| 1 | fo|qr uxjh; forj.k [k.M&33 ds0oh0] VªkUl fgUMu] xkft;kckn ds vUrxZr vkus okys leLr 33@11 ds0oh0 midsUnzksa ij LFkkfir 11 ds0oh0 bUMksj isuy dh vko’;drkuqlkj ejEer dk dk;Z vks0 ,.M ,e0 en esa bZ&fufonk }kjk ckg~; ,tsUlh ds ek/;e ls djk;s tkus gsrqA |
| 2 | Opening of Pole (Bushing, Vaccum Interrupters Chamber, Auxiliary contacts Drive Insulators, Drive rod, Lifting rod, Leavers,etc as required) |
| 3 | Cleaning of carbonized Pole (Bushing, Vaccum Interrupters Chamber, Auxiliary contacts Drive Insulators, Drive rod, Lifting rod, Leavers, etc as required) |
| 4 | General overhauiling & Refitting of Pole (Bushing, Vaccum Interrupters Chamber, Auxiliary contacts Drive Insulators, Drive rod, Lifting rod, Leavers, etc as required) |
| 5 | Opening of operating Mechanism of Circuit breaker/Associated equipment as required (tripping lever, charging lever, interlock lever, locking drum mechanism springs, setting screw, stop pin, trip prop, set screw, spindle, lock nut, Trip roller coll assembly, release roller, ratchet, coil pot, main toggle,Tripping plunger, operating springs, Trip colls etc.) |
| 6 | Cleaning of operating Mechanism of Circuit breaker/Associated equipment as required (tripping lever, charging lever, interlock lever, locking drum mechanism springs, setting screw, stop pin, trip prop, set screw, spindle, lock nut, Trip roller coll assembly, release roller, ratchet, coil pot, main toggle, Tripping plunger, operating springs, Trip colls etc.) |
| 7 | General overhauling & Refitting of operating Mechanism of Circuit breaker/Associated equipment as required (tripping lever, charging lever, interlock lever, locking drum mechanism springs, setting screw, stop pin, trip prop, set screw, spindle, lock nut, Trip roller coll assembly, release roller, ratchet, coil pot, main toggle, Tripping plunger, operating springs, Trip colls etc.) |
| 8 | Opening, cleaning, decarbonization Refitting of Incoming terminal assembly outgoing terminal assembly connectors. |
| 9 | Opening, cleaning & general overhauling of spring charging motor. |
| 10 | Removing of old damage/defective control wire and dressing the wiring of breaker. |
| 11 | Repairing & General Overhauling of C&R panel & VCB panel having the work of cleaning, Decarbonization and fitting the parts of panel as requird (Amp. Meter and selector switch, voltmeter and selector switch, Indication lamps, remote control switch, push button, fault alarm bell, fuses, terminals etc.) Testing the above parts/instrument, replacement of damaged & defective parts, dressing of wiring, testing and make it into perfect working condition (Only labour charges) |
| 12 | Repairing of overcurrent and earth fault Numerical Relay, English Electric, ER, C&S, Ashida,ect. Make, having work to opening of relay/assoclated equipment as required, Cleaning of dust and carbon etc. General overhauling and setting of contact assembly, alignment etc, & make it into perfect working condition. Please Enable Macros to View BoQ information |