|
| 1 | WORK NAME |
| 2 | Dismantling of cement concrete pavement for sewer line and manholes by mechanical means using pneumatic tools, cutting the peripheral edge by CC cutter, breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials up to a lead of 1000 metres including allowances for any additional dismantling beyond the drawings (measurement for payment to be as per standard drawings), re-handling of material/earth to complete the task. |
| 3 | Earth work for Sewer line and Manhole in excavation in foundation, trenches manholes, road side chambers etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level including allowances for any additional excavation beyond the drawings (measurement for payment to be as per standard drawings), re-handling of material/earth to complete the task. In all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etc. Depth upto 1.5 m |
| 4 | Carriage of Materials by mechanical transport including loading, unloading and stacking :: Sand, bazri, ballast, kankar |
| 5 | Providing granular bedding having width = outer dia of pipe (Bc) + 500mm, thickness below pipe = 0.25Bc or 100mm (whichever is higher) and haunching = 0.5Bc, with graded hard crusher broken stone of 100% passing through 20mm sieve, 20 to 50 % passing through 10mm sieve and 100 % retain on 6.3mm sieve, laying in layers of thickness 10/15cm including ramming, consolidation etc complete for all type of pipes of following sizes as per drawing and or as directed by Engineer. 150 mm internal diameter |
| 6 | Providing laying, spreading and compacting stone aggregates of specific sizes as per Table 400-7 to Water Bound Macadam specification including spreading in uniform thickness; hand packing, rolling with power roller 8-10 tonnes, in stages to proper grade and camber, applying and brooming requisite type of screening (Table 400-8) binding materials to fill up the interstices of coarse aggregates, watering (with water browser) and compacting to required density, making necessary earthen bund to protect edges as per clause 404 of MoRT&H specification including all material, labour, machinery, lighting, guarding and maintenance of diversion under sewer line and manhole work complete including allowances for any additional road restoration beyond the drawings (measurement for payment to be as per standard drawings) to complete the task. Crusher broken - Grade-III (53-22.4mm) |
| 7 | Providing and laying un-reinforced, plain cement concrete mix in pavement over a prepared sub base with 43 grade cement, coarse and fine aggregate conforming to IS: 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant, transported to site, laid spread, compacted and finished in a continuous operation including provision of contraction, expansion, admixtures as approved, curing compound, finishing to lines and grades complete as per drawing and as per clause 602, 112 of MoRT&H specification including all material, labour, machinery, lighting, guarding and maintenance of diversion for road restoration under sewer line and manhole work including allowances for any additional road restoration beyond the drawings (measurement for payment to be as per standard drawings) to complete the task. cement concrete 1:4:8 |
| 8 | Providing and laying in position cement concrete of specified grade over a prepared base course complete including finishing, curing all material, labour, machinery, lighting, guarding for road restoration under sewer line and manhole work using RMC (ready mix concrete plant) and Transit mixer including allowances for any additional road restoration beyond the drawings (measurement for payment to be as per standard drawings) to complete the task. including Providing /mixing of synthetic fibers compulsorily complying with IS 16481:2022 of 06 mm/12 mm length to be mixed @ 0.25% by weight of Cement i.e.125 gms per 50 kg Cement up to 900 gms per cum of Concrete/ mortar. PCC/ RCC Grade M -25 |
| 9 | Dismantling of flexible pavements for sewer line and manholes and disposal of dismantled materials up to a lead of 50 metres as directed by Engineer including allowances for any additional dismantling beyond the drawings (measurement for payment to be as per standard drawings), re-handling of material/earth to complete the task. Bituminous courses |
| 10 | Granular courses |
| 11 | Constructing providing and fixing of pre-cast RCC M-40 grade circular Road Side Inspection Chamber including earthwork with following dia and depth cylindrical piece with 100mm wall thickness, inbuilt 100mm thick base slab, inbuilt cover & frame on top, provision for 110mm OD in and out sewer connection with making proper inbuilt benching and channel with PCC M-15 grade including providing cast-in-situ 100mm thick base foundation of PCC M-10 grade, supplying and fixing circular precast SFRC Circular 300 / 450 mm dia manhole cover with frame MD-10 (as per IS-12592 amended upto date), including steel reinforcement minimum @ 80kg/cum, testing for water tightness complete in all respect as per drawing, specification and the direction of the Engineer. Pre-cast Road side inspection chamber of 300mm dia (internal), 450mm depth and 600mm dia base foundation |
