| 1 | Excavation in foundations, trenches etc., in earth work. lift upto 1.5 metres stacking the excavated soil not more than 3 metres clear from the edge of the excavation and then returning the stacked soil in 15cm. layers, when required into plinths sides of foundations etc. consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth as directed within a lead of 20 metres.in pick work. |
| 2 | Dressing the ground including cutting and filling upto 15 cm. |
| 3 | Excavation In earthwork and filling in 15 cm layers in foundation and plinth including ramming, watering and consolidating upto a lead of 20 mtrs and lift upto a 1.50 mtrs. |
| 4 | Providing and laying cement concrete 1: 6 :12 ( 1 cement :6 sand :12 graded stone aggregate 40 mm nominal size) and curing complete excluding the cost of form work in foundation and plinth in all leads and lifts and as per the direction of the Engineer-in-Chaarge. |
| 5 | Ist class brick work using common burnt clay building bricks in foundation and plinth in cement mortor 1:4 ( 1 cement:4 sand ) in all leads and lifts as per the direction of the Engineer-in-Charge. |
| 6 | Providing and laying cement concrete work 1:2:4 (1 cement: 2 sand: 4 graded stone aggregate 20 mm nominal size) and curing complete excluding cost of form work in Foundation and Plinth |
| 7 | Providing and laying cement concrete work 1:1.5:3 (1 cement: 1.5 sand: 3 graded stone aggregate 20 mm nominal size) and curing complete excluding cost of form work in Foundation and Plinth |
| 8 | Foundations, footings bases of columns |
| 9 | Columns, pillars posts and struts |
| 10 | Lintels, beams girders bressumers |
| 11 | Providing mild steel/tor steel reinforcement for R.C.C. work including bending, binding and placing in position complete upto floor two level in all leads and lifts as per the direction of the Enginner-in-Charge. |
| 12 | Providing form work with steel plates 3.15 mm thick welded with angle iron in frame 30x30x5 mm.so as to give a fair finish including centering, shuttering, strutting and propping etc with wooden batens and ballies,height of propping and centring below supporting floor to celing not exceeding 4 mtrs and removal of the same for insitu- reinforced concrete & plain concrete work in: |
| 13 | Foundation,footing,bases of columns |
| 14 | Columns, pillars posts and struts. |
| 15 | Sides and soffits of beams |
| 16 | Providing and laying cement concrete 1:4:8 (1 cement: 4 sand :8 graded stone aggregate 40 mm nominal size) & curing complete excluding the cost of form work in foundation and plinth in all leads and lifts and as per the direction of the Engineer-in-Charge.(for FRP Tank Foundation) |
| 17 | Painting two coats (excluding priming coat) on new steel and other metal surfaces with enamel paint to give an even shade including cleaning the surface of dirt ,dust and other foreign matter with enamel with enamel paint other than white complete in all respect as per the direction of the Engineer-in-Charge. |
| 18 | 15 mm cement plaster in single coat on rough side of brick masonry for interior plastering upto floor two level including arrises, internal rounded angle, chamfers and or rounded angles not exceeding 80 mm in girth and finished even and smooth with cement mortor 1:4 ( 1 cement :4 sand ) in all leads and lifts as per the direction of the Enginner-in-Charge. |
| 19 | Providing and laying 20mm. thick acid proof tiles of size upto 300 x 300mm. of specified shade in floors, treads of steps and landing laid on a bed of 12mm. thick acid proof mortor 1:3 (1 cement:3 sand) jointing with cement slurry mixed with pigment to match the shade of tiles in all leads and lifts as per the direction of the Enginner-in-Charge. |
| 20 | Steel work welded built up sections, trusses and framed work , including cutting , hoisting , fixing in position and applying a priming coat of red lead paint in gratings framed guard bars, ladders,. railling, brackets and similar works in all leads and lifts as per the direction of the Enginner-in-Charge. |
| 21 | Providing and fixing 0.60mm thick prepainted steel sheet in roofing with hot dipped metallic zinc coated sheet with top coat of regular modified polyster (RNP) organic coating of 20 microns over 5 microns primer coating to back coat of polyster of 5 microns over 5 microns primer coating i/c fixing with prepainted iron J or L hooks, bolts and nuts 6mm dia metre with prepainted limpet and rubber washers complete with all accesoriees as required as per the direction of Engineer-in-charge. |
| 22 | Providing and Fixing Fiber rainforced Plastic (FRP) Storage tank of 6000 ltr. Capacity i/c all accessories such as pipes of various dia tees, ballvalves etc. complete in respect including all leads and lift as per the direction of the Enginner-in-Charge. |
| 23 | Providing and Fixing safety shower including accessories etc. |
| 24 | Providing evaporation tank of size 0.6m x 0.6m at base and 1.8m x 1.8m at GL with 10mm thick acid or alkaline resistant tiles |
| 25 | Wiring for light/Fan point/Exhaust fan point/call bell point with 1.5 Sq.mm PVC insulated copper conductor cable in surface/recessed PVC conduct at required including carriage of all material within all leads and lifts. Group \\"C |
| 26 | Wiring light point in PVC insulated copper conductor single core FRLS cable (ISI marked) overall 1.5 sq. mm, 1100volts grade. |
| 27 | Providing & fixing Fire Hydrants with jointing including all carriages complete. (without Fire Hydrant surface box) Size 80mm C.I Fire Hydrants Stand Post Type 15-908 complete in all respect. |
| 28 | Providing and fixing Flow meter of size 50 mm complete |
| 29 | Providing and fixing Level Gauge for Tank complete |
| 30 | Providing and fixing Precaution Boards Flex complete |
| 31 | Providing & Fixing Fibre Sheet including Nut Bolts etc. |
| 32 | Providing & making Holes in Tank |
| 33 | Providing & Fixing PVC pipe 100 mm |
| 34 | Providing & Fixing UPVC on Tank |
| 35 | Providing & Fixing Gi pipe 32mm |
| 36 | Providing & Fixing Flow Meter |
| 37 | Supply & erection of LED Street Light 60 Watt with Pressure dia cast aluminimum housing with control toughened Glass fitting |
| 38 | Finishing wall with water proofing cement paint of approved brand and manufacture and of required shade on undecorated wall surface (two coats) to give an even shade after thoroughly brushing the surface to remove all dirt & remains of loose powdered materials complete in all respect |
| 39 | Providing & Fixing over flow pipe & vent pipe on FRP Tank Please Enable Macros to View BoQ information |