Water Resources and Irrigation Government Departments Closing in 0 days TDR #54818637

Tender For Providing And Fixing Of C.I. Nakkas Comp In All Respect As Per Current Market Rates (Alfa Wall) As Per Pwd Specifications Completed In All Respect To The Satisfaction To The Engineer In Charge @ Rs. Per Nos. 600Mm Dia , Supply Carriage And

Issued by Government Departments · Payal, Haryana
Tender Value
8.63 Lakhs
Estimated cost
Bid Submission
20 Apr 2026
0 days left
EMD
17260
Bank guarantee accepted
Document Fee
1000
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Payal → Haryana
EMD Exemption
Available
Quantity
Not Available

Project Description

Tender for Providing And Fixing Of C.I. Nakkas Comp In All Respect As Per Current Market Rates (Alfa Wall) As Per Pwd Specifications Completed In All Respect To The Satisfaction To The Engineer In Charge @ Rs. Per Nos. 600Mm Dia , Supply Carriage And Laying Of 100 Micron Polythene Under Bed Lining Watercourse , Supply, Carriage And Fixing Of Reinforced Cement Concrete Panels Of Requisite Size As Per Approved Design Drawing And P.W.D. Specifications (24 X 24) , Supply, Carriage And Fixing Of Reinforced Cement Concrete Lids Dia 18 , Civil Work , Hsr Item 4.12.1-Earth Work In Excavation By Mechanical Means (Hydraulic Excavator)/Manual Means Over Areas (Exceeding 30 Cm In Depth, 1.5 M In Width As Well As 10 Sqm On Plan) Including Getting Out And Disposal Of Excavated Earth Lead Up To 50 M And Lift Up To 1.5 M, As Directed By Engineerin-Charge. 1. All Kinds Of Soil Hsr Rate(Rs.) 78.00 Through Rate , Hsr Item 4.33-Excavating, Supplying And Filling Of Local Earth (Including Royalty) By Mechanical Transport Up To A Lead Of 1 Km Also Including Ramming And Watering Of The Earth In Layers Not Exceeding 20 Cm In Trenches, Plinth, Sides Of Foundation Etc. Complete. Hsr Rate(Rs.) 138.00 Through Rate , Hsr Item 6.1.6-Providing And Laying In Position Cement Concrete Of Specified Grade Excluding The Cost Of Centering And Shuttering - All Work Below Plinth Level And Up To Floor Iv Level: 6. 1:4:8 (1 Cement : 4 Coarse Sand (Zone-Iii) : 8 Graded Stone Aggregate 40 Mm Nominal Size) Hsr Rate(Rs.) 2442.00 Through Rate , [14.1]Dressing Bed And Preparation Of Sub Grade For Lining By Mechanical/ Mannual Means Hsr Rate (Rs.) 4.00 Labour Rate , [11.8.1]12 Mm Cement Plaster Of Mix : 1. 1:4 (1 Cement: 4 Coarse Sand) Hsr Rate (Rs.) 114.00 Through Rate , Hsr Item 7.21.1-Brick Work With Common Burnt Clay Nonmodular Bricks Of Class Designation 10.5 In Foundation And Plinth In: 1. Cement Mortar 1:4 (1 Cement : 4 Coarse Sand) Hsr Rate(Rs.) 4128.00 Through Rate , [11.4.2]10 Mm Thick Cement Plaster 2. 1:3 (1 Cement: 3 Fine Sand) Hsr Rate (Rs.) 114.00 Through Rate , [4.16.1.3]Excavating Trenches Of Required Width For Pipes, Cables, Etc Including Excavation For Sockets, And Dressing Of Sides, Ramming Of Bottoms, Depth Up To 1.5 M, Including Getting Out The Excavated Soil, And Then Returning The Soil As Required, In Layers Not Exceeding 20 Cm In Depth, Including Consolidating Each Deposited Layer By Ramming, Watering, Etc. And Disposing Of Surplus Excavated Soil As Directed, Within A Lead Of 50 M : 1.3. Pipes, Cables Etc. Exceeding 300 Mm Dia But Not Exceeding 600 Mm Hsr Rate (Rs.) 131.00 Through Rate , [4.17]Extra For Excavating Trenches For Pipes, Cables Etc. In All Kinds Of Soil For Depth Exceeding 1.5 M, But Not Exceeding 3 M. (Rate Is Over Corresponding Basic Item For Depth Up To 1.5 Metre). Hsr Rate (Rs.) 3.00 Through Rate , Hsr Item 20.62.8-Providing, Lowering, Laying, Cutting (Cut Surface To Be Uniformly Finished), Jointing With Rubber Rings Marked With Is : 5382 And Testing Of Spigot And Socketted Rcc, Np2 Marked With Is : 458-1988 And Specials Into Trenches For All Depths Including Carriage, Loading, Unloading, Stacking, Handling, Re-Handling Etc. Complete Is All Respects To The Satisfaction To The Engineer - In -Charge. 8. 600 Mm I/D Hsr Rate(Rs.) 1119.00 Through Rate , [21.28]Providing And Fixing Steel Bar Embedded Plastic Steps Of Size 263Mm X 165Mm Of Orange Colour, Confirming To Specification In Pump Chambers, Manholes Etc., Having Minimum 3Mm Thick Polypropylene Polymer Confirming To Is:10910 Encapsulated On 12Mm Dia Ribbed Steel Bars Per Is :1786. The Rate Include Cost Of Setting The Same To Correct Lines And Levels Duly Embedded In 1:2:4 Cement Concrete Including Carriage, Loading, Uploading, Stacking, Handling, Re-Handling Etc., Complete In All Respect To The Satisfaction Of Engineer-In-Charge Hsr Rate (Rs.) 298.00 Through Rate , [6.1.2]Providing And Laying In Position Cement Concrete Of Specified Grade Excluding The Cost Of Centering And Shuttering - All Work Below Plinth Level And Up To Floor Iv Level: 2. 1:2:4 (1 Cement : 2 Coarse Sand (Zone-Iii) : 4 Graded Stone Aggregate 20 Mm Nominal Size) Hsr Rate (Rs.) 3476.00 Through Rate , [7.65]Extra For Specially Moulded Brick Work In Circular Work Such As Wells, Shafts, Circular Sumps, Pumps Chambers, Etc. In Which Specially Moulded Or Cut-Bricks Have To Be Used: But For Which No Centring Or Supports Are Required Up To 4.5 Metres Internal Diameter. Hsr Rate (Rs.) 131.00 Through Rate

