| 1 | Dismantling of Old damaged brick on edge soling as per Non Schedule Item No.-13 |
| 2 | Earth Work in embankment in ordinary soil excavation to be done from of regular pits 20 cm. layers including ramming and dressing pulverization surface to required levels and slope directed by Engineer-In-Charge |
| 3 | Relaying brick soling with old bricks laid on the edge and dry including preparation of subgrade to prescribed camber and including filling joints with local earth spreding a binding coat 1 cm. depth of local earth over entire surface including labour and T & P etc. required for proper completion of the work |
| 4 | Excavation of foundation in ordinary soil loam, clay and sand including lift upto 1.50 m. and lead 30.0 m. including filling, watering and ramming of excavated earth into space between building and side of foundation trenches etc. all complete |
| 5 | Providing and Laying cement concrete in 1:6:12 with cement, coarse sand and 40 mm brick ballast including supply of all the materials, labour and T & P etc. all complete |
| 6 | M-150 class brick work in 1:4 with cement and coarse sand mortar in foundation and plinth including supply of all the materials, labour and T & P etc. all complete |
| 7 | 15 mm thick plastering in 1:4 with cement and coarse sand mortar including supply of all materials, labour and T & P etc. all complete |
| 8 | Providing and Laying of plain cement concrete in 1:2:4 with cement, coarse sand and 20 mm stone grit including supply of all the materials, labour and T & P etc. all complete |
| 9 | Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement and thickness as per design over a prepared sub base with 43 grade cement or anyother type as per clause 1501.2.2 M 30 (Grade), coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and also appropriate weigh batcher using approved mix design laid in approved fixed side form work (steel channel, laying and fiximg of 125 micron thick polythene film, wedges, steel plates including levelling the form work as per drawing), spreading concrete with shovels, rakes, comacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge or culvert and construction joints, admixtures as approved, curing of concrete using curing compound ()wherever required) and water finishing to lines and grade as per drawing and Technical Specification |
| 10 | R.C.C. Work in grade M 25 with cement, coarse sand and 20 mm stone grit including supply of all the materials, labour and T & P etc. all complete |
| 11 | Mild Steel or Iron Work in the reinforcement including cutting, bending and binding etc. all complete |
| 12 | Provision of Inorgation Stone including fixing, writing and painting etc. all complete |
| 13 | Add 18% GST Please Enable Macros to View BoQ information |