|
| 1 | Rectification and Upgradation of Fire Fighting Installation including Pumps, Hydrant Network , Sprinkler system and Fire Alarm System at GMCH , Sundargarh. |
| 2 | Overhauling of Electric Main Fire Pump (bearing, seal, impeller alignment) |
| 3 | Overhauling of Diesel Fire Pump Engine (injectors, filters, belts, hoses) |
| 4 | Replacement of Jockey Pump Motor / Bearing |
| 5 | Repair / Replacement of Fire Pump Control Panel (MCCB, contactor, relays, timers) |
| 6 | Replacement of Diesel Pump Batteries (2×12V) |
| 7 | Replacement of Landing Valves (63mm/75mm) |
| 8 | Replacement of Fire Hose Pipes (15m length) |
| 9 | Replacement of Branch Pipes & Nozzles |
| 10 | Repair of Hydrant Pipe Leakage (cutting, welding, refitting) |
| 11 | Replacement of External Hydrant Valves |
| 12 | Repair of Underground MS/DI Pipeline (excavation, jointing, reinstatement) |
| 13 | Repair of Hydrant Chambers, Covers & Brick Work |
| 14 | Replacement of Damaged Sprinkler Heads |
| 15 | Replacement of Zone Control Valves |
| 16 | Repair of Sprinkler Branch Pipeline (GI/MS) |
| 17 | Replacement of Smoke Detectors |
| 18 | Replacement of Heat Detectors |
| 19 | Replacement of Manual Call Points (MCPs) |
| 20 | Repair of Fire Alarm Control Panel Cards & Power Supply |
| 21 | Replacement of Inlet / Outlet Sluice Valves |
| 22 | Repair of Fire Tank Overflow & Drain Line |
| 23 | Post-repair Pressure Testing of Hydrant & Sprinkler |
| 24 | Final Testing, Commissioning & Compliance Report Please Enable Macros to View BoQ information |