| 1 | REPAIR TO BED HARD MAP (FD/E6/Map/08) |
| 2 | Removing old unserviceable long rail and S&F new long rails of Bed Hard size 1974mm x 65mm x 25mm rectungular MS pipe 18 Gauge using gas welding and standard workmanship complete all as directed. |
| 3 | Removing old unserviceable Short rail and S&F new Short rails of Bed Hard size 900mm x 65mm x 25mm rectungular MS pipe 18 Gauge using gas welding and standard workmanship complete all as directed. |
| 4 | Removing old unserviceable stiffner and S&F new stiffner of Bed Hard size 850mm x 25mm x 25mm square MS pipe 18 Gauge using gas welding and standard workmanship complete all as directed. |
| 5 | Removing old unserviceable leg of Header frame S&F new leg size 600mm x 38mm x 38mm square MS pipe 18 Gauge using gas welding and standard workmanship complete all as directed. |
| 6 | Removing old unserviceable stiffner of Header frame S&F new stiffner size 824mm x 38mm x 38mm square MS pipe 18 Gauge using gas welding and standard workmanship complete all as directed. |
| 7 | Removing old unserviceable center stiffner of Header frame S&F new centre stiffner size 824mm x 65mm x 25mm rectungular MS pipe 18 Gauge using gas welding and standard workmanship complete all as directed. |
| 8 | Removing old unserviceable vertical frame for PLB of Header frame S&F new vertical frame size 162mm x 18mm x 18mm square MS pipe 18 Gauge using gas welding and standard workmanship complete all as directed. |
| 9 | Removing old unserviceable horizontal frame for PLB of Header frame S&F new horizontal frame size 714mm x 18mm x 18mm square MS pipe 18 Gauge using gas welding and standard workmanship complete all as directed. |
| 10 | Removing old unserviceable prelaminated board from header frame S&F new board size 750mm x 350mm x 18mm thick prelaminated particale board exterior gde. |
| 11 | Removing old unserviceable leg of Footer frame S&F new leg size 462mm x 38mm x 38mm square MS pipe 18 Gauge using gas welding and standard workmanship complete all as directed. |
| 12 | Removing old unserviceable stiffner of footer frame S&F new stiffner size 900mm x 38mm x 38mm square MS pipe 18 Gauge using gas welding and standard workmanship complete all as directed. |
| 13 | Removing old unserviceable vertical frame for PLB of Header frame S&F new vertical frame size 314mm x 18mm x 18mm square MS pipe 18 Gauge using gas welding and standard workmanship complete all as directed. |
| 14 | Removing old unserviceable horizontal frame for PLB of Header frame S&F new horizontal frame size 824mm x 18mm x 18mm square MS pipe 18 Gauge using gas welding and standard workmanship complete all as directed. |
| 15 | Removing old unserviceable prelaminated board from footer frame S&F new board size 750mm x 350mm x 18mm thick prelaminated particale board exterior gde. |
| 16 | Removing old unserviceable plywood S&F new plywood 12mm thick commercial BWR (7 nos of ply) size 1974mm x 824mm fixed with nut and bolt (10 Nos). All as shown on drgs. Make:- Centure / Kitply/Green |
| 17 | REPAIR TO CHARPOY WITH HARD TOP MAP (FD/Map-II/01) |
| 18 | Supply and fixing in replacement the new portion of legs of Charpoy with Hard Top Map ( FD/Map-II/01) with 16 gauge thick mild steel square conduit 32 mm x 32 mm and 440 mm long with gas welding complete all as specified and directed. |
| 19 | Supply and fixing in replacement the new portion of long rail of Charpoy with Hard Top Map ( FD/Map-II/01) with 16 gauge thick mild steel conduit 65 mm x 25 mm and 1916 mm long with gas welding complete all as specified and directed. |
| 20 | Supply and fixing in replacement the new portion of short rail of Charpoy with Hard Top Map ( FD/Map-II/01) with 16 gauge thick mild steel conduit 65 mm x 25 mm and 836 mm long with gas welding complete all as specified and directed. |
| 21 | Supply and fixing in replacement the new stiffner of Charpoy with Hard Top Map ( FD/Map-II/01) with 16 gauge thick mild steel square conduit 25 mm x 25 mm and 836 mm long with gas welding complete all as specified and directed. |
| 22 | Supply and fixing in replacement the new center stiffner of Charpoy with Hard Top Map ( FD/Map-II/01) with 16 gauge thick mild steel square conduit 25 mm x 25 mm and 836 mm long with gas welding complete all as specified and directed. |
| 23 | Supply and fixing in replacement the new clips of Charpoy with Hard Top Map ( FD/Map-II/01) with mild steel flat 25 mm x 6 mm and 60 mm long with gas welding to the frame complete all as specified and directed. |
| 24 | Supply and fixing in replacement the new ply wood of Charpoy with Hard Top Map ( FD/Map-II/01) with 12 mm thick commercial BWR (07 No of ply) size 1916 mm x 836 mm fixed with 10 No nuts, bolts and washers complete all as shown on drawing, specified and directed. Make:- Centure / Kitply/Green Ply |
| 25 | Charpoy GI Pipe Ply Top FD-220 &221 |
