| 1 | Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000 m. [MORTH Ref. SI No. 3.06 - 301.] |
| 2 | Construction of Embankment with Material Deposited from Roadway Cutting Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Table 300-2.[MORTH Ref. SI No. 3.19 - 305.] |
| 3 | Granular Sub-base with Well Graded Material (Table 400.1) By Mix in Place Method :- Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. [MORD Ref. SI No. 4.1 - 401(A)] |
| 4 | Dry Lean Cement Concrete Sub- base :- Construction of dry lean cement concrete (DLC) Sub-base over a prepared sub-grade with coarse and fine aggregate conforming to IS : 383, the size of coarse aggregate not exceeding 25mm, aggregate cement ratio not to exceed 1 : 1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 Kg/Cum, optimum moisture content to be determined during trial length constructioin, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing. [MORTH Ref. SI No. 6.01 - 601.] |
| 5 | Thin White topping :- Construction of Thin White Topping/Cement Concrete Pavement with plain cement concrete pavement over existing surface with approve grade cement @ 400 kg per cum and as per IRC SP-76, coarse and fine aggregate conforming to IS 383, maximum size of fine aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction joint, joint filler, sealant primer, joint sealant, admixtures as approved, curing compound, finishing to lines etc.. and grades as per drawing. [MORTH Ref. SI No. 6.06 - Suggestive.] |
| 6 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade. Two or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture. DSR 13.62.1 |
| 7 | Providing and Laying of Interlocking Concrete Block Pavements having thickness 80 mm as per drawings and Technical Specification Clause 1504. [MORD Ref. SI No. 6.7 - 1500] |
| 8 | Brick masonry in 1:4 cement mortar in foundation complete excluding pointing and plastering as per drawing and technical specifications Clauses 600, 1202 & 1203. [MORD Ref. SI No. 11.5 - 600 & 1200] |
| 9 | Excavation in Cutting in Soil by manual means with lead upto 50 m Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3. [MORD Ref. SI No. 3.5- 302(i)] |
| 10 | Plain cement concrete 1:3:6 nominal mix in foundation Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203days [MORD Ref. SI No. 11.4 - 800 &1200] |
| 11 | Construction of precast RCC railing of M30 Grade, aggregate size not exceeding 12 mm, true to line and grade, tolerance of vertical RCC post not to exceed 1 in 500, centre to centre spacing between vertical post not to exceed 2000 mm, leaving adequate space between vertical post for expansion, complete as per approved drawings and technical specifications. [MORTH Ref. SI No. 14.06 - 2703, 1500, 1600 & 1700.] |
| 12 | Construction of Embankment with Material Obtained from Borrow Pits :- Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 [MORD Ref. SI No. 3.4 - 301.5](Carted Earth) |
| 13 | Water Bound Macadam Sub-base/base :- Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405.[MORD Ref. SI No. 4.7 - 405, 3(A)] |
| 14 | Cement Concrete Pavement :- Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days including Trimixing by floating method & adding hardener in required quantity and depth upto 5 cm complete as per directions of Engineer-In-charge to meet Tenchinal specifications. [MORD Ref. SI No. 6.40 - 1500.] |
| 15 | Construction of Earthen Shoulders :- Construction of earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. [MORD Ref. SI No. 3.14 - 303.1](Carted Earth) Please Enable Macros to View BoQ information |