| 1 | Surface dressing of the ground including removing vegetation and in equalities not exceeding 15cm deep and disposal of rubbish, lead upto 50m and lift upto 1.5m (All kind of soil) DSR-18/2.28.1 |
| 2 | Cleaning jungle including up rooting of rank, vegetations grass, push, wood trees and samplings of grith upto 30 cms.measured at a height of 1 M. above ground level and removal of rubbish up to a distance of 50M. out side the removal of rubbish upto area cleared. SOR/259(i) Same as above but grass only SOR-20/259(a)/4.06 |
| 3 | Tractor with trolley including POL and driver SOR-20/SI.NO.19/Chapter-2 |
| 4 | Supply of labour SOR-20/SI.NO.12/Chapter-2 |
| 5 | Excavation in foundation in ordinary soil (loam,clay or sand) icluding lift up to 1.50 m. and lead up to 30m. and including filling watering and ramming of excavated earth into the trenches or into the space of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the engineer-in-charge upto a distance of 30m. from the foundation trenches ( where machine con not rech/move).SOR-251a |
| 6 | Extra rates for quantities of works, executed: In or under water and/or liquid mud, including pumping out water as required. (DSR-2018/2.24.1/A.R.) |
| 7 | CARTAGE OF Earth of fly ash when added to schedule item no. 253 |
| 8 | 1st Km. (If lead is beyond 1/2 km.) (SOR-261b) |
| 9 | M-150 Brick Work 1:6 one cement & four Coarse sand of 2.20 F.M. mortar in foundation and plinth including supply of all materials, labour and T&P etc. requried for proper completion of the work. SOR-2020, item-305(a) |
| 10 | 12 mm cement plaster of mix |
| 11 | 1:6 (1 cement: 6 coarse sand) DSR-18/13.4.2 |
| 12 | Providing and fixing SFRC Cover over chamber. (without frame) 50mm thick. |
| 13 | Size: 600x600mm (Heavy duty) |
| 14 | Providing and fixing SFRC Cover over chamber. (with frame) 50mm thick. |
| 15 | Size: 600x600mm (Heavy duty) |
| 16 | Providing and laying at or near ground level factory made kerb stone of M-25 grade cement in position to the required line, level and curvature jointed with cement mortar 1:3 (1 cement : 3 coarse sand), including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5mm), including making drainage opening wherever required complete etc. as per direction of Engineer-in-charge (length of finished kerb edging shall be measured for payment). (Precast C.C. kerb stone shall be approved by Engineer-in-charge). (DSR-18/16.69) |
| 17 | Laying at or near ground level old kerb stones of all types in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement : 3 coarse sand), including making joints with or without grooves (thickness of joints, except at sharp curve, shall not be more than 5 mm), including making drainage opening wherever required etc. complete as per direction of Engineer-in-charge. (Length of finished kerb edging shall be measured for payment). (Old kerb stones shall be supplied by the department free of cost). (DSR-2018/16.85/AR) |
| 18 | White washing with lime to give an even shade:Old work (one or more coats) |
| 19 | Painting with aluminium paint of approved brand and manufacture to give an even shade: One or more coats on old work. (DSR-2018/13.100.1/AR) |
| 20 | Painting or varnishing with valsper or other approved high grade enamel or super par synthetic clean varnish complete one coat over previously painted surface including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. Paint to be used should confirm ISI no. 105/106/133-1950.As in item (647) above but for every subsequent coat on previously treated surface SOR-20/647+648 |
| 21 | Fencing with R.C.C. post placed at required distance, embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall b sttutted on both sides and end post one side only, provided with horizontal lines and two diagonals of barbed wire 9.38 kg per 100 metres (mm) between the two posts fitted and fixed with G.l. staples on wooden plugs or G.l. binding wire tied to 6 mm bar nibs fixed while casting the post (cost of R.C.C. posts, struts, earth work and concrete to be paid for separately) :- Payment to be made per metre cost of total length of barbed wire used. |
| 22 | With G.l. barbed wire DSR-18/16.17.1 |
| 23 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: |
| 24 | 1:1.5:3 (1 Cement: 1.5 coarse sand: 3 graded stone aggregate 20 mm nominal size). DSR-18/4.1.2 |
| 25 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. |
| 26 | Thermo-Mechanically Treated bars of grade Fe-500D or more. (Sail Steel) (DSR-2018/5.22.6/AR) |
| 27 | Tractor with water tanker with cost water including POL SOR-20/SI.NO.27/Chapter 2 |
| 28 | Providing JCB with driver and including POL (AR/GNIDA) (SOR-20/S/NO. 31/Chapter 2) |
| 29 | Supplying at site: R.C.C. Standards post/ struts/rails/ pales of mix 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 12.5 mm nominal size) with wooden plugs or 6mm bar nibs wherever required as per direction of Engineer-incharge (cost of earth works in excavation, concrete works in foundation to be paid separately). (DSR-2018/16.15.1/AR) |
| 30 | Labour Cess and GST will be paid extra as per govt.orders Please Enable Macros to View BoQ information |