| 1 | 1.NAME OF SUB WORK -- Work Portion |
| 2 | 1. NAME OF SUB WORK - Work portlon 78ITEM N0.:1 Scrapping the old plastered internalsurface with sand paper and coating the entire surfacewith mixture of whiting or glue and linseed oil includingscaffolding etc. complete as directed. |
| 3 | ITEM NO.:2 Removing old paint from steel and other 1(metal surfaces and making the surfaces even with handscrapping, scaffolding etc. complete |
| 4 | ITEM NO. :3 Providing and applying two coats of flat oil 1paint of approved colour to the old structural steel workand iron work previously painted in building includingscaffolding, if necessary, cleaning and preparing thesurface (excluding primer coat) etc.complete. |
| 5 | ITEM NO. :4 Providing and applying priming coat overnew/old steel and other metal surfaces includingpreparing the surface by thoroughly cleaning oil,grease, dirt and other foreign matter and scoured withwire brushes, fine steel wool, scrappers and sandpaper, scaffolding etc. complete |
| 6 | ITEM NO. :5 Scrapping the old plastered internalsurface with sand paper and coating the entire surfacewith mixture of whiting or glue and linseed oil includingscaffolding etc. complete as directed.First Floor.. |
| 7 | ITEM NO.:6 Scrapping the old plastered Internal 7surface with sand paper and coating the entire surfacewith mixture of whiting or glue and linseed oil includingscaffolding etc. complete as directed.Second Floor.. |
| 8 | ITEM NO.:7 Providing and applying Royale Luxury 5Emulsion of Asian / Berger / Nerolac / Dulex Paints orequivalent make on internal wall surface as detailedbelow Scrapping for surface with emery paper and wipeclean for area. Applying Asian / Berger / Nerolac / DulexPaints or equivalent wall primer with brush by addingmineral turpentine oil by 8 to 10 % or water by 15 to20% allowing to dry for 6 to 8 hoursAfter applying Asian/Berger / Nerolac / Dulex Paints or eguivalent acrylicwall putty with appropriate prpportion of water of allowto dry for period of 4 to 6 hours of activity. Scrappingwith emery paper and wipe clean Applying paintsRoyale Luxury emulsion 1st coat with brush watercontent water 40 to 45% or 65 to 70% by role Applyingpaints Royale luxury emulsion 2nd coat with brush withwater content 40 to 45 % or 65 to 70 % by roller. (Withprior approval of S.E.). |
| 9 | ITEM NO. :8 Providing and applying Royale LuxuryEmulsion of Asian / Berger/ Nerolac / Dulex Paints orequivalent make on internal wall surface as detailedbelow Scrapping for surface with emery paper and wipeclean for area. Applying Asian / Berger / Nerolac / DulexPaints or equivalent wall primer with brush by addingmineral turpentine oil by 8 to 10 % or water by 15 to20% allowing to dry for 6 to 8 hoursAfter applying Asian/ Berger / Nerolac / Dulex Paints or equivalent acrylicwall putty with appropriate prpportion of water of allowto dry for period of 4 to 6 hours of activity. Scrappingwith emery paper and wipe clean Applying paintsRoyale Luxury emulsion 1st coat with brush watercontent water 40 to 45% or 65 to 70% by role Applyingpaints Royale luxury emulsion 2nd coat with brush withwater content 40 to 45 % or 65 to 70 % by roller. (Withprior approval of S.E.)Second Floor |
| 10 | ITEM NO.:9 Providing and applying Royale Luxury Emulsion of Asian/ Berger / Nerolac / Dulex Paints orequivalent make on internal wall surface as detailedbelow Scrapping for surface with emery paper and wipeclean for area. Applying Asian / Berger / Nerolac / DulexPaints or equivalent wall primer with brush by addingmineral turpentine oil by 8 to 10 % or water by 15 to20% allowing to dry for 6 to 8 hoursAfter applying Asian/ Berger / Nerolac / Dulex Paints or equivalent acrylicwall putty with appropriate prpportion of water of allowto dry for period of 4 to 6 hours of activity. Scrappingwith emery paper and wipe clean Applying paintsRoyale Luxury enmulsion 1st coat with brush watercontent water 40 to 45% or 65 to 70% by role Applyingpaints Royale luxury emulsion 2nd coat with brush withwater content 40 to 45 % or 65 to 70 % by roller. (Withprior approval of S.E.)First Floor. |
| 11 | ITEM N0.: 10 Providing and applying priming coat onconcrete/ masonary/ Asbestos Cement plasteredsurfaces including scaffolding if necessary, preparingthe surface by thoroughly cleaning oil, grease, dirt andother foreign matter and sand papering as required etc.complete.Second Floor. |
| 12 | ITEM NO.:11 Providing and applying priming coat onconcrete/ masonary/ Asbestos Cement plasteredsurfaces including scaffolding if necessary, preparingthe surface by thoroughly cleaning oil, grease, dirt andother foreign matter and sand papering as required etc.complete.First Floor. |
| 13 | ITEM NO.:12 Providing and applying priming coat onconcretel masonary/ Asbestos Cement plasteredsurfaces including scaffolding if necessary, preparingthe surface by thoroughly cleaning oil, grease, dirt andother foreign matter and sand papering as required etc.complete. |
| 14 | ITEM NO.: 13 Providing and applying two coats of exterior white weather shield paint of approvedmanufacture and of approved colour to the plasteredsurfaces including cleaning ,preparing the plastersurface ,applying primer coat ,scaffolding if necessaryand watering the surface for two days etc complete.NOTE: For Item No. 15to 18 prior approval ofSuperintending Engineer will be necessarySecond Floor... |
| 15 | ITEM NO.: 14 Providing and applying two coats of 2exterior white weather shield paint of approvedmanufacture and of approved colour to the plasteredsurfaces including cleaning .preparing the plastersurface ,applying primer Coat ,scaffolding if necessaryand watering the surface for two days etc complete.NOTE: For Item No. 15 to 18 prior approval ofSuperintending Engineer will be necessaryFirst Floor.. |
| 16 | ITEM NO. : 15 Providing and applying two coats of 2exterior white weather shield paint of approvedmanufacture and of approved colour to the plasteredsurfaces including cleaning ,preparing the plastersurface ,applying primer coat scaffolding if necessaryand watering the surface for two days etc complete.NOTE: For Item No. 15 to 18 prior approval ofSuperintending Engineer will be necessary.. Please Enable Macros to View BoQ information |