|
| 1 | Excavation in trenches in any type of soil not exceeding 1.5 m wide and not exceeding 1.5 m in depth without hampering the existing services like PNG, NFS, Water supply line, Electric supply line Incl getting out Soft/Loose soil complete all as specified by Engr-in-charge. |
| 2 | Excavation in trenches in any type of soil (Earth work in excavation) by mechanical means (Hydraulic excavator) means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) without hampering the existing services like PNG, NFS, Water supply line, Electric supply line Including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5m, as directed by Engineer-incharge |
| 3 | Returning, filling in, including spreading, leveling, watering and well ramming in layers not exceeding 25 cm in any type soil complete all as specified and directed. |
| 4 | Removing of surplus soil not exceeding 50mtrs and depositing where directed at a level not exceeding 1.5 mtrs above the starting point complete all as specified and directed by Engineer-in-Charge |
| 5 | Taking up 300 mm bore, cast iron water mains (including all fittings) with spigot and socket ends and lead joints including burning out joints and recovering lead complete all as specified and directed. |
| 6 | Taking up, 250 mm bore, cast iron water mains (including all fittings) with spigot and socket ends and lead joints including burning out joints and recovering lead complete all as specified and directed. |
| 7 | Taking up 200 mm bore, cast iron water mains (including all fittings) with spigot and socket ends and lead joints including burning out joints and recovering lead complete all as specified and directed. |
| 8 | Taking up, 150 mm bore, cast iron water mains (including all fittings) with spigot and socket ends and lead joints including burning out joints and recovering lead complete all as specified and directed. |
| 9 | Supply, laying, connecting, jointing and testing of DI pipe of 300mm bore with spigot and socket ends, class K-7 conforming to IS: 8329/2000 suitable for (push-on) rubber gasket jointing with centrifugally applied inside cement mortar lining with sulpher resistant with a finishing layer of black bitumen coating on external surfaces in any length, laid in trenches as per IS 12288 (1987) complete all as specified and as directed. |
| 10 | Supply, laying, connecting, jointing and testing of DI pipe of 250mm bore with spigot and socket ends, class K-7 conforming to IS: 8329/2000 suitable for (push-on) rubber gasket jointing with centrifugally applied inside cement mortar lining with sulpher resistant with a finishing layer of black bitumen coating on external surfaces in any length, laid in trenches as per IS 12288 (1987) complete all as specified and as directed. |
| 11 | Supply, laying, connecting, jointing and testing of DI pipe of 200mm bore with spigot and socket ends, class K-7 conforming to IS: 8329/2000 suitable for (push-on) rubber gasket jointing with centrifugally applied inside cement mortar lining with sulpher resistant with a finishing layer of black bitumen coating on external surfaces in any length, laid in trenches as per IS 12288 (1987) complete all as specified and as directed. |
| 12 | Supply, laying, connecting, jointing and testing of DI pipe of 150mm bore with spigot and socket ends, class K-7 conforming to IS: 8329/2000 suitable for (push-on) rubber gasket jointing with centrifugally applied inside cement mortar lining with sulpher resistant with a finishing layer of black bitumen coating on external surfaces in any length, laid in trenches as per IS 12288 (1987) complete all as specified and as directed. Please Enable Macros to View BoQ information |
| 13 | Supply, laying, connecting, jointing and testing of DI pipe of 150mm bore with spigot and socket ends, class K-7 conforming to IS: 8329/2000 suitable for (push-on) rubber gasket jointing with centrifugally applied inside cement mortar lining with sulpher resistant with a finishing layer of black bitumen coating on external surfaces in any length, laid in trenches as per IS 12288 (1987) complete all as specified and as directed. Please Enable Macros to View BoQ information |