|
| 1 | E/W in excavation in foundation trenches or drains (not exceeding 1.5 mts in width as well as 10 sqmts on plan) including dressing of sides & ramming of bottoms, lift up to 1.5mts & lead of 50 mts including getting out the excavated soil and disposal of surplus excavated soil as directed. No. of PIllars=294 Pillar :L=3+2.5 /2 =2.75 ; B=2.75+1.75 /2 =2.25 |
| 2 | Providing & laying dry stone solling including ramming, dressing etc complete in foundations and under floors,including carriage & head load Complete job. Pillar,Back filling. |
| 3 | Providing & laying in position cement concrete (1cement:4coarse sand:8 graded stone agg 40mm nominal size) mix of specificied grade excl cost of centering and shuttering. Crushed agg. All work upto plinth level. Pillar |
| 4 | Providing & laying cement concrete 1:3:6 mix using 1 cement : 3 coarse sand : 6 graded stone aggregate 20 nominal size of specificied grade excl cost of centering and shuttering. All works up to plinth Level. Pillar plug/coping |
| 5 | Reinforced cement concrete work in walls (any thickness ) including attached pilasters,buttresses,plinth and string courses,fillets,columns,pillars,piers,abutments,posts and struts upto floor five level , in 1:1 1/2:3 upto five level including curing but excluding the cost of centring, shuttering,finishing and reinforcement. Raft, Pillar |
| 6 | Centering and shuttering including strutting, propping etc and removal of form work for. Raft,Pillar. Complete job |
| 7 | Reinforcement for RCC work incl. Straightening , bending and placing in position and binding all complete ending and placing in position and binding all complete including all carriages, Complete job |
| 8 | 12 mm thick cement plaster in 1: 4 cement mortar. Pillar,Plug |
| 9 | Finishing walls with textured exterior paint of required shade on new work (two or more coats applied @3.28 litre/10sqm over and including base coat of water proofing cement paint @2.20 kg/10sqm .including making of Prescribed Departmental LOGO on all Boundary Pillars with writing of Geo-locations (Exterior finishing) |
| 10 | Carriage of material by Mechanical Transport from Source upto dumping site of work. (a) Sand av. Lead 85 Km |
| 11 | (b) Bajri av. Lead 85 Km |
| 12 | Carriage of material by Head load from dumping site upto site of work. (a) Sand av. Lead 3200mts |
| 13 | (b) Bajri av. Lead 3200mts |
| 14 | (c) Solling av. Lead 3200mts Please Enable Macros to View BoQ information |