Corrigendum

Sr No Corrigendum Date Corrigendum Type New Submission Date
1 06-Apr-2026 Corrigendum 1 Date 08-Apr-2026
2 03-Apr-2026 Corrigendum Date 06-Apr-2026
3 03-Apr-2026 Corrigendum Date 06-Apr-2026
4 08-Apr-2026 Corrigendum 2 Date 13-Apr-2026
5 06-Apr-2026 Corrigendum 1 Date 08-Apr-2026
6 03-Apr-2026 Corrigendum Date 06-Apr-2026
7 13-Apr-2026 Corrigendum 3 Date 15-Apr-2026
8 08-Apr-2026 Corrigendum 2 Date 13-Apr-2026
9 06-Apr-2026 Corrigendum 1 Date 08-Apr-2026
10 03-Apr-2026 Corrigendum Date 06-Apr-2026
11 15-Apr-2026 Corrigendum 4 Date 20-Apr-2026
12 13-Apr-2026 Corrigendum 3 Date 15-Apr-2026
13 08-Apr-2026 Corrigendum 2 Date 13-Apr-2026
14 06-Apr-2026 Corrigendum 1 Date 08-Apr-2026
15 03-Apr-2026 Corrigendum Date 06-Apr-2026

BOQ

Name of Work:-
Sl. No. Item Description
1Providing and fixing of C.I. Nakkas comp in all respect as per current market rates (Alfa wall) as per PWD specifications completed in all respect to the satisfaction to the Engineer in charge @ Rs. per nos. 600mm dia
2Supply carriage and laying of 100 micron polythene under bed lining watercourse
3Supply, carriage and fixing of R.C.C panels of requisite size as per approved design drawing and P.W.D. Specifications (24` x 24`)
4Supply, carriage and fixing of R.C.C lids Dia 18`
5Civil Work
6HSR Item 4.12.1-Earth work in excavation by mechanicalmeans (Hydraulic excavator)/manual means over areas(exceeding 30 cm in depth, 1.5 m in width as well as 10 sqmon plan) including getting out and disposal of excavated earthlead up to 50 m and lift up to 1.5 m, as directed by Engineerin-charge. 1. All kinds of soilHSR Rate(Rs.) 78.00 Through Rate
7HSR Item 4.33-Excavating, supplying and filling of local earth(including royalty) by mechanical transport up to a lead of 1km also including ramming and watering of the earth in layersnot exceeding 20 cm in trenches, plinth, sides of foundationetc. complete.HSR Rate(Rs.) 138.00 Through Rate
8HSR Item 6.1.6-Providing and laying in position cementconcrete of specified grade excluding the cost of centeringand shuttering - All work below plinth level and up to Floor IVlevel: 6. 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 gradedstone aggregate 40 mm nominal size)HSR Rate(Rs.) 2442.00 Through Rate
9[14.1]Dressing bed and preparation of sub grade for lining by mechanical/ mannual means HSR Rate (Rs.) 4.00 Labour Rate
10[11.8.1]12 mm cement plaster of mix : 1. 1:4 (1 cement: 4 coarse sand) HSR Rate (Rs.) 114.00 Through Rate
11HSR Item 7.21.1-Brick work with common burnt clay nonmodular bricks of class designation 10.5 in foundation andplinth in: 1. Cement mortar 1:4 (1 cement : 4 coarse sand) HSR Rate(Rs.) 4128.00 Through Rate
12[11.4.2]10 mm thick cement plaster 2. 1:3 (1 cement: 3 fine sand) HSR Rate (Rs.) 114.00 Through Rate
13[4.16.1.3]Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m : 1.3. Pipes, cables etc. exceeding 300 mm dia but not exceeding 600 mm HSR Rate (Rs.) 131.00 Through Rate
14[4.17]Extra for excavating trenches for pipes, cables etc. in all kinds of soil for depth exceeding 1.5 m, but not exceeding 3 m. (Rate is over corresponding basic item for depth up to 1.5 metre). HSR Rate (Rs.) 3.00 Through Rate
