|
| 1 | Laying and Jointing PVC Pipe. Heading |
| 2 | Labour charges for removing grass, thorney shrubs, Jungli shrub, Kubabul and alike grass along roadside making the ground clean by showel and phavaras etc. complete. |
| 3 | Excavation for foundation in all types of soil including dressing and stacking |
| 4 | Backfilling with excavated earth including watering and compaction |
| 5 | Providing and laying PCC 1:4:8 for levelling course |
| 6 | Providing and laying RCC M20 including centering and shuttering |
| 7 | Providing and fixing TMT steel Fe-500 |
| 8 | Brick masonry in CM 1:4 |
| 9 | 12 mm cement plaster CM 1:4 |
| 10 | Panali for collecting rainwater till rain water pit:- Poviding, laying and fixing half round PVC pipe (panali) pipe of 110m dia with fittings such as bends, tees, reducers, clamps, etc. including necessary excavation, trench filling etc. complete including removing existing pipe line if necessary and conveying and stacking the same as directed etc. as required to cover complete building area as on actual. |
| 11 | Providing & supplying PVC pipe 160mm dia |
| 12 | Lowering, laying & jointing PVC pipeline in trench |
| 13 | Construction of silt trap chamber including CI grating |
| 14 | Providing & supplying PVC pipe 110mm dia (Class II) |
| 15 | Boring/drilling bore well of 300mm dia for casing/ strainer pipe, by suitable methodprescribedinIS:2800(part I), including collecting samples from different strata, preparing and submitting strata chart/ bore log, including hire & running charges of all equipments, tools, plants & machinery required for the job, all complete as per direction of Engineer in charge, upto 90m depth below ground level. |
| 16 | Providing erecting PVC casing pipe 6Kg/Cm2 for 150 mm diaborewell etc. complete. |
| 17 | Providing and erecting 150mm DTH borewell 8 kg PVC Casing loring, handeling and grouting. |
| 18 | Providing and erecting 150mm dia PVC boar cap |
| 19 | Gravel packing in Recharge Pit in accordance with IS:4097, including providing gravel: fine/ medium/coarse, in required grading & sizes as per the actual requirement, all complete as per direction of Engineer in charge |
| 20 | Testing and commissioning of complete RWH system |
| 21 | Surface restoration with paver blocks including base preparation |
| 22 | Providing ISI standard R.C.C. pipes in standard lengths of following class and diameter suitable for either collar joints or rubber ring joints, excluding GST lev-ied by GOI & GOM in all respect including inspection charges, transport to departmental stores, unloading and stacking etc. complete as per IS 458/1988. 300mm.dia. RCC Pipe |
| 23 | Lowering, laying and jointing in proper grade and alignment RCC pipes with collar joints in CM 1:1 proportion or socketed RCC pipes with rubber joints (excluding cost of rubber ring or RCC collar ) , including cost of conveyuance form stores to site of works, cost of jointing material, labour giving hydraulic testing, etc., complete |
| 24 | Refilling the trenches with available excavated stuff with soft material first over pipeline and then hard material in 15 cm layers with all leads and lifts including consolidation, surcharging, etc., complete. Deducting volue of pipe from Pit Size |
| 25 | Filling of recharge pit upto 04m depth with 25 27mm clean washed gravels from bottom up followed by 0.5m depth of 10-25 mm of clean washed stones followed by 0.5m of fine agggregate or any equivalent sand as available for media layer |
| 26 | Operation & Maintenance Please Enable Macros to View BoQ information |