|
| 1 | Comprehensive maintenance of 50 LPH capacity RO System including cleaning of all filters, repairing/ replacement of all electrical and electronic spare parts & one time replacement of consumable filters (except membrane & Pre Filter) by attending complaints within 24 hours & four mandatory services per year etc. old dismantle shall be retained by the contractor complete as required. (07 Nos.- 01 Job) |
| 2 | Supply & Replacement of RO TFC Membrane 75 GPD Eureka Forbes make i/c testing, commissioning etc. as required old dismantle shall be retained by the contractor. |
| 3 | Supply and replacement of 20\\" Particulate / Sediment Filter Eureka Forbes make i/c Leak testing, commissioning etc. complete as reqd. at site. Dismantle shall be retained by the contractor. |
| 4 | Supply and replacement of Pre / Post Carbon Filter 20\\" make i/c Leak testing, commissioning etc complete as reqd at site. Dismantle shall be retained by the contractor. |
| 5 | Supply and fixing of 20\\" Pre Filter assly to prevent of excess silt in feed water to RO machines i/c Leak testing, commissioning etc. complete as reqd. at site. |
| 6 | Supply and fixing of Automated Switching on/off device as per level of water in storage tank/ Water cooler etc. as reqd. |
| 7 | Comprehensive Annual Maintenance of Eureka Forbes Aquaguard RO 3000 LPH i/c Six mandatory services (cleaning of all filters), repair/ replacement of all electrical and electronic spare parts, Raw Water Pump/ High Pressure Pump, Control Panel, and replacement of consumables like Spun Filters 20”, one time membrane cleaning as if any required, and i/c replacement of Sand / Carbon media as if required (except TFC RO Membrane set, antiscalant chemical, sand and carbon media filter). Attending complaints within 24 working hours with complete overhauling and servicing complete as reqd. (01 No.) |
| 8 | Supply & Replacement of TFC RO Membrane for 3000 LPH RO Plant i/c testing, commissioning etc. as reqd. (Old dismantle shall retained by contractor) |
| 9 | Supplying and Feeding of Anti Scalant Chemical for 3000 LPH RO Plant complete etc. as required. |
| 10 | Supplying and Installation of Filter Media of assorted sizes for 3000 LPH RO Plant complete etc. as required. |
| 11 | Supplying and Installation of Activated Carbon Media for 3000 LPH RO Plant complete etc. as required. |
| 12 | Supply and fixing of Automated Switching on/off device as per level of water in storage tank/ Water cooler etc as reqd. |
| 13 | Supplying and replacing of Multiport Valve for 3000 LPH RO i/c Leak testing, commissioning etc complete as reqd at site. Dismantle shall be retained by the contractor. |
| 14 | Comprehensive Annual Maintenance of Eureka Forbes Water Softening 6000 LPH i/c six mandatory services (cleaning of all filters), repair Raw Water Pump/ Output Pressure Pump, and replacement of consumables like Sediment media, Carbon media, supply and charging of Resin, salt as if any required Attending complaints within 24 working hours with complete overhauling and servicing complete as reqd.(01 No 01Job) |
| 15 | Supplying and filling of Filter Media of assorted sizes complete etc. as required. |
| 16 | Supplying and filling of Activated Carbon Media complete etc. as required. |
| 17 | Supplying and filling of Resin Media complete etc. as required. |
| 18 | Supplying, filling and Charging/activating Salt Media complete etc. as required. |
| 19 | Supply and replacement of Automated Switching on/off device as per level of water in storage tank/ Water cooler etc as reqd. |
| 20 | Supplying and replacing of Multiport Valve for 3000 LPH RO i/c Leak testing, commissioning etc complete as reqd at site. Dismantle shall be retained by the contractor. Please Enable Macros to View BoQ information |