15HSR Item 20.62.8-Providing, lowering, laying, cutting (cutsurface to be uniformly finished), jointing with rubber ringsmarked with IS : 5382 and testing of SPIGOT ANDSOCKETTED RCC, NP2 MARKED WITH IS : 458-1988 andspecials into trenches for all depths including carriage,loading, unloading, stacking, handling, re-handling etc.complete is all respects to the satisfaction to the Engineer - in-charge. 8. 600 mm i/dHSR Rate(Rs.) 1119.00 Through Rate
16[21.28]Providing and fixing steel bar embedded plastic steps of size 263mm x 165mm of orange colour, confirming to specification in pump chambers, manholes etc., having minimum 3mm thick polypropylene polymer confirming to is:10910 encapsulated on 12mm dia ribbed steel bars per IS :1786. The rate include cost of setting the same to correct lines and levels duly embedded in 1:2:4 cement concrete including carriage, loading, uploading, stacking, handling, re-handling etc., complete in all respect to the satisfaction of Engineer-in-charge HSR Rate (Rs.) 298.00 Through Rate
17[6.1.2]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 2. 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) HSR Rate (Rs.) 3476.00 Through Rate
18[7.65]Extra for specially moulded brick work in circular work such as wells, shafts, circular sumps, pumps chambers, etc. in which specially moulded or cut-bricks have to be used: but for which no centring or supports are required up to 4.5 metres internal diameter. HSR Rate (Rs.) 131.00 Through Rate Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 54818637
AUTHORITY Government Departments
TENDER VALUE 8.63 Lakhs
LAST DATE 20-04-2026
Authority
Authority Name Command Area Development Authority
Work Description Tender for Providing And Fixing Of C.I. Nakkas Comp In All Respect As Per Current Market Rates (Alfa Wall) As Per Pwd Specifications Completed In All Respect To The Satisfaction To The Engineer In Charge @ Rs. Per Nos. 600Mm Dia , Supply Carriage And Laying Of 100 Micron Polythene Under Bed Lining Watercourse , Supply, Carriage And Fixing Of Reinforced Cement Concrete Panels Of Requisite Size As Per Approved Design Drawing And P.W.D. Specifications (24 X 24) , Supply, Carriage And Fixing Of Reinforced Cement Concrete Lids Dia 18 , Civil Work , Hsr Item 4.12.1-Earth Work In Excavation By Mechanical Means (Hydraulic Excavator)/Manual Means Over Areas (Exceeding 30 Cm In Depth, 1.5 M In Width As Well As 10 Sqm On Plan) Including Getting Out And Disposal Of Excavated Earth Lead Up To 50 M And Lift Up To 1.5 M, As Directed By Engineerin-Charge. 1. All Kinds Of Soil Hsr Rate(Rs.) 78.00 Through Rate , Hsr Item 4.33-Excavating, Supplying And Filling Of Local Earth (Including Royalty) By Mechanical Transport Up To A Lead Of 1 Km Also Including Ramming And Watering Of The Earth In Layers Not Exceeding 20 Cm In Trenches, Plinth, Sides Of Foundation Etc. Complete. Hsr Rate(Rs.) 138.00 Through Rate , Hsr Item 6.1.6-Providing And Laying In Position Cement Concrete Of Specified Grade Excluding The Cost Of Centering And Shuttering - All Work Below Plinth Level And Up To Floor Iv Level: 6. 1:4:8 (1 Cement : 4 Coarse Sand (Zone-Iii) : 8 Graded Stone Aggregate 40 Mm Nominal Size) Hsr Rate(Rs.) 2442.00 Through Rate , [14.1]Dressing Bed And Preparation Of Sub Grade For Lining By Mechanical/ Mannual Means Hsr Rate (Rs.) 4.00 Labour Rate , [11.8.1]12 Mm Cement Plaster Of Mix : 1. 