| 1 | Excavation in trenches not exceeding 1.5mtr wide and not exceeding 1.5m deep for laying pipe line including getting out in soft / loose soil complete all as specified and directed by Engineer-in-Charge. |
| 2 | Returning filling in , including spreading , levelling,watering and well ramming in layers not exceeding 25cm thick , in any type of soil complete all as specified and directed by Engineer-in-Charge. |
| 3 | Removing excavated material (Soils) not exceeding 50.00 mtr and depositing where directed at a level not exceeding 1.5 mtr above the starting point complete all as specified and directed by Engineer-in-Charge. |
| 4 | Material & Labour for lagging to pipes (for the 20mm GI tubing ) used in external water supply of plumbing all around with 25mm thick bonded mineral wool pre-formed. SNAPON pipe section of density 144 Kg/Cum conforming to IS-9842 or equivalent and provided chicken wire mesh netting 25 gauge 20mm meshing and plaster of Peris 3mm to 5 mm thick all around the mesh after breaking old unservicable / broken lagging complete all as specified and directed by Engineer-in-Charge . |
| 5 | Material & Labour for lagging to pipes (for 25mm GI tubing ) used in external water supply of plumbing all around with 25mm thick bonded mineral wool pre-formed. SNAPON pipe section of density 144 Kg/Cum conforming to IS-9842 or equivalent and provided chicken wire mesh netting 25gauge 20mm meshing and plaster of Peris 3mm to 5 mm thick all around the mesh after breaking old old unservicable / broken lagging complete all as specified and directed by Engineer-in-Charge . |
| 6 | Material & Labour for lagging to pipes (for 15mm GI tubing) used in external water supply of plumbing all around with 25mm thick bonded mineral wool pre-formed. SNAPON pipe section of density 144 Kg/Cum conforming to IS-9842 or equivalent and provided chicken wire mesh netting 25gauge 20mm meshing and plaster of Peris 3mm to 5 mm thick all around the mesh after breaking old old unservicable/ broken lagging complete all as specified and directed by Engineer-in-Charge . |
| 7 | Taking up or down of size of 15 mm bore GI/steel tubing complete all as specified and directed by Engineer-in-Charge. Note: Excavation and earth work shall be measured and paid seperately under appropriate item of Schedule 'A' BoQ. |
| 8 | Taking up or down of size of 20 mm bore GI/steel tubing complete all as specified and directed by Engineer-in-Charge. Note: Excavation and earth work shall be measured and paid seperately under appropriate item of Schedule 'A' BoQ. |
| 9 | Taking up or down of size of 25/32 mm bore GI/steel tubing complete all as specified and directed by Engineer-in-Charge. Note: Excavation and earth work shall be measured and paid seperately under appropriate item of Schedule 'A' BoQ. |
| 10 | Taking up or down of size of 40/50 mm bore GI/steel tubing complete all as specified and directed by Engineer-in-Charge. Note: Excavation and earth work shall be measured and paid seperately under appropriate item of Schedule 'A' BoQ. |
| 11 | Refixing old servicable GI/steel tubing of size 15 mm bore and connection in new or old position after cleaning of surfaces complete all as specified and directed by Engineer-in-Charge. Notes :(a) Old servicable pipes for refixing shall be retrived from serial item no.7.00 of BoQ here-in-before. (b) The rate of cleaning of pipe surfaces is included in this item and nothing shall be paid extra on this ground. |
| 12 | Refixing old servicable GI/steel tubing of size 20 mm bore and connection in new or old position after cleaning of surfaces complete all as specified and directed by Engineer-in-Charge. Notes :(a) Old servicable pipes for refixing shall be retrived from serial item no.8.00 of BoQ here-in-before. (b) The rate of cleaning of pipe surfaces is included in this item and nothing shall be paid extra on this ground. |
