| 1 | Scraping eld paint with scapers, sand papering and washing with soap water or soda including scaffolding charges upto 5M height 159 |
| 2 | Removing old or cement plaster from wall including raking out joints 12 mm deep and removing the debris within 50 metres lead. |
| 3 | Dismantling and removing 2.5 cm thick artificial stone flooring including stacking the useful materials for reuse and removing the debris within 50 metres lead |
| 4 | Cement concrete (1:4:8) with 40 mm size Crosser broken hard granite metal including all cost of materials, labour, conveyance, royalty, Tools and Plants water for curing etc all complete as per OPWD specification required for the work to finished items of work. |
| 5 | Fly ash bricks 23cm x 11cm x 8cm size having crushing strength not less than 75 Kg/cm2 in cement mortar (1:6) in foundation and plinth including all cost of materials, labour, conveyance, royalty, Tools and Plants, water for curing etc. all complete, as per OPWD specification required for the work to finished items of work. |
| 6 | Fly ash bricks 23cm x 11cm x 8cm size having crushing strength not less than 75 Kg/cm2 in cement mortar (1:6) in Super structure including all cost of materials, labour, conveyance, royalty, Tools and Plants, water for curing etc. all complete, as per OPWD specification required for the work to finished Items of work. |
| 7 | Cement concrete (1:1%:3) with 12 mm size crusher broken hard granite chips including hosting and laying all cost of materials, labour, conveyance, royalty, cess. Tools and Plants water for curing etc. all complete as per OPWD specification required for the work to finished items of work |
| 8 | Dismantling brick or stone masonry in lime or cament mortar under 3.00 mir height including stacking the useful materials for reuse and removing the debris within 50 metres lead |
| 9 | Providing reinforcement for RCC work with cutting bending binding, placing in proper position as per design including cost of steel, binding wire and labour required for bending, binding |
| 10 | Rigid and smooth centering and shuttering for RCC works including false work and dismentalling then after casting including cost of materials complete in ground floor, RCC foundation, plinth band and footings bases of columns mass concrete pre-cast slabs etc |
| 11 | Rigid and smooth centering and shuttering for RCC works including false work and dismentalling then after casting including cost of materials complete in ground floor, RCC walls and fins including attached pillasters |
| 12 | Fixing of Antishid floor tiles size (300mm x 300mm) of 12 mm thick bed of Cement mortar(1:3) finished with neat cement slurry mix with pigments match to shade to flat position etc complete. Ground Floor |
| 13 | Fixing tiles (Ceramic) in dados skirting and risers of steps on 12mm thick cement plaster (1:3) jointed with neat cement slurry mixed with pigments to match the shade of the tiles including rubbing and polishing complete excluding cost of precast tiles. per 1 sqm (See Page no-90, Item no 17 of |
| 14 | Dismantiling and removing R.C.C colmn, beam, slab staircase, landing, lintel including stacking the useful materials for reuse and removing the debris within 50 metres lead |
| 15 | 12 mm thick C.P in CM (1:6) over smooth surface of Brick work including cost of materials with taxes, watering, curing etc |
| 16 | 16 mm thick C.P in C.M (1.6) over rough surface of Brick work and stone masonry work including cost of materials with taxes, watering, curing etc. |
| 17 | 6 mm thick cement plaster (1.4) finished smooth |
| 18 | Providing fitting, fixing of Al. door with anodized AL door section of 9202 as vertical member, 9201 as top. 9200 as bottom and middle member with frame section as 9221 with tapered clip No. 4660 and the frame to be completed by means of jointing angle No. 1855 including all cost of labour. T&P hire charges of drilling machine, labour charges etc. complete excluding cost of laminated board |
| 19 | Supplying, fitting & fixing of MS gate made up with standard M.S section duly fabricated with one coat priming including cost of all materials and labour. |
| 20 | Finishing walls with two coats water proofing weather coat cement paint with cement based wall putty (Water based) and wall primer of approved make and finished smooth and even surface to receive cement primer water bound including cost of scaffolding staging charges with cost of all materials taxes, labour T&P etc complete. |
| 21 | Finishing walls with water proffing cement Paint over one coat of cement washing of approved shade on new work two coat to give an even shade including cost of paint and labour required for the work |
| 22 | Painting two coat over door, window with approved paint over one coat of priming including cost of materials and labour required for the work. |
