| 1 | Item No. 1: Excavation for foundation/pipe trenches in Soft murum, road including removing the excavatedmaterialupto a distance of 50 M beyond the area and lifts as below, stacking and spreading as directed by Engineer-in charge, normaldewatering, preparing the bed for foundation and excluding backfilling, etc.complete |
| 2 | Item No. 2: Excavation for foundation / pipe trenches by all means in hard murum including removing the excavated material upto a distance of 50 M and lifts as below, stacking and spreading as directed by Engineer-in-charge, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. (Added 10% for Hilly Area) |
| 3 | Item no.3 - Providing dry/trap/granite/quartzite rubble stone soling 15 cm... etc complete |
| 4 | Item No.4:-Providing & laying in situ. C.C of trap granite/ quartzite /gneiss/ metal for foundation & bedding including dewatering, from work, compacting, curing, finishing etc. complete. M 150 (Added 10% for Hilly Area) |
| 5 | Item No.5:- Providing and casting in situ C.C. of trap/granite/quartzite / gneiss metal of approved quality for RCC works as per detailed drawings and designs or as directed by Engineer-in-charge including normal dewatering, centering, form work, compaction, finishing the formed surfaces with C.M. 1:3 of sufficient minimum thickness to give a smooth and even surface wherevernecessary or roughening if special finish is to be provided and curing, etc. complete. (By weigh batching and mix design for M-250 and M-300 only. Use of L&T, A.C.C., Ambuja, Birla Gold, Manikgad, Rajashree, etc. cement is permitted.) (Excluding M.S.orTorreinforcement) |
| 6 | Item No.6:-Providing & fixing in position steel bar reinforcement of various diameters for R.C.C. Pipes,caps, footing, foundation, slab, beams, columns, canopies, staircase, newels, chajjas, lintels, pardies, coping, fine arches etc. as per detailed designs, drawing & schedule s including cutting, bending, hooking the bars, bindingwith wires or tack welding & supporting as required etc. complete (including cost of binding wire). Tor steel (Added 10% for Hilly Area) |
| 7 | Itemno:7 Providing & fixing 80 mm dia. AC/PVC pipe weep holes at 1.5 m c/c straggererd including cost of all materials and labours involved with all leads and lifts etc. complete. (Added 10% for Hilly Area) |
| 8 | Item No.8:- Dewatering the excavated trenches and pools of water in the building trenches / pipeline trenches, well works by using pumps and other devices including disposing off water to safe distance as directed by Engineer-in-charge (including cost of machinery, labour, fuel), etc. complete. (Added 10% for Hilly Area) |
| 9 | Item no.9 Providing and fixing board displaying information, such as'Nameofwork, Tendercost, NameofContractor, Workco |
| 10 | Item no.10-Compressive Strength OF C.C. Cube (Set |
| 11 | Add 18% GST Please Enable Macros to View BoQ information |