| 13 | Refixing old servicable GI/steel tubing of size 25/32 mm bore and connection in new or old position after cleaning of surfaces complete all as specified and directed by Engineer-in-Charge. Notes :(a) Old servicable pipes for refixing shall be retrived from serial item no.9.00 of BoQ here-in-before. (b) The rate of cleaning of pipe surfaces is included in this item and nothing shall be paid extra on this ground. |
| 14 | Refixing old servicable GI/steel tubing of size 40/50 mm bore and connection in new or old position after cleaning of surfaces complete all as specified and directed by Engineer-in-Charge. Notes :(a) Old servicable pipes for refixing shall be retrived from serial item no.10.00 of BoQ here-in-before. (b) The rate of cleaning of pipe surfaces is included in this item and nothing shall be paid extra on this ground. |
| 15 | Material and labour for cutting, drilling and tapping cast iron/GI water mains (in postion) in size for branch connection of the internal dia 15mm including excavtion earth work re-filling, leakge testing & fixing assceesory etc. complete all as specified and directed by Engineer-in-Charge. |
| 16 | Material and labour for cutting, drilling and tapping cast iron/GI water mains (in postion) in size for branch connection of the internal dia 20mm including excavtion earth work re-filling, leakge testing & fixing assceesory etc complete all as specified and directed by Engineer-in-Charge. |
| 17 | Material and labour for cutting, drilling and tapping cast iron/GI water mains (in postion) in size for branch connection of the internal dia 40mm including excavtion earth work re-filling, leakge testing & fixing assceesory etc complete all as specified and directed by Engineer-in-Charge. |
| 18 | Supply and laying in replacement of old damaged/ rusted GI tubes medium grades of 100 mm dia complete with all new fittings (like; union, tee, bend, elbow, reducer, socket, flanged, 6mm gasket) to be fixed on wall and ceilings or laid in floors/trenches complete all as specified and directed by Engineer-in-Charge. Notes : (a) Welding for flanged is deemed to be included in this rate. (b) if the pipe is laid in trenches the rate of earth work is included in this item and nothing shall be paid extra on this account. |
| 19 | All as per item No. 18 here-in- before but of size of 80mm bore complete all as specified and directed by Engineer-in-Charge.Notes : (a) Welding for flanged is deemed to be included in this rate. (b) if the pipe is to be laid in trenches earth work shall be measured and paid seperately under appropriate item of Schedule 'A' BoQ. |
| 20 | All as per item No. 18 here-in- before but of size of 50mm bore complete all as specified and directed by Engineer-in-Charge.Notes : (a) Welding for flanged is deemed to be included in this rate. (b) if the pipe is to be laid in trenches earth work shall be measured and paid seperately under appropriate item of Schedule 'A' BoQ. |
| 21 | All as per item No. 18 here-in- before but of size of 40mm bore complete all as specified and directed by Engineer-in-Charge.Notes : (a) Welding for flanged is deemed to be included in this rate. (b) if the pipe is to be laid in trenches earth work shall be measured and paid seperately under appropriate item of Schedule 'A' BoQ. |
| 22 | All as per item No. 18 here-in- before but of size of 25mm bore complete all as specified and directed by Engineer-in-Charge.Notes : (a) Welding for flanged is deemed to be included in this rate. (b) if the pipe is to be laid in trenches earth work shall be measured and paid seperately under appropriate item of Schedule 'A' BoQ. |
| 23 | All as per item No. 18 here-in- before but of size of 20mm bore complete all as specified and directed by Engineer-in-Charge.Notes : (a) Welding for flanged is deemed to be included in this rate. (b) if the pipe is to be laid in trenches earth work shall be measured and paid seperately under appropriate item of Schedule 'A' BoQ. |
| 24 | All as per item No. 18 here-in- before but of size of 15mm bore complete all as specified and directed by Engineer-in-Charge.Notes : (a) Welding for flanged is deemed to be included in this rate. (b) if the pipe is to be laid in trenches earth work shall be measured and paid seperately under appropriate item of Schedule 'A' BoQ. |