1:4 (1 Cement: 4 Coarse Sand) Hsr Rate (Rs.) 114.00 Through Rate , Hsr Item 7.21.1-Brick Work With Common Burnt Clay Nonmodular Bricks Of Class Designation 10.5 In Foundation And Plinth In: 1. Cement Mortar 1:4 (1 Cement : 4 Coarse Sand) Hsr Rate(Rs.) 4128.00 Through Rate , [11.4.2]10 Mm Thick Cement Plaster 2. 1:3 (1 Cement: 3 Fine Sand) Hsr Rate (Rs.) 114.00 Through Rate , [4.16.1.3]Excavating Trenches Of Required Width For Pipes, Cables, Etc Including Excavation For Sockets, And Dressing Of Sides, Ramming Of Bottoms, Depth Up To 1.5 M, Including Getting Out The Excavated Soil, And Then Returning The Soil As Required, In Layers Not Exceeding 20 Cm In Depth, Including Consolidating Each Deposited Layer By Ramming, Watering, Etc. And Disposing Of Surplus Excavated Soil As Directed, Within A Lead Of 50 M : 1.3. Pipes, Cables Etc. Exceeding 300 Mm Dia But Not Exceeding 600 Mm Hsr Rate (Rs.) 131.00 Through Rate , [4.17]Extra For Excavating Trenches For Pipes, Cables Etc. In All Kinds Of Soil For Depth Exceeding 1.5 M, But Not Exceeding 3 M. (Rate Is Over Corresponding Basic Item For Depth Up To 1.5 Metre). Hsr Rate (Rs.) 3.00 Through Rate , Hsr Item 20.62.8-Providing, Lowering, Laying, Cutting (Cut Surface To Be Uniformly Finished), Jointing With Rubber Rings Marked With Is : 5382 And Testing Of Spigot And Socketted Rcc, Np2 Marked With Is : 458-1988 And Specials Into Trenches For All Depths Including Carriage, Loading, Unloading, Stacking, Handling, Re-Handling Etc. Complete Is All Respects To The Satisfaction To The Engineer - In -Charge. 8. 600 Mm I/D Hsr Rate(Rs.) 1119.00 Through Rate , [21.28]Providing And Fixing Steel Bar Embedded Plastic Steps Of Size 263Mm X 165Mm Of Orange Colour, Confirming To Specification In Pump Chambers, Manholes Etc., Having Minimum 3Mm Thick Polypropylene Polymer Confirming To Is:10910 Encapsulated On 12Mm Dia Ribbed Steel Bars Per Is :1786. The Rate Include Cost Of Setting The Same To Correct Lines And Levels Duly Embedded In 1:2:4 Cement Concrete Including Carriage, Loading, Uploading, Stacking, Handling, Re-Handling Etc., Complete In All Respect To The Satisfaction Of Engineer-In-Charge Hsr Rate (Rs.) 298.00 Through Rate , [6.1.2]Providing And Laying In Position Cement Concrete Of Specified Grade Excluding The Cost Of Centering And Shuttering - All Work Below Plinth Level And Up To Floor Iv Level: 2. 1:2:4 (1 Cement : 2 Coarse Sand (Zone-Iii) : 4 Graded Stone Aggregate 20 Mm Nominal Size) Hsr Rate (Rs.) 3476.00 Through Rate , [7.65]Extra For Specially Moulded Brick Work In Circular Work Such As Wells, Shafts, Circular Sumps, Pumps Chambers, Etc. In Which Specially Moulded Or Cut-Bricks Have To Be Used: But For Which No Centring Or Supports Are Required Up To 4.5 Metres Internal Diameter. Hsr Rate (Rs.) 131.00 Through Rate
Basic Detail
Tender No 20257D4154E6 BB62 4D79 9D3A BFF52BC878F1442CAD
Bidding Type Tender
Location
City Payal
State Haryana
Key Dates
Publish Date 15 Apr 2026
Submission Date 20 Apr 2026
Open Date 20 Apr 2026
Finance
Tender Value 8.63 Lakhs
Tender Fee 1000
EMD 17260
Exemption Available
Document List
5ad64283-bd2c-4dd3-a17b-797e2041f196.html
BOQ_589197.xls
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Apr 15, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Apr 08, 2026
18:00 IST

