Tender For Hiring Of Poclains For Spreading/Accumulation & Loosening Of Stockpiles & Enhancing Loading & Stacking Through Hoppers For Loading Plant Dep.5, 10/11A, Bacheli-Chhattisgarh
TDR : 54824219
Tender Notice
BOQ
26 Days Left
Bacheli
Chhattisgarh
Tender For Hiring Of Poclains For Spreading/Accumulation & Loosening Of Stockpiles & Enhancing Loading & Stacking Through Hoppers For Loading Plant Dep.5, 10/11A
Name of Work:- Hiring of Poclains for spreading/accumulation & loosening of stockpiles & enhancing loading & stacking through hoppers for Loading Plant Dep.5, 10/11A
Sl. No.
Item Description
1
NMDC LIMITED BIOM BACHELI COMPLEX SCHEDULE OF QUANTITIES (BOQ) (RATES TO BE QUOTED BY THE CONTRACTOR IN BLUE COLORED UNLOCKED CELLS ONLY) Name of the Work: Hiring of Poclains for spreading/accumulation & loosening of stockpiles & enhancing loading & stacking through hoppers for Loading Plant Dep.5, 10/11A NAME OF TENDERER : Sl. No. DESCRIPTION UOM QUANTITY UNIT RATE(excl.GST)in Rs. AMOUNT
2
Providing of 01 no. of Excavator / Poclain (0.4 to 0.9 Cu. Mtr.) EX 110 including operator with POL and lubricants for spreading/ accumulation of CLO & fine of Dep. 5, and lump & fine of dep.10/11A at Loading Plant.
3
Providing of 01 no. of Excavator / Poclain (0.4 to 0.9 Cu. Mtr.) EX 110 including operator with POL and lubricants for spreading/ accumulation of CLO & fine of Dep. 5, and lump & fine of dep.10/11A at Loading Plant
4
Providing of 01 no. of Excavator / Poclain (0.85 to 1.50 Cu. Mtr.) EX 210 including operator with POL and lubricants for spreading/ accumulation of CLO & fine of Dep. 5, and lump & fine of dep.10/11A at Loading Plant
5
Providing of 01 no. of Excavator / Poclain (0.4 to 0.9 Cu. Mtr.) EX 110 including operator with POL and lubricants for enhancing loading and feeding into hopper at Loading Plant Total Amount excl. of GST in Rs 0.0 GST @ 18% 0.0 Gross Total Amount 0.0 Note:
6
Prices must be filled in the exact same format as given above. Any variation in format, description, unit, quantity or T&C, if noticed, may lead to rejection of the bid.
7
Bidders have to quote for all the items
8
In case of discrepancy between rates and amount quoted above, the quoted rates shall prevail and appropriate corrections shall be made by corporation during evaluation.
9
Adjustments made by the Corporation as a part of Correction of Errors in the quoted BOQ, shall be final and binding upon the bidders. If a bidder does not except the corrected calculation, their bid shall be rejected.
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.