| 12 | Pre-cast Road side inspection chamber of 450mm dia (internal), 600mm depth and 750mm dia base foundation |
| 13 | Pre-cast Road side inspection chamber of 450mm dia (internal), 900mm depth and 750mm dia base foundation |
| 14 | Providing and making connection to the manhole/ road side chamber/ property chamber by cutting hole in wall, making good the same with brick work/ stone masonry work in cement mortar 1:4, plaster in cement mortar 1:3, encasement of pipe at manhole with 75mm thick M15 grade concrete etc complete as directed by Engineer. |
| 15 | Construction of House Sewer Connection inside and outside of a dwelling properties to connect all the outlets of Kitchen, Bath, toilet/WC of the property to existing inspection chamber of Sewer Network, which includes Door-to-door survey of all properties to be connected with Sewer Network, Preparation of sketch / drawing of arrangement for each house with all the details and obtain approval from Engineer In-charge or his representative and Preparation of as built drawing (Layout plan) in AutoCAD for each property / dwelling connection with sewer network up to manhole. Including Dismantling of all type of flooring and roads, i.e. BT/CC/WMM/interlocking block etc with mechanical cutter. Including Required Excavation of pipe trench/chamber in all type of strata of specified width up to all depth, Providing, laying, jointing and aligning of PVC-U pipes (SN-8) as per 15328 (amended up to date) / HDPE DWC (double wall corrugated) pipes of SN-8 grade as per IS 16098 (amended up to date)/ SWR Pipes with required PVC/ DWC/SWR fittings with required level & location in buried position over bedding of 50 mm thick M-10 grade and in open position above ground/floor with an encasing of pipe 50 mm cover at 3 sides with M10 grade concrete, Providing, laying, jointing and aligning 160 mm dia PVC-U pipes (SN-8) as per IS15328 (Amended up to date) providing as sleeve to 110 mm dia PVC-U pipes / HDPE DWC (double wall corrugated) pipes (exposed to atmosphere) for crossing open drains, demolishing, If required and reconstruction of drain in original position with PCC M-10, Brick work with modular extruded burnt fly ash clay sewer bricks (Conforming to IS: 4885 - 1988) in CM 1:4, 12 mm thick plaster in CM 1:3 and Construction of 2 Nos brick masonry chamber of bricks class designation 75 of 115 mm wall thickness in cement mortar 1:4, clear inside dimension 320 x 320 x 550 mm, 50 mm thick base PCC 1:3:6, providing & fixing 350 x 350 mm RCC precast cover with frame of LD-2.5, earth filling in gaps, finishing with PCC 1:3:6 inside the chamber, Chamber-1 with square mouth S.W. gulley trap P-type of size 100 x 100 mm as per IS 651: 1992 (amended up to date) with CI grating, in slope around the mouth of Gulley Trap including provision for fixing of 2 nos. 110 mm dia PVC-U pipe etc. to connect a single inlet after connecting all the outlets of kitchen & bath & outlet of this chamber will connect to Chamber-2 or inspection chamber and the Chamber-2 with a provision for fixing of 2 nos. 110 mm dia PVC-U pipe etc. i.e. a single inlet after connecting all outlets of toilet & WC of premises to exiting Inspection chamber, Emptying of septic tank/soakage well etc.Length up to 5 m |
| 16 | Length more than 5 m and upto 10 m |
| 17 | Length more than 10 m and upto 15 m |
| 18 | Brick work with FPS bricks of class designation 75 in foundation and plinth in: Cement mortar 1:4 (1 cement : 4 coarse sand) |
| 19 | Random rubble masonry with hard stone in foundation and plinth : Cement mortar 1:4 (1 cement : 4 coarse sand) |
| 20 | Cement plastering including T&P, scaffolding, material and complete labour, including cost of water, curing, racking of joints etc. with 20 mm cement plaster of mix : including Providing /mixing of synthetic fibers compulsorily complying with IS 16481:2022 of 06 mm/12 mm length to be mixed @ 0.25% by weight of Cement i.e. 125 gms per 50 kg Cement up to 900 gms per cum of Concrete/ mortar 1:4 (1 cement : 4 fine/ coarse sand) |
| 21 | Cleaning of RCC / SW / DWC / HDPE pipes and intermediate manholes which includes removal of vegetation, garbage, muck, brick and stone pieces or any type of trash etc. and Flow Test of already laid but not commissioned (including cost and conveyance of water to site, Manpower and machineries deployed) complete by mechanical means in all respect as per direction of Engineer-In-Charge. 250 mm dia |
| 22 | Providing and Constructing of P- trap. brick masonry chamber of brick class designation 75 of 115 mm thickness in cement mortar 1:4 clear inside dimension300x300x400mm, 50mm thick base PCC 1:3:6 providing & fixing 350 x 350mm RCC precast cover with frame of MD-2.5 and 110x110 mm. P trap, sand filling in gaps finishing with PCC 1:3:6 inside the chamber in slope arround the mouth of P-trap. |
| 23 | Raising precast circular manhole cover and frame by taking out existing precast frame and cover, providing and fixing precast SFRC circular spacer of required height, re-fixing existing manhole cover frame and cover with cement sand mortar (1:3), including making good the damage, complete as directed by Engineer. Please Enable Macros to View BoQ information |