| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge. All kinds of soil |
| 2 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 and for all lift. |
| 3 | Centering and shuttering including strutting, propping etc. and removal of form for (A) Foundations, footings, bases of columns, etc. for mass concrete. |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form for : Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for : Suspended floors, roofs, landings, balconies and access platform |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for : Edges of slabs and breaks in floors and wallsUnder 20 cm wide |
| 7 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500 D or more. |
| 8 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : Two or more coats on new work. |
| 9 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) |
| 10 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. |
| 11 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.In cement mortar |
| 12 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. |
| 13 | Providing and laying at or near ground level factory made kerb stone of M-25 grade cement concrete in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement: 3 coarse sand), including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5mm), including making drainage opening wherever required complete etc. as per direction of Engineer-in-charge (length of finished kerb edging shall be measured to calculate volume for payment). (Precast C.C. kerb stone shall be approved by Engineer-in-charge). |
| 14 | Taking out existing kerb stones of all types from footpath/ central verge, including removal of mortar etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge. |
| 15 | Taking out existing CC interlocking paver blocks from footpath/ central verge, including removal of rubbish etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge. |
| 16 | Providing and laying 60mm thick factory made cement concrete paver block of approved shape and colour of M -30 grade made of C&D waste by block making machine with vibratory compaction laid in required pattern and fixing over 20mm thick bed of Cement mortar 1:4 (1 cement : 4 coarse sand) etc. all complete as per the direction of Engineer-in-charge. |
| 17 | Providing and laying in position ready mixed or site batched design mix cement concrete for plain cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana/Ordinary Portland/Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and work ability without impairing strength; excluding the cost of centering, shuttering and finishing as per direction of the engineer-in-charge; for the following grades of concrete.Note: In case the cement content in design mix is more than the minimum specified cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement.. All works upto plinth level : Concrete of M10 grade with minimum cement content of 220 kg /cum |
| 18 | Providing and laying in position ready mixed or site batched design mix cement concrete for plain cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana/Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; but excluding the cost of centering, shuttering and finishing as per direction of the engineer-in-charge; for the following grades of concrete.Note: In case the cement content in design mix is more than the minimum specified cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement.Concrete of M25 grade with minimum cement content of 300 kg /cum |
| 19 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement.All works upto plinth levelConcrete of M50 grade with minimum cement content of 410 kg/cum |
| 20 | DSR 2023 correction factor is 0.973 as per OM 158/SE (TAS)/GST/2024/02-E dt.08/08/2024 |
| 21 | Add cost index @ 3.00% |
| 22 | Credit of Old dismantled paver block received from the dismantling. The material received shall be the property of contractor after dismantling duly weight/measured before remaining from the site in the presence of Engineer-in-Charge or his authorized representative all completion as per direction of Engineer-in-Charge. |
| 23 | Credit of Old kerb stone received from the dismantling. The material received shall be the property of contractor after dismantling duly weight/measured before remaining from the site in the presence of Engineer-in-Charge or his authorized reperesintive all completion as per direction of Engineer-in-Charge. |
| 24 | Credit of old dismantled MS steel/MS Angle/MS Flat/MS Bar etc. received after dismantling at site all complete as per direction of Engineer-in-Charge. |
| 25 | Deduct for the credit on account of cost of dismanltled unserviceable bricks received from dismantling , including dismantling removal & disposal from the site and cleaning the site all complete as per the direction of Engineer-in-charge complete. The dismantled unserviceable material shall become the property of contractors after dismantling duly weighed/measured before removing from the site in the presence of Engineer-in-charge or his authorised respective. |
| 26 | Providing & fixing Pre-fabricated precast solid open U-shaped RCC drain, drain cover, box culvert, crash barrier, retaining wall, silt chamber etc. using wet-cast technology with self-compacting concrete of grade M-50 and thermo-mechanically treated (TMT) steel bars of grade Fe-550D including straightening, cutting, bending, placing In position and binding, all complete upto plinth level with provisions of shear keys, connecting loops, necessary cutouts/holes lined with dowel tubes of required sizes for services with proper lifting arrangement of various thicknesses, shape and size using high quality steel moulds including loading, transportation from factory to site of work, unloading, stacking at site and placing in final position with the help of required capacity cranes all complete as per IS-11447:1985 and as per approved shop drawings and design mix complete as per the directions of Engineer-in-Charge. The RCC precast drain along with drain cover taken together as an integrated system, shall be capable of carrying a wheel load of 5 Ton of vehicular load. The precast elements shall be manufactured in a controlled factory environment with approved methodology/technology having all facilities including automated steam curing, automated reinforcement cage making facility, NABL accredited in-house laboratory with all testing facilities etc, complete as per the directions of Engineer-in-Charge. The installation of RCC precast drain, drain cover, box culvert etc. shall be done in correct and final position with proper line, level and plumb at site after making all arrangements of requisite T&P e.g., cranes, push-pull jacks etc. for lifting, placing and alignment of elements within erection tolerance as per IS-15916:2020, as per approved shop drawings, complete as per direction of Engineer-in-Charge including cost of all material and all tools & machinery required for casting for all works up to plinth level complete as per the directions of Engineer-in- Charge. Please Enable Macros to View BoQ information |