Name of Work:- Supply , Installation , Testing and Commissioning of UPS system at CHC Rajgangpur for the year 2025.26
Sl. No.
Item Description
1
Supply , Installation , Testing and Commissioning of UPS system at CHC Rajgangpur for the year 2025.26
2
Supply ,installation ,testing & commissioning of 20 KVA Parallel UPS SYSTEM WITH IGBT based inverter system, true online double conversion system, inbuilt isolation transformer & automatic phase sicuency corrector of 3ph in put to 3 ph output,415V, with built in BMS with battery back up up to 30 minutes with MS Rack for battery Housing, DC cable 7 Mtr with SFU and links for installation (Battery required: 12V, 65AH, 32 No.s) protection for fault by OL,UV,EF,GF,OC,Ph. (Make:Numeric / APC/ VERTIV) LOAD OF OT,ICU) as per direction of Engg.-in-Charge. Warrentee period of all accessories & component & system must be 2 years & compelete test certificate must be submitted along with ups including component list & SLD.
3
Supply ,installation ,testing & commissioning of 10KVA Parallel UPS SYSTEM WITH IGBT based inverter system, true online double conversion system, inbuilt isolation transformer & automatic phase sequence corrector of 3ph in put to 1 ph output,240V, with built in BMS with battery back up up to 30 minutes with MS Rack for battery Housing, DC cable 7 Mtr with SFU and links for installation (Battery required: 12V, 42AH, 20 No.s) protection for fault by OL,UV,EF,GF,OC,Ph. (Make:Numeric/ APC/ Vertiv)as per direction of Engg.-in-Charge. Warrentee period of all accessories & component & system must be 2 years & compelete test certificate must be submitted along with ups including component list & SLD. Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.