| 1 | Earth work excavation and deposting on bank with an intial lead of 10m& initial liftm of 2m in hard siff clay , stiff black cotton , hard red earth shales , murram , gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil asper standard specification 20.B |
| 2 | Plain cement concrete of mix 1:4:8 using 40mm ISS metal from the apporoved quarry including cost and convence of the materials to site and all the labour charges etc, complete as per the standard specification |
| 3 | Providing steel centering for sides and soffits of cement concrete works including necessary arrangements with strutting for plain surfaces with out props, With all cost and conveyance of materials and lab our at site ect ., Coplete as per standard specfication. |
| 4 | Without Props |
| 5 | With Props |
| 6 | Plain cement concrete of mix 1:3:6 using 20mm ISS metal from the apporoved quarry including cost and convence of the materials to site and all the labour charges etc, complete as per the standard specification |
| 7 | Plastering with Cement Mortar 1:4 mix using 20mm thick with all cost and convleyance of materials and all labour change ect., complete as pre standard specification |
| 8 | Supplying , fabricating and placing in position of MS or RTS rods for cutting, bending, straightening of rods and tying the grills for reinforcementwith necessary binding wire including all cost and conveyance of materials to site with all labour cost ect.,complete as per standard specification. |
| 9 | Providing and laying in position Standardised Concrete Mix M-20 Grade in accordance with IS 456 - 2000 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement contenet of 325Kg/ cum and maximum water cement ratio of 0.55 including admixture (Plasticiser / super plasticiser) in recommended proportions as per IS 9103 to accelerate, related setting of concrete, improve workability without imparing strength and durability with about (5.0cum), 7730Kg of 20mm machine crushed stone jelly and with about (3.3 cum), 5156kg of 10 - 12mm machine crushed stone jelly and with about (4.79cum) 7670 kg of Crushed Stone Sand (M- Sand), but excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary without claiming extra cost etc., complete complying with standard specification and as directed by the departmental officers - |
| 10 | Supplying and fixing the MS Grill Gratings for Drainage all cost and labours etc., complete |
| 11 | Plain cement concrete of mix 1:2:4 using 20mm ISS size HBG metal from approved quarry including all the cost and conveyance of materials to site and all labour cahrges etc. complete as per standard specification. |
| 12 | Collection, supply and Filling of Well Gravel from the approved quarry and stacking the same at road sides to departmental gauge for taking pre.Measurement including cost and conveyance of well morambu to site including all labour charges for stacking etc, complete. asper std specifications |
| 13 | Supplying and laying Rubberised interlocking Paver block M40 grade Providing and laying of 83mm thick high strength type conforming IS 15658-2006 of rubberized interlocking paver lock in size of minimum compressive strength of 40N/mm2 in uniform shape of approved make to be laid in flurring bone pattern with stone dust cushion below the uniform shap of approved non skitting surface in the top and the rate including levelling the base preparation of pavers as sub base, stone dust cushion 150mm thick laying out of pavement cut the pieces to fix the edge vibring the pavers,sweeping tranporting loading unloading of laying paver block as per standard specification,. 25mm 3way Ball Valve Please Enable Macros to View BoQ information |