| 1 | Construction of embankment with material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2. as per Technical Specification Clause 301.5 & MORD SR N0-3.4 (Including labour cess but GST will be paid extra as applicable) (Cartage Earth) For embankment & Diversion |
| 2 | GSB-Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader/Tractor mounted appropriate equipment on prepaire suface mixing by mix in place method with rotavator at OMC, and compacting with smooth roller to achieve the desired density, complete as per clause 401 & MORD SR N0-4.1 (Including labour cess but GST will be paid extra as applicable) |
| 3 | WBM Grading-2Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 2. As per MORD Specification & Clause No. 405, 4.7(2)(A) By Manual Means, complete in all respect as per directions of Engineer in charge. (Including Labour Cess & Roylty but GST will be paid extra as applicable) |
| 4 | WBM Grading-3Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3. As per MORD Specification & Clause No. 405(A), 4.7(3)(A) By Manual Means, complete in all respect as per directions of Engineer in charge. (Including Labour Cess & Roylty but GST will be paid extra as applicable) |
| 5 | Brick edging on both sides of the road of first class bricks 8cm. (3\\") wide and 12cm. (4.5\\") deep laid with mud mortar including labour & supply of bricks finished to the required template and in proper alignment and also including dressing ramming the excavated earth. As per PWD Specification & S.I.No. 765. complete in all respect as per directions of Engineer in charge. (Including Labour Cess but GST will be paid extra as applicable) |
| 6 | Prime CoatProviding and applying primer coat with Emulsion Hincole SS-1 Bulk on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means. As per MORD Specification & Clause No. 502, 5.1(i) complete in all respect as per directions of Engineer in charge. (Including Labour Cess & Emulsion but GST will be paid extra as applicable) |
| 7 | Tack Coat- Providing and applying tack coat with bitumen VG- 10 grade using pressure distributor at the rate of 0.35 kg per sqm on the prepared bituminous/ granular surface cleaned with mechanical broom. As per T.S.C. 503 & MORD SR N0-5.2(IV). (Including labour cess & Bitumne but GST will be paid extra as applicable) |
| 8 | Premix Carpet- Providing, laying and rolling of open - graded premix surfacing of 20 mm thickness composed of 13.2 mm and 11.2 mm aggregates (Dala quarry) either using VG-10 grade bitumen to required line grade and level to serve as wearing coarse on a previously prepared base by manual means including mixing in a sutabule mixol laying and rolling with a smooth wheeled roller 8-10 tonne capacity, finished to required level and grades. as per T.S.C. 508. & MORD SR N0-5.9 (Including labour cess & Bitumne but GST will be paid extra as applicable) |
| 9 | Seal Coat type C- Providing and laying seal coat by manual means with VG- 10 grade Bitumen sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per T.S.C. 510 & MORD SR N0-5.12 (Including labour cess & Bitumne but GST will be paid extra as applicable) |
| 10 | Providing and laying RCC Hume Pipe NP-3 Including collars/spigot and socket type joint confirming to BIS specification as per IS 458:2003 for 600 mm Dia Hume pipe. (Including labour cess but GST will be paid extra as applicable) For Diversion. |
| 11 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. As per MoRTH Specification Clause No. 304 Sr. No. 12.01 A (i) As per MoRT&H Specification & Clause No. 304, 12.01 A (i) complete in all respect as per directions of Engineer in charge. (Including labour cess but GST will be paid extra as applicable) (Box Culvert) |
| 12 | PCC 1:3:6 in Foundation Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. (Using batching plant) As per MoRT&H Specification & Clause No. 2100, 12.04 Sub Anaalsis Concret 21.02, (Using Batching Plant) complete in all respect as per directions of Engineer in charge. (Including labour cess but GST will be paid extra as applicable) (Box Culvert) |
| 13 | Reinforced Cement Concrete in Foundation of M30 Grade using batching palant transit mixer and concrete pump including cost of grit, Sand from Dala Quarry all material etc reqd. for proper completion of the work, and also including all type of taxes but excluding cess. RCC Grade M 30 using batching plant transit mixer & Concrete pump, complete as per Drawing and Technical Specification. As per MoRT&H Specification & Clause No. 1500, 1700, 2100, 12.08 G Case (II) Sub Anaalsis 21.09, (Using Batching Plant) complete in all respect as per directions of Engineer in charge. (Including labour cess but GST will be paid extra as applicable) (For Foundation, Box Culvert) |
| 14 | (M30) Furnishing and Placing Reinforced cement concrete in wall and slab as per drawing and Technical Specification As per MoRT&H Specification & Clause No. 1500, 1600, 1700, 14.01 C Case (II) Sub Anaalsis 21.09, (Using Batching Plant) complete in all respect as per directions of Engineer in charge. (Including labour cess but GST will be paid extra as applicable) (For Wall & Slab, Box Culvert) |
| 15 | Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications. 1600 & MoRTH SR N0-12.42 (Including labour cess but GST will be paid extra as applicable) |
| 16 | Reinforced Cement Concrete in wearing coat of M35 Grade using batching palant transit mixer and concrete pump including cost of grit, Sand from Dala Quarry all material etc reqd. for proper completion of the work, and also including all type of taxes but excluding cess. RCC Grade M 35 using batching plant transit mixer & Concrete pump, complete as per Drawing and Technical Specification. As per MoRT&H Specification & Clause No. 1500, 1600, 1700, 14.01 D Case (II) Sub Anaalsis 21.09, (Using Batching Plant) complete in all respect as per directions of Engineer in charge. (Including labour cess but GST will be paid extra as applicable) (Box Culvert) |
| 17 | Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications. As per SI 13.08 & MoRTH SR N0-2706 & 2200 (Including labour cess but GST will be paid extra as applicable) |
| 18 | Providing and laying boulders apron on river bed fdor protection against scour with stone boulders weighing not less than 40 Kg each complete as per drawing and technical specification. As per MoRT&H Specification & Clause No. 2503, 16.01 complete in all respect as per directions of Engineer in charge. (Including labour cess but GST will be paid extra as applicable) (Bridge) |
| 19 | Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification. As per MoRT&H Specification & Clause No.2504, 16.05 complete in all respect as per directions of Engineer in charge. (Including labour cess but GST will be paid extra as applicable) (Box Culvert) |
| 20 | Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications. As per MoRT&H Specification & Clause No. 2503, 16.04 complete in all respect as per directions of Engineer in charge. (Including labour cess but GST will be paid extra as applicable) (Protection) |
| 21 | Laying brick soling on prepared sub-grade with brick on end edging according to lines, graded and cross section shown on the grawing filling joints with sand and earth, spreading 25 mm thick layer of earth over brick soling, watering and rolling the same with three wheeled road roller 80-100 kn as per clause 412 of MORD-4.18 (Including labour cess but GST will be paid extra as applicable) Please Enable Macros to View BoQ information |