| 26 | Material and labour for removing of old unserviceable Ply Woood Top and Supply and fixing in replacement the new ply wood of Charpoy GI Pipe (FD-220 ) with 12 mm thick commercial BWR (07 No of ply) size 1980 mm x 905 mm on charpoy frame as top fixed with 10 Nos nuts, bolts and washers (3 Nos on each long rail & 2 Nos on each short rail) bolt head counter sunk machine made size 75 mm x 5 mm with 2 Nos nuts & washers on each bolt complete all as shown on drawing, specified and directed. Make of Plywood :- Centure / Kitply / Greenply |
| 27 | Material and labour for removing of old unserviceable mild steel flat iron 25 mm x 4 mm of Charpoy GI Pipe (FD-220 ) and supply & fixing new in replacement with bolt head counter sunk machine made size 75 mm x 5 mm with 2 Nos nuts & washers on each bolt from long rail to long rail and applying two coats of synthetic enameled black paint over a coat of red oxide primer to the newly fixed flat iron complete all as specified and directed. |
| 28 | Supply and fixing in replacement the new long rail of Charpoy GI Pipe (FD-220) with 32 mm bore GI pipe medium grade ISI marked duly threaded both sides and fixing in the charpoy complete all as shown on drawing, specified and directed. |
| 29 | Cutting the removed long rail from Srl item No. 3.03 here-in-before and making the same to short rail of the charpoy and threading the both ends and fixing the same in the Charpoy GI Pipe (FD-220) complete all as shown on drawing, specified and directed. |
| 30 | Removing old existing unserviceable short rail from Charpoy GI Pipe (FD-220) and cutting the same and making it to the legs of the charpoy 480 mm long and threading the one end and fixing the same in the Charpoy and providing mild steel flat iron 25 mm x 3 mm clamps made to shape and gas welding to the legs including 3 mm thick mild steel plate making it to the round shape of size 3 mm x 50 mm and gas welding to the bottom of the legs of charpoys as shoe to the charpoy including removing old unserviceable legs with clamp and plate complete all as shown on drawing, specified and directed. |
| 31 | Supply and fixing in replacement the new check nuts of Charpoy GI Pipe (FD-220) for 32 mm bore GI pipe medium grade check nuts 6 mm wall thickness and fixing in the charpoy complete all as shown on drawing, specified and directed. |
| 32 | Supply and fixing in replacement the new elbow of Charpoy GI Pipe (FD-220) for 32 mm bore GI pipe medium grade elbow 3 way weighing not less than 415 gms each ISI marked and fixing in the charpoy complete all as shown on drawing, specified and directed. |
| 33 | M & L for replacement of old existing unserviceable wooden members of BED PLY WOOD TOP and supply and replacement of broken parts of wooden furniture by 1st class Hard wood members well seasoned free from knots duly finished to match with existing finish, fabricated as per shape & size fixed with suitable size bamboo pins and fevicol including tightening of other joints as directed by Engineer -in-charge and shown in drawing. |
| 34 | (A) Long rail |
| 35 | (B) short legs from bed |
| 36 | (C ) stiffener |
| 37 | (F) 12mm BWR thick ply wood top (Make:- Kit , Centure, Green) |
| 38 | M & L for replacement of old existing unserviceable wooden members of BED HARD MAP and supply and replacement of broken parts of wooden furniture by 1st class Hard wood members well seasoned free from knots duly finished to match with existing finish, fabricated as per shape & size fixed with suitable size bamboo pins and fevicol including tightening of other joints as directed by Engineer -in-charge and shown in drawing. |
| 39 | (A) Long rail |
| 40 | (B) short legs from bed |
| 41 | (C ) stiffener |
| 42 | (D) Foot board as per drawing |
| 43 | (E) Head board as per drawing including 50 mm FOAM with 32 density & leather cover |
| 44 | (F) 12 mm BWR thick ply wood top (Make:- Kit , Centure, Green) |
| 45 | Charpoy Folding IP with Hard Top FD/388(R) |
| 46 | Material and labour for removing of old unserviceable Ply Woood Top and Supply and fixing in replacement the new ply wood of Charpoy GI Pipe (FD-388(R) ) with 12 mm thick commercial BWR size 1980 mm x 900 mm on charpoy frame as top fixed by ply cut in two part of same size as per drg with 12 Nos nuts, bolts and washers (4 Nos on each long rail & 2 Nos on each short rail) bolt head counter sunk machine made size 75 mm x 5 mm with 2 Nos nuts & washers on each bolt complete all as shown on drawing, specified and directed. Make of Plywood :- Centure / Kitply / Greenply |
| 47 | Material and labour for Ges welding of long/short rails, legs of Charpoy Folding frame MS conduit of size 25 Sqmm and 16 gauge by continuous Welding in repairs n. exc 2.5cm and exc 2.5cm but n exc 5cm in length around with the joint where ever required complete all as specified. Please Enable Macros to View BoQ information |