
| 2 | (ii)First floor |
| 3 | (iii)Second floor |
| 4 | R.C.C work of M-20 Grade having a minimum compressive strength (in work test) 200kg/sqcm in 15cm cubes at 28 days after mixing and test conducted in accordance with IS 456 and IS516 using 20mm down graded size black hard crusher broken granite stone chips as per the design mix of approved quality and from approved quarry including hoisting, lowering, laying and compaction by using vibrators, watering, curing for 28days, centering, shuttering and finishing the exposed surface smooth, providing grooves or beads where necessary including cost, conveyances, royalties, taxes of all materials and cost of all labour with T&P required for the work etc. complete in all respect but excluding cost of MS Rod or tor steel and binding wires & labour charges for bending binding and tying the grills etc. as per specification and direction of the Engineer-in-Charge.(A)LINTEL (i)Ground floor |
| 5 | (ii)First floor |
| 6 | (iii)Second floor |
| 7 | Cutting, straightening coiled or bent up M.S. Rod or tor steel (TATA/ SAIL/Vizag/ Zindal etc)including bending, binding, welding and joining if necessary and tying the grills and placing in position as required for R.C.C. Work and for providing fan hooks as required, hoisting, lowering, laying including cost, conveyances, taxes of M.S. Rod or tor steel and binding wires of 18 to 20 gauge and labour required for the work for bending, binding and tying the grills in all floors (payment will be made on standard weight of B.I.S. for M.S. Rods or tor steel only) etc. complete as per specification & direction of Engineer-in-charge.(i)Ground floor |
| 8 | (ii)First floor |
| 9 | (iii)Second floor |
| 10 | Providing 12mm thick cement plaster in cement mortar (1:6) in all floors finished smooth to out side smooth surface of brick walls after racking out joints, scrapping & cleaning the surface & finishing the plaster surface smooth using wooden float only to proper plumbs & level and making necessary grooves, beads & drip course to give required ornamental finish as per drawing, watering, curing, scaffolding, screening sand etc. complete with cost, conveyances, royalties, taxes of all materials and cost of all labour with T&P, sundries required for the work etc. complete as per specification & direction of Engineer-in-charge.(i)Ground floor |
| 11 | (ii)First floor |
| 12 | (iii)Second floor |
| 13 | Providing 16mm thick cement plaster in cement mortar (1:6) in all floors finished smooth to inside rough surface of brick walls after racking out joints, scrapping & cleaning the surface & finishing the plaster surface smooth using wooden float only to proper plumbs & level and making necessary grooves, beads & drip course to give required ornamental finish as per drawing, watering, curing, scaffolding, screening sand etc. complete with cost, conveyances, royalties, taxes of all materials and cost of all labour with T&P, sundries required for the work etc. complete as per specification & direction of Engineer-in-charge. (i)Ground floor |
| 14 | (ii)First floor |
| 15 | (iii)Second floor |
| 16 | Finishing the wall surface with Acrylic Wall putty (water based) of approved make and finished smooth & even surface to receive painting including cost of scaffolding staging charges with cost, conveyances, taxes of all materials, cost of labour, T&P required for the work etc. complete as per specification & direction of the Engineer-in-charge.(i)Ground floor |
| 17 | Painting two coats with approved plastic emulsion paint over a coat of wall primer to inside surface of walls after cleaning the surface including watering, curing with cost, conveyance, taxes of all materials, labour, T&P required for the work etc. complete as per specification & direction of Engineering-in-charge.(i)Ground floor |
| 18 | (ii)First floor |
| 19 | (iii)Second floor |
| 20 | Supplying and fixing of ceramic glazed wall tile (30cmx30cm) (20cmx20cm) having thickness plain/printed series of 6.5mm to 6.7mm confirming to IS 13753 in dado ,skirting,riser of steps on 12mm thick in cement mortar(1:3) including cost, conveyances, taxes of all materials and cost of all labour with T&P required for the work etc. complete in all respect as per direction of Engineer-in-charge |
| 21 | Providing vitrified floor tile of size 600mm x 600mm of approved make confirming to IS 13755 over floor of 20mm thick bed in cement mortar(1:4)joined in neat cement slurry mixed with pigment to match the shade including cost, conveyances, taxes of all materials and cost of all labour with T&P required for the work etc. complete 60cmx60cm plain (lvory) in all respect as per direction of Engineer-in-charge |
| 22 | Providing, fitting and fixing of aluminium false ceiling with aluminium angle at border,aluminium T of size 2'X2' spacing C/C with 12mm thick Novapan board including cost, conveyances, taxes of all materials and cost of all labour with T&P required for the work etc. complete in all respect as per direction of Engineer-in-charge |
| 23 | Providing and fixing 120 minutes of metal fire rated doors as per IS 3614 part-2:1992 for stability and intergrity. Pressed Galvanized steel confirming to IS 277 Specification. Door tested & approved in ARA (Automotive Research Association of India, Pune) for maximum rating of 2hrs. Door frame shall be double rebate profile of size 139 X 57 mm made out of 1.20 mm minium thick galvanized steel sheet depends on single & double leaf door. There should be kept for grouting with cement & sand slurry necessary for fire doors on the clear masonary opening. Door leaf shuld be 43mm thick fully flush double skin door. Doot leaf shall be maufactured from 0.8 mm thick galvanized steel depends on single or double door leaf door with 5mm thick Keralite glass of size 200x300. The internal construction of the door should be rigid reinforcement pads for receving appropriate hardware. The infill material shall be resin bonded honycomb core. All doors shall be factory prepared for receving approptriate hardware and provide with necessary reinforecement got hinges, locks and door closers, painting system will be powder coating finished with cost of all labour with T&P required for the work etc. complete in all respect as per direction of Engineer-in-charge Please Enable Macros to View BoQ information |