Corrigendum-1 Issued

Clarifications on tender conditions and amendments issued.

Completed
Apr 06, 2026
18:00 IST

Corrigendum-2 Issued

Clarifications on tender conditions and amendments issued.

Completed
Apr 06, 2026
18:00 IST

Corrigendum-3 Issued

Clarifications on tender conditions and amendments issued.

Completed
Apr 13, 2026
18:00 IST

Corrigendum-4 Issued

Clarifications on tender conditions and amendments issued.

Completed
Apr 08, 2026
18:00 IST

Corrigendum-5 Issued

Clarifications on tender conditions and amendments issued.

Completed
Apr 06, 2026
18:00 IST

Corrigendum-6 Issued

Clarifications on tender conditions and amendments issued.

Completed
Apr 15, 2026
18:00 IST

Corrigendum-7 Issued

Clarifications on tender conditions and amendments issued.

Completed
Apr 13, 2026
18:00 IST

Corrigendum-8 Issued

Clarifications on tender conditions and amendments issued.

Completed
Apr 08, 2026
18:00 IST

Corrigendum-9 Issued

Clarifications on tender conditions and amendments issued.

Completed
Apr 06, 2026
18:00 IST

Corrigendum-10 Issued

Clarifications on tender conditions and amendments issued.

Completed
Apr 20, 2026
18:00 IST

Corrigendum-11 Issued

Clarifications on tender conditions and amendments issued.

Completed
Apr 15, 2026
18:00 IST

Corrigendum-12 Issued

Clarifications on tender conditions and amendments issued.

Completed
Apr 13, 2026
18:00 IST

Corrigendum-13 Issued

Clarifications on tender conditions and amendments issued.

Completed
Apr 08, 2026
18:00 IST

Corrigendum-14 Issued

Clarifications on tender conditions and amendments issued.

Completed
Apr 06, 2026
18:00 IST

Corrigendum-15 Issued

Clarifications on tender conditions and amendments issued.

Completed
Apr 20, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Apr 20, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

5ad64283-bd2c-4dd3-a17b-797e2041f196.html

xls

BOQ_589197.xls

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders