| 1 | Earth work in excavation for all type of road structure such as retaining walls, breast walls, culverts, drains and parapets etcetera and other similar structure in all type of classification of soil comprising of ordinary soil, ordinary rock, hard rock chiseling /wedging out rocks ( Where blasting is prohibited) complete in accordance with the line and dimensions shown in the drawings as per M.O.R.D. technical specification section 300 and 1600 and as per direction of the Engineer- in – Charge including setting out shoring and bracing , removal of stumps and other deleterious materials and disposal of materials upto any lead and lift including dressing of sides and bottom and back filling in trenches with excavated suitable approved material to the original surface in layer not exceeding 150mm (One hundred fifty milimeter) compacted thickness including shoring, strutting and pumping and bailing out water (surface and sub soil water ) upto any depth and quantum of water including cleaning of slush which may arrise out during dewatering as per entire satisfaction and direction of Engineer-in-Charge, including carriage of materials within all leads, lifts, other incidental . The rate is including octroi, royality, malkana, toll tax, GST or other taxes imposed by the Government. |
| 2 | Providing and laying mechanically mixed and vibrated concrete for plain concrete in open foundation for all type of structure complete of concrete grade M-10 ( M Ten) nominal mix 1:3:6 ( One cement : three sand : six graded crushed/ broken stone aggregate 20mm (Twenty millimeter) nominal size on ground or under water including pumping or bailing out water / dewatering removal of slush as required at site which may arise at the time of laying concrete complete for all heights/ depths and curing complete including the cost of form work as per drawings and M.O.R.D. technical specification section 800, 900 and 1200 as per the direction and entire satisfactions of Engineer-in-Charge Including carriage of material within all leads, lifts and other incidental. The rate is including octroi, royality, malkana, toll tax, GST or other taxes imposed by the Government. |
| 3 | Providing and laying mechanically mixed and vibrated plain cement concrete for all type of structure nominal mix 1:4:8 ( One cement : four sand : eight graded crushed/ broken stone aggregate 40mm ( forty millimeter) nominal size on ground or under water and curing complete including pumping or bailing out water , dewatering (surface and sub soil water) and removal of slush as required at site which may arise at the time of laying concrete complete for all heights/ depths including the cost of form work in retaining wall, breast wall etcetera as per drawings and M.O.R.D. technical specification section 800,900, 1200 and 1600 as per the direction and entire satisfaction of Engineer-in-Charge Including carriage of material within all leads, lifts and other incidental . The rate is including of octroi, royality, Malkana, toll tax, GST or other taxes imposed by the Government. |
| 4 | Providing Weep holes in brick masonry/ stone masonry/ plain/ reinforced concrete abutment, Wing walls, Return walls, Retaining walls with 100mm (One hundred milimetres) dia with pressure not less than 4.00 kg /cm² (four point zero zero kilogram ) per centimetre square P.V.C. pipes extending through the full width of the structure with slope of 1 (one) (Vertically) : 20 (Twenty) (Horizontally) towards draining face complete as per drawing and MORD Technical specification Clause 614, 709, 1204.3.7, as per the direction of Engineer-in-Charge, including carriage of materials within all leads, lifts and other incidental .The rate is including of octroi, Royality, Malkana, toll tax, GST or other taxes imposed by the Government. |
| 5 | Back filling with granular material behind abutments, wing wall return walls, and retaining walls/ Breast walls complete as per drawing and MORD technical specifications section 1200 and 1600 as per directions and entire satisfaction of Engineer-in-Charge, including carriage of materials within all leads, lifts and other incidental. The rate is including octroi, royality, malkana, toll tax, GST or other taxes imposed by the Government. Please Enable Macros to View BoQ information |