Tender For Supply Carriage And Laying Of 100 Micron Polythene Under Bed Lining Watercourse , Supply, Carriage And Fixing Of Reinforced Cement Concrete Panels Of Requisite Size As Per Approved Design Drawing And P.W.D. Specifications (36 X 36) , Sup, Hisar-Haryana
TDR : 54818689
Tender Notice
BOQ
4 Days Left
Hisar
Haryana
Tender For Supply Carriage And Laying Of 100 Micron Polythene Under Bed Lining Watercourse , Supply, Carriage And Fixing Of Reinforced Cement Concrete Panels Of Requisite Size As Per Approved Design Drawing And P.W.D. Specifications (36 X 36) , Sup
Supply carriage and laying of 100 micron polythene under bed lining watercourse
2
Supply, carriage and fixing of R.C.C panels of requisite size as per approved design drawing and P.W.D. Specifications (36` x 36`)
3
Supply, carriage and fixing of R.C.C lids Dia 30`
4
Brick work for arch / Culvert in cement mortar 1:3 (1cement : 3 coarse sand) with Extra for brick work inarch specially molded by common burnt clay nonmodular bricks of class designation 7.5 or cut-brickshave to be used: but for which no centering or supportsare required up to 4.5 meters internal diameter as perbased HSR item No.7.21.1 plus Item No.7.65 =4376.16 plus 147 = 4523.16/-
5
Civil Work
6
HSR Item 4.12.1-Earth work in excavation by mechanicalmeans (Hydraulic excavator)/manual means over areas(exceeding 30 cm in depth, 1.5 m in width as well as 10 sqmon plan) including getting out and disposal of excavated earthlead up to 50 m and lift up to 1.5 m, as directed by Engineerin-charge. 1. All kinds of soilHSR Rate(Rs.) 78.00 Through Rate
7
HSR Item 4.33-Excavating, supplying and filling of local earth(including royalty) by mechanical transport up to a lead of 1km also including ramming and watering of the earth in layersnot exceeding 20 cm in trenches, plinth, sides of foundationetc. complete.HSR Rate(Rs.) 73.00 Through Rate
8
[14.1]Dressing bed and preparation of sub grade for lining by mechanical/ mannual means HSR Rate (Rs.) 4.00 Labour Rate
9
HSR Item 6.1.6-Providing and laying in position cementconcrete of specified grade excluding the cost of centeringand shuttering - All work below plinth level and up to Floor IVlevel: 6. 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 gradedstone aggregate 40 mm nominal size)HSR Rate(Rs.) 2442.00 Through Rate
10
HSR Item 7.21.1-Brick work with common burnt clay nonmodular bricks of class designation 10.5 in foundation andplinth in: 1. Cement mortar 1:4 (1 cement : 4 coarse sand) HSR Rate(Rs.) 3693.00 Through Rate
11
[11.8.1]12 mm cement plaster of mix : 1. 1:4 (1 cement: 4 coarse sand) HSR Rate (Rs.) 82.00 Through Rate Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.