| 1 | Name of work : Repairing and Upkeeping different sub-assemblies of 24/96 Balram Dragline working in Nigahi Project which includes (A) Replacement of Bottom Wear plate of Tub Base (B) Re-tensioning of 04 nos. intermediate suspension rope (C) Repairing of worn-out grip of Shoe pad (LHS & RHS) along with fixing of plates in the bottom and side walls of Shoe pads both LHS & RHS at Nigahi Project. Maximum likely manpower to be deployed per shift : 15 Nos. (01 No. Highly skilled Supervisor, 06Nos. Skilled and 08 No. semi-skilled). |
| 2 | Replacement of bottom wear plates and repairing of damaged bottom plates of tub base of 24/96 Balram Dragline : Scope of work : 1) Digging of soil to prepare area for repairing of tub base. 2) Cleaning of tube base and different activities to be carried out parellely. 3) Repairing of damaged / worn out wear plate from tub base as required. 4) Grinding of tube base to make smooth surface. 5) Fabrication of wear plate, which is to be welded in tube base by means of grinding, edge prepration etc. 6) welding of wear plate in tub base. |
| 3 | Cost/charges for Replacement of bottom wear plates and repairing of damaged bottom plates of tub base including labour charges contractor profit ( required Highly skilled supervisor , Skilled Fitter, Skilled Welder and Semi-skilled manpower to be deployed as per job requirement) |
| 4 | Hire charges for welding machine 02 Nos. with all accessories for above mentioneed job at Sl No. 2 |
| 5 | Hire charges for gas cutting set 02 Nos. with all accessories for above mentioneed job at Sl No. 2 |
| 6 | Hire charges for grinder machine 02 Nos. with all accessories for above mentioneed job at Sl No. 2 |
| 7 | Hire charges for hand lamp 04 Nos. with all accessories for above mentioneed job at Sl No. 2 |
| 8 | Hire charges for Exhaust fan 04 Nos. with all accessories for above mentioneed job at Sl No. 2 |
| 9 | Hire charges for Hydrauli jack (200T) 02 Nos. with all accessories for above mentioneed job at Sl No. 2 |
| 10 | Hire charges for Misc. tools and tackles like chipping , hammer, , Tie -rods , Wedges , Hammers, crow bars etc. for the above mentioned job at Sl No. 2 |
| 11 | Hire charges for Transportation for the above mentioned job at Sl No. 2 |
| 12 | Retensioning of 04 Nos. Intermediate suspension rope of 24/96 Balram Dragline : Scope of work : (1) Fabrication of platforms. (2) Replacement of broken suspension rope. (3) Tensioning of 04 Nos. suspension ropes including broken rope. Note : Jointing electrode - 25 Kg and Industrial gases, Crane, Gouging electrode, Hydraulic rope tensioning Unit as per requirement will be provided by NCL. |
| 13 | Cost/charges for Fabrication of 04 Nos. platform including labour charges contractor profit ( required Skilled Fitter, Skilled Welder and Semi-skilled manpower to be deployed as per job requirement) Total 04 Nos. |
| 14 | Cost/charges for Tension of 04 Nos. rope and replacement of 01 rope including labour charges contractor profit ( required Skilled Fitter, Skilled Welder and Semi-skilled manpower to be deployed as per job requirement) |
| 15 | Hire charges for welding machine 02 Nos. with all accessories for above mentioneed job at Sl No. 3 |
| 16 | Hire charges for grinder machine 01 No. with all accessories for above mentioneed job at Sl No. 3 |
| 17 | Hire charges for gas cutting set 01 No. with all accessories for above mentioneed job at Sl No. 3 |
| 18 | Hire charges for hand lamp 04 Nos. with all accessories for above mentioneed job at Sl No. 3 |
| 19 | Hire charges for tools and tackles like sockets wrenches etc. for above mentioneed job at Sl No. 3 |
| 20 | Hire charges for safety items likes shoes helmets safety ropes for above mentioneed job at Sl No. 3 |
| 21 | Hire charges for special fixture holding ropes during for above mentioneed job at Sl No. 3 |
| 22 | Repairing of wornout grip of shoe pad ( LHS and RHS) along with fixing of plates in the bottom and side walls of shoe pades both LHS and RHS of 24/96 Balram Dragline : Scope of work : (1) Cleaning of surface area. (2) Cutting of plates of suitable dimensions (3) Welding of plates in the shoe grips (4) Welding of places in the bottom and side walls of shoe pads Note : Cutting electrode CG1 / equiv. - 80 Kg, Jointing electrode7016/7018/equiv 4mm - 125 Kg. , Magnies plate and Industrial gases as per requirement will be provided by NCL. |
| 23 | Cost/charges for Repairing of worn out grip of shoe structure 20 Nos. ( LHS and RHS) including labour charges ,contactor profit, etc. (labour consisting of Skilled fitter, skilled welder and semi skilled Helper manpower) |
| 24 | Repairing of worn out side walls of both LHS and RHS shoes of 24/96 Balram Dragline : Note : Cutting electrode CG1 / equiv. - 125 Kg, Jointing electrode7016/7018/equiv 4mm - 260 Kg., Magnies plate and Industrial gases as per requirement will be provided by NCL. |
| 25 | Cost/charges for Repairing of worn out side walls of both LHS and RHS shoes including labour charges ,contactor profit, etc. (labour consisting of Skilled fitter, skilled welder and semi skilled Helper manpower) |
| 26 | Cost/charges for Hiring of 3 nos. Welding machines with all accessories for all the above job at Sl No. 4&5 |
| 27 | Cost/charges for Hiring of 3 nos. Grinding machines with all accessories for all the above job at Sl No. 4&5 |