|
| 1 | Line Part(HT Part)-RS (GI) Joist Pole 150x150 (11Mtr., 34.6 |
| 2 | 11 KV V Cross Arm (10.2 K.g. each) |
| 3 | Top bracket 100x50X6 mm GI channel (2kg |
| 4 | 100 Sqmm AAACConductor |
| 5 | PG Clamp for 100 Sqmm AAAC Conductor |
| 6 | 11 KV pin insulator polymer |
| 7 | H W fitting(B&S) 70KN, 3Bolt |
| 8 | Disc insulator (B&S) 70 KN polymer |
| 9 | Back Clamp GIF/11KV V Cross Arm |
| 10 | Earthing of Support (Coil Type) |
| 11 | Top Channel 100X50X6mm, 9.56KG/Mtr., ea |
| 12 | Fish Plate 50x6 mm., 2.36 kg/Mtr., each |
| 13 | Danger Plate, 2 no's. |
| 14 | Back Clamp for danger Plate 25X3 mm. fla |
| 15 | H.T. Stay set (Complete ) |
| 16 | H.T. Stay Insulator Type-C (2 No's.) |
| 17 | H.T. Stay clamp, 50x8 mm. flat, 3.14Kg/M |
| 18 | 7/10 SWG Stay Wire 15kg/stay |
| 19 | WIRE GINO.8 SWG/4.06MM For Earthing |
| 20 | GI barbed wire anticlimbing device 3 Kg. |
| 21 | Back Clamp for anticlimbing device 25X3 |
| 22 | GI Nut, Bolt & Washer of different sizes |
| 23 | Painting of Pole in Black & Yellow strip |
| 24 | Fixing of complete 11KV line Complete st |
| 25 | Concreting ratio 1:1.5:3 (500mmX500mmX18 |
| 26 | Couping ratio 1:1.5:3 with dimension (50 |
| 27 | Sub-Station Part-PSC Pole 9Mtr. 300 KG |
| 28 | LT Stay set Complete |
| 29 | 7/12 SWG GI stay wire, Grade -2 |
| 30 | LT stay Clamp ( 1.40Kg/pair) |
| 31 | LT Stay insulator |
| 32 | Pole Clamp for EYE hook for (XLPE Aerial |
| 33 | EYE hook for XLPE Aerial bunched Cable |
| 34 | Dead End Clamp suitable for messenger XL |
| 35 | Suspension Clamp with EYE hook for ABC |
| 36 | Cable 1.1KV AB 4Cx50+1Cx50+1Cx16Sqmm |
| 37 | IPC ConnectorType-A-main 50 to 150 sq.m |
| 38 | Spike (GI ) (using 50x6mm Flat welded wi |
| 39 | Coil Earthing |
| 40 | No-8 GI wire (Dia 4.6mm)0.131 KG/ Mtr.- |
| 41 | Danger plate (LT) |
| 42 | Back Clamp for danger Plate 25X3 mm. fla |
| 43 | GI barbed wire anticlimbing device 3 Kg. |
| 44 | Back Clamp for anticlimbing device 25X3 |
| 45 | GI Nut, Bolt & Washer of different sizes |
| 46 | RS (GI) JOIST Pole 150X150 (13Mtr., 34.6 |
| 47 | 33 KV V cross Arm (GI) 22Kg each |
| 48 | PG Clamp for 148 Sqmm AAAC Conductor |
| 49 | 33KV pin insulator polymer |
| 50 | H W fitting(B&S) 90KN,4 |
| 51 | Painting of Pole in Black & Yellow strip |
| 52 | Fixing of LT Complete stay set includes |
| 53 | Couping ratio 1:1.5:3 with dimension (50 |
| 54 | Concreting ratio 1:1.5:3 (500mmX500mmX15 |
| 55 | Service Connection (LT part)-Disc insulator (B&S) 90 KN polymer |
| 56 | Back Clamp F/33KV 'V' CROSS ARM |
| 57 | Earthing of Support ( Coil Type ) |
| 58 | H.T. Stay set (Complete ) |
| 59 | H.T. Stay Insulator Type-C (2 No's.) |
| 60 | H.T. Stay clamp, 50x8 mm. flat, 3.14Kg/M |
| 61 | 7/8 SWG Stay Wire 15kg/stay |
| 62 | Top Channel 100X50X6mm, 9.56KG/Mtr., ea |
| 63 | Fish Plate 50x6 mm., 2.36 kg/Mtr., each |
| 64 | Double Pole Belting Channel 75X40X 4.8mm |
| 65 | 50x50x6mm.GI Bracing Angle, 4.5Kg./mtr., |
| 66 | Danger Plate, 2 no's. |
| 67 | Back Clamp for danger Plate 25X3 mm. fla |
| 68 | GI barbed wire anticlimbing device 3 Kg. |
| 69 | GI Nut, Bolt & Washer of different sizes |
| 70 | Back Clamp for anticlimbing device 25X3 |
| 71 | Painting of Pole in Black & Yellow strip |
| 72 | Fixing of 33KV line Complete stay set in |
| 73 | Concreting ratio 1:1.5:3 (500mmX500mmX22 |
| 74 | Couping ratio 1:1.5:3 with dimension (50 |
| 75 | Dismantling Part-POLE PSC 9 METER 300 KG |
| 76 | CONDUCTOR 55 SQMM AAA |
| 77 | 1.1KV LT AB CABLE3X35+1X25+1X16 |
| 78 | POLE PSC 8 METER 200 KG Rs 43200.00 may be dudct for salvage charges Please Enable Macros to View BoQ information |