| 23 | Supplying all materials, labour, T & P and fitting fixing of water closet, squatting pan (Indian type WC pan conforming to IS2556 Part3- embeded in cement concrete (1:4:8) using hard granite metal 4cm nominal size all complete as per specification. Fixing water closet, squatting pan 500 mm x 440mm size white glazed Vitreous China Orissa Pattern squatting pan |
| 24 | Supplying all matenals, labour and T & P for fixing 100 mm size P' or 'S trap (with hom or with out hom) for water closet squatting pan including jointing the trap with pan in cement mortar (1.1) as per specification-100 mm dia |
| 25 | Supplying all materials labour and T & P Fixing in cement mortar (1:3) a pair of white vitreous china 250mm X 130 mm X 30mm foot rest for squatting pan water closet etc. All complete-pair of white Vitereous China 250mm X 130 mm X 30mm foot rest |
| 26 | Supplying all materials, labour and T&P and laying in trenches, unplasticized PVC pipes conforming to ASTM-D1785/04 [Sch-80] of the following nominal diameter and fittings including testing as per specification all complete |
| 27 | Supplying all materials, labour and T&P and fixing to walls, ceiling and floor unplasticized PVC pipes conforming to IS 4985 of Sch-80 the following nominal diameter with fittings and clamps including testing as per specification all complete 25mm dia PVC pipe (Sch-80) |
| 28 | 20mm dia PVC pipe (Sch |
| 29 | Supplying all materials, labour and T&P for fixing Brass screw down Stop cock/ Gun metal Full way valve of the following size conforming IS: 781-1995 as per specification all complete. 50mm dia G.M full way valve. |
| 30 | 25mm dia G.M full way |
| 31 | Supplying all material, labour and t&p for fitting and fixing following water supply fitting and toilet fixures conforming to I:S specification 20mm dia C.P conceald stop cock. |
| 32 | 15mm dia x50mm long C.P extention short piece |
| 33 | 15mm dia C.P extention flange. |
| 34 | 15mm diax450mm long pvc connection pipe |
| 35 | 15mm dia C.P long neck pillar cock. |
| 36 | Supplying of all materials, labour and T & P for providing, fitting, fixing of PVC SWR pipes after excavation or as per requirement with fittings and joining with solvent cement in stack line including supply bof nails and bobbins etc. all complete as per P.H. Specification110mm dia UPVC single socketed Pipes |
| 37 | 110mm dia PVC door bend |
| 38 | 110mm dia PVC trap |
| 39 | 110mm dia PVC cowl |
| 40 | 110mm dia PVC/MS Clamp |
| 41 | 110mm dia PVC Single junction with door |
| 42 | 75mm dia UPVC single socketed Pipes |
| 43 | Cutting holes through the brick masonry wall for taking PVC pipes and mending good to the damage etc. Complete-250mm to 375mm wall |
| 44 | Supplying all materials, labour T&P for Construction of INSPECTION Chamber as per P.H specification and design all Complete. |
| 45 | Supplying all labour and T&P for cleaning the swer line as peractual observation and direction of EIC |
| 46 | Supplying all labour T&P for removing the Sludge from Septic Tank by means of rope and G.I bucket and stacking the sludge outside the tank making temporary earthen drain and sand packing arround the tank where ever necessary etc complete |
| 47 | Supplying all materials, labour T&P for RCC well Ring Tank (0.90mtr x 1.20 mtr with 1.00 mtr stagging) including Fly Ash Bricks etc complete. |
| 48 | Supplying all Materials, labour T&P for Fitting, Fixing of 0.50 H.P Centerifugal Motor including all fittings etc complete. |
| 49 | Supplying, providing, all materials labour and ladder/ scoffolding, T&P for art painting/ 3D painting over coats of water proofing cement paint on walls/ streets (RCC or plast ered or CC or Bituminous base black top surface) as per direction of EIC including cost of cement paint, paint admixtures such as fabric stainer, acrylic emulsion etc with labour charges of artists and helpers etc. complete. |
| 50 | Earth work in all kind of soil within 50m. Initial lead and 1.5m. Initial lift icluding rough dressing and bracking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m. in depth and as per the direction of the engineer-in-charge. |
| 51 | Filling in foundatin and plinth with sand watered and rammed @798.90/cum |
| 52 | Fixing tiles (Chequed) in floor & dados skirting and risers of steps on 12mm thick cement plaster (1:3) jointed with neat cement slurry mixed with pigments to match the shade of the tiles including rubbing and polishing complete excluding cost of precast tiles. per 1 sqm (See Page no-90,Item no 17 of AoR-06) |
| 53 | Electrification 5.00% |
| 54 | Cost of disply board, Paint & Letter writing over disply board - LS (Paid as per Actual observation Please Enable Macros to View BoQ information |