| 1 | 4.4 Construction of embankment with approved material obtained from borrow pit with all lifts and leads, transporting to site, spreading, grading to required slope and compacting by vibratory roller 8-10 tonne to meet requirement of table 300-2 including cost of compensation for earth taken from private land complete as per MoRT&H specification clause 305. (Lead taken upto 5 km) |
| 2 | Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level. 4.10.1 In all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etc.4.10.1.1 Depth upto 1.5 m |
| 3 | Providing and laying in position cement concrete of specified gradeexcluding the cost of centring and shuttering - All work upto plinthlevel :21.1.7 1:4:8 (1 Cement : 4 fine/ coarse sand : 8 graded stone aggregate 40 mm nominal size). |
| 4 | Random rubble masonry with hard stone in foundation and plinth :25.1.1 Cement mortar 1:6 (1 cement : 6 coarse sand) |
| 5 | Random rubble masonry with hard stone in superstructure above plinth level and upto two stories. In Cement mortar 1:6 (1 cement : 6 coarse sand |
| 6 | Extra for random rubble masonry with hard stone in :25.4.1 Square or rectangular pilla |
| 7 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level : 21.1.2 1:1½:3 (1 Cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size). |
| 8 | Cement plastering including T&P, scaffolding, material and completelabpour, including cost of water, curing, racking of joints etc. with 20mm cement plaster of mix : 32.3.3 1:6 (1 cement : 6 fine/ coarse sand) |
| 9 | Steel work welded in built up sections/ framed work including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. 29.26.2 In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works. |
| 10 | Painting with synthetic enamel paint of approved brand andmanufacture to give an even shade : 32.50.1 Two or more coats on new work |
| 11 | Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives of required shade 32.36.1New work (Two or more coats applied @ 1.43 ltr/ 10 sqm. over and including base coat of water proofing cement paint applied @ 2.20 kg/ 10 sqm). |
| 12 | .11 Providing and fixing of 60mm thick precast cement concrete interlocking paver block casted with rubber moulds in approved reflective colour and design having minimum compressive strength of 300 kg/ sq cm. The CC paving blocks be laid on average 50mm thick bed of coarse sand and the joint is to be filled with fine sand. Laying procedure on compacted sub-base as defined. Complete job is to be executed as per the instruction of Engineer in-charge. The rates to be inclusive of all lead & Lifts etc. complete as per specifications. |
| 13 | 10.1 Providing and fixing precast cement concrete M-20 grade (Using mechanical Concrete Mixer) kerb stone top and bottom width 115 and 165 mm respectively, 250 mm high on 150 mm thick PCC M-10 grade foundation as per design, including fixing at site as per clause 408 of MoRT&H Specification including all material, labour, machinery, lighting, guarding and maintenance of diversion. |
| 14 | 39.3 Supplying and stacking good earth at site of work. Note: 1) Loading, unloading and carriage to be paid extra as per actual lead. 2) Earth measured in stacks will be reduced by 20% foe payment |
| 15 | 39.11 Spreading of sludge farm yard manure or/ and good earth in required thickness (cost of sludge, farm- yard manure or/and good earth to be paid for separately). |
| 16 | 39.12 Grassing with 'Doobs' grass including watering and maintenance of the lawn for 30 days or more till the grass forms a thick lawn free from weeds and fit for moving including supplying good earth if needed. (The good earth shall be paid separately) 39.12.1 In rows 15 cm apart in either direction |
| 17 | 39.44 Supply and planting following species best quality container grown healthy trees of 2 mt. min. height, well established & free from disease at site in 0.90 m dia holes, 1 m deep dug in the ground, mixing the soil with decayed farm yard/sludge manure, backfilling the hole watering etc as required. |
| 18 | 39.44.4 Jacaranda mimosifolia (Neelli Gulmohar) |
| 19 | 39.44.1 Plumeria alba ( Champa) |
| 20 | 39.44.16 Table palm |
| 21 | Planting permanent hedges including digging of trenches, 60 cm wide and 45 cm deep, refilling the excavated earth mixed with farmyard manure, supplied at the rate of 4.65 cum per 100 metres and supplying and planting hedge plants at 30 cm apart. m 39.23 Maintenance of Hedge for one year |
| 22 | Providing and fixing G.I. pipes complete with G.I. fittings including trenching and refilling etc. External work : 34.12.4 32 mm dia. nominal bore metre Please Enable Macros to View BoQ information |