| 25 | Material & Labour for replacement of Cast Iron fitting such as bends, tappers any type tee, caps reducer ,collar and plug upto 150 mm bore complete all as specified and directed by Engineer-in-Charge. |
| 26 | Supply & Fixing in replacement of old damged Cast Iron pipes of size 100 mm bore spigot and socket ends centrifugally cast. Class A in any length with gasket, laid in trenches complete all as specified and directed by Engineer-in-Charge.Note: Excavation and earth work shall be measured and paid seperately. |
| 27 | All as per item No. 26 here-in-before but of size of 80 mm bore complete all as specified and directed by Engineer-in-Charge.Note: Excavation and earth work shall be measured and paid seperately. |
| 28 | Supply & Fixing in replacement of old damaged / unserviceable Gun metal globe or gate valve non rising spindle heavy duty with iron wheel head, screwed both end for connection GI pipes of size of 80mm bore (ISI marked) complete all as specified and directed by Engineer-in-Charge. |
| 29 | All as per item No. 28 here-in- before but of size of 50mm bore (ISI marked) complete all as specified and directed by Engineer-in-Charge. |
| 30 | All as per item No. 28 here-in- before but of size of 40mm bore (ISI marked) complete all as specified and directed by Engineer-in-Charge. |
| 31 | All as per item No. 28 here-in- before but of size of 25mm bore (ISI marked) complete all as specified and directed by Engineer-in-Charge. |
| 32 | All as per item No. 28 here-in- before but of size of 20mm bore (ISI marked) complete all as specified and directed by Engineer-in-Charge. |
| 33 | All as per item No. 28 here-in- before but of size of 15mm bore (ISI marked) complete all as specified and directed by Engineer-in-Charge. |
| 34 | Supply and fixing in replacement of GI union of size of 15 mm bore (ISI marked) complete all as specified and directed by Engineer-in-Charge. |
| 35 | All as per item No. 34 here-in- before but of size of 20 mm bore (ISI marked complete all as specified and directed by Engineer-in-Charge. |
| 36 | All as per item No. 34 here-in- before but of size of 25 mm bore (ISI marked) complete all as specified and directed by Engineer-in-Charge. |
| 37 | All as per item No. 34 here-in- before but of size of 40 mm bore (ISI marked ) complete all as specified and directed by Engineer-in-Charge. |
| 38 | All as per item No. 34 here-in- before but of size of 50 mm bore (ISI marked ) complete all as specified and directed by Engineer-in-Charge. |
| 39 | Supply and fixing in replacement GI elbow of size of 15 mm bore (ISI marked ) complete all as specified and directed by Engineer-in-Charge. |
| 40 | All as per item No. 39 here-in-before but of size of 20 mm bore (ISI marked ) complete all as specified and directed by Engineer-in-Charge. |
| 41 | All as per item No. 39 here-in-before but of size of 25 mm bore (ISI marked ) complete all as specified and directed by Engineer-in-Charge. |
| 42 | All as per item No. 39 here-in-before but of size of 40mm bore (ISI marked ) complete all as specified and directed by Engineer-in-Charge. |
| 43 | All as per item No. 39 here-in-before but of size of 50 mm bore (ISI marked) complete all as specified and directed by Engineer-in-Charge. |
| 44 | Supply and fixing in replacement GI Tee of size of 15 mm bore (ISI marked) complete all as specified and directed by Engineer-in-Charge. |
| 45 | All as per item No. 44 here-in- before but of size of 20 mm bore (ISI marked) complete all as specified and directed by Engineer-in-Charge. |
| 46 | All as per item No. 44 here-in- before but of size of 25 mm bore (ISI marked) complete all as specified and directed by Engineer-in-Charge. |
| 47 | All as per item No. 44 here-in- before but of size of 40 mm bore (ISI marked) complete all as specified and directed by Engineer-in-Charge. |
| 48 | All as per item No. 44 here-in- before but of size of 50 mm bore (ISI marked ) complete all as specified and directed by Engineer-in-Charge. |
