|
| 1 | SITC of 13Mtr. Long Pole (ST-410 SP 69) |
| 2 | SITC of 11 Mtr. Long Pole (ST-410 SP 56) |
| 3 | SITC of GI V cross-arm with top Bracket including clamp and GI Channel X-arm with Belting/Brace Angle Iron |
| 4 | SITC of 200 mm² ACSR Conductor |
| 5 | SITC of PG Clamps for 200 mm² ACSR Conductor |
| 6 | SITC of 33kV Polymeric composite Pin Insulator 36kV, 10kN,Lighting Impulse 170kV Positive and 180kV Negative,creepage distance 900mm |
| 7 | SITC of 33kV Polymeric composite Disc Insulator 36kV,min failing load 70kN, Lighting Impulse 170kV Positive and 180kV Negative, creepage distance 900mm with fitting |
| 8 | SITC of Galvinized Nuts and Bolts. |
| 9 | SITC of Danger Plates with Clamps |
| 10 | SITC of Anti-Climbing Device with Clamps |
| 11 | SITC of Earthing Complete by GI Pipe 40 mm 3 mtr long or 2.5m long rod through GI Strip 25x3mm |
| 12 | SITC of Red oxide |
| 13 | SITC of Aluminium Paint |
| 14 | Cement bottoming 1:2:4 mix as per Standards 0.78 cum /pol |
| 15 | Cement bottoming 1:2:4 mix as per Standards 0.78 cum /pol |
| 16 | SITC of Galvanised Stay Set with 50x8mm stay clamp, guyinsulator(2Nos.), anchor plate (300x 300 x 8) mm, nut-bolts, 2 Nos turn-buckles, 1.8m long,20 mm diameter solid GS stay rod & 7/4 mm dia GI stranded wire complete |
| 17 | SITC of Guard netting (BY using GI Channel X-arm (75x40x6) including clamps, braces GI Wire 6 SWG & 8 SWG and Eye Bolts) |
| 18 | Dismantling of ST Pole 8/9/11 Mtr long old damaged poles |
| 19 | Dismantling of old twin (100+100)mmsq ACSR |
| 20 | Dismantling of V cross-arm/Ch iron/angle iron etc |
| 21 | Dismantling of Pin insulator |
| 22 | Dismantling of Disc insulator |
| 23 | Manual Carriage of dismantled material from site to roadside, loading , transportation upto stores and unloading at stores complete Please Enable Macros to View BoQ information |