| 1 | Earth work in excavation for roadway, including trimming bottom and side slopes in accordance with requirement of line, grades and cross sections, including disposal of surplus material with all lift and lead upto 1000 metre as per MoRT&H specification clause 301. 4.2.1 In all type of soil |
| 2 | Carriage of Materials by mechanical transport including loading, unloading and stacking ::1.1.1 Earth 4 Km |
| 3 | 30.35 Random rubble dry stone Kharanja (soling) under floor. |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level :21.1.5 1:3:6 (1 Cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size). |
| 5 | 30.25 Kota stone slab flooring 25mm thick over 20 mm (average) thick base laid over and jointed with grey cement slurry mixed with pigment to match the shade of the slab including rubbing and polishing complete with base of cement mortar 1 : 4 (1 cement : 4 coarse sand) : 30.25.2 Area of each slab 2001 to 5000 sqcm |
| 6 | Providing and fixing Granite stone slab mirror polished and machine edge cut in walls, pillars, steps, Shelves, Sills Counters, Floors etc. laid on 12mm (Av.) thick base of cement mortar 1:3 (1 cement : 3 coarse sand) jointing with white cement mortar 1:2 (1white cement : 2 marble dust) with pigment to match the shade of the marble slab including grinding, rubbing and polishing complete.27.2.3.2 1501 Cm2 to 3600 Cm2 Tiles |
| 7 | Brick work with FPS bricks of class designation 75 in superstructure above plinth level upto two stories in all shapes and sizes in : 24.5.2 Cement mortar 1:6 (1 cement : 6 coarse sand) |
| 8 | Cement plastering including T&P, scaffolding, material and complete labour, including cost of water, curing, racking of joints etc. with 20 mm cement plaster of mix : including Providing /mixing of synthetic fibers compulsorily complying with IS 16481:2022 of 06 mm/12 mm length to be mixed @ 0.25% by weight of Cement i.e. 125 gms per 50 kg Cement up to 900 gms per cum of Concrete/ mortarm 1:6 (1 cement : 6 fine/ coarse sand) |
| 9 | Cement plastering including T&P, scaffolding, material and completelabpour, including cost of water, curing, racking of joints etc. with 20mm cement plaster of mix : 32.3.3 1:6 (1 cement : 6 fine/ coarse sand) plastering done on moulding cornices or architraves including neat finish to line and level: 32.13.1 In one coat |
| 10 | Steel work welded in built up sections/ framed work including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. 29.26.2 In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works. |
| 11 | Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives of required shade 32.36.1New work (Two or more coats applied @ 1.43 ltr/ 10 sqm. over and including base coat of water proofing cement paint applied @ 2.20 kg/ 10 sqm). |
| 12 | 32.50 Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : 32.50.1 Two or more coats on new work Please Enable Macros to View BoQ information |