| 49 | Supply and fixing in replacement GI Socket of size of 15 mm bore (ISI marked ) complete all as specified and directed by Engineer-in-Charge. |
| 50 | All as per item No.49 here-in-before but of size of 20mm bore (ISI marked ) complete all as specified and directed by Engineer-in-Charge. |
| 51 | All as per item No.49 here-in-before but of size of 25 mm bore (ISI marked ) complete all as specified and directed by Engineer-in-Charge. |
| 52 | All as per item No.49 here-in-before but of size of 40 mm bore (ISI marked ) complete all as specified and directed by Engineer-in-Charge. |
| 53 | All as per item No.49 here-in-before but of size of 50 mm bore (ISI marked ) complete all as specified and directed by Engineer-in-Charge. |
| 54 | Supply and fixing in replacement of GI Nipple of size of 15 mm bore (ISI marked ) complete all as specified and directed by Engineer-in-Charge. |
| 55 | All as per item No. 54 here-in- before but of size of 20 mm bore (ISI marked ) complete all as specified and directed by Engineer-in-Charge. |
| 56 | All as per item No. 54 here-in- before but of size of 25 mm bore (ISI marked ) complete all as specified and directed by Engineer-in-Charge. |
| 57 | All as per item No. 54 here-in- before but of size of 40mm bore (ISI marked ) complete all as specified and directed by Engineer-in-Charge. |
| 58 | All as per item No. 54 here-in- before but of size of 50 mm bore (ISI marked ) complete all as specified and directed by Engineer-in-Charge. |
| 59 | Supply and fixing in replacement of GI Flanged with 6mm gasket of size of 40 mm bore complete all as specified and directed by Engineer-in-Charge. |
| 60 | All as per item No. 59 here-in- before but of size of 50 mm bore complete all as specified and directed by Engineer-in-Charge. |
| 61 | All as per item No. 59 here-in- before but of size of 80 mm bore complete all as specified and directed by Engineer-in-Charge. |
| 62 | All as per item No. 59 here-in- before but of size of 100mm bore complete all as specified and directed by Engineer-in-Charge. |
| 63 | Supply only Calcium based granular disinfectant for water treatment more stable than chlorine gas, and stronger than Bleaching powder and sodium Hypochlorite pack of 45 Kg plastic drum complete all as specified and directed by Engineer-in-Charge. Note: Drum packing shall be 45 kg for payment and measurement purpose. |
| 64 | Supply and fixing in replacement cast iron non return valve of 100 mm bore , PN 1.6, both ends flanged , ISI Marked, jointed and testing complete all as specified and directed by Engineer-in-Charge. |
| 65 | Supply and fixing in replacement cast iron non return valve of 80 mm bore , PN 1.6, both ends flanged , ISI Marked, jointed and testing complete all as specified and directed by Engineer-in-Charge. |
| 66 | Supply and fixing in replacement Sluice valve of 100 mm bore Cast lron body PN 1.6 (ISI marked) with brass spindle, iron wheel head type connecting and testing complete complete all as specified and directed by EIC. |
| 67 | Supply and fixing in replacement Sluice valve of 80 mm bore Cast lron body PN 1.6 (ISI marked) with brass spindle, iron wheel head type connecting and testing complete complete all as specified and directed by EIC. |
| 68 | Supply and fixing in replacement Sluice valve of 100 mm bore Cast lron body PN 1.0 (ISI marked) with brass spindle, iron wheel head type connecting and testing complete complete all as specified and directed by EIC. |
| 69 | Supply and fixing in replacement Sluice valve of 80 mm bore Cast lron body PN 1.0 (ISI marked) with brass spindle, iron wheel head type connecting and testing complete complete all as specified and directed by EIC. Please Enable Macros to View BoQ information |
| 70 | Supply and fixing in replacement Sluice valve of 80 mm bore Cast lron body PN 1.0 (ISI marked) with brass spindle, iron wheel head type connecting and testing complete complete all as specified and directed by EIC. Please Enable Macros to View BoQ information |