| 1 | Earthwork embackment i/c of all material,labour and T&P etc.required for proper completion of work. Cartage up to distance 5.00km at Site |
| 2 | Concrete with 4cm gauge approved Stone ballast, coarse sand and cement in proportion of 8:4:1 including supply of all materials labour and completion of the work .S I no 281 |
| 3 | M-150 brick work in 1:3 with cement,coarse sand mortar including supply of all material,labour and T&P etc.required for proper completion of work. |
| 4 | 12mm thick Plaster in 1:3 with cement,coarse sand mortar including supply of all material,labour and T&P etc.required for proper completion of work. |
| 5 | 1\\" thick P.C.C in 1:2:4 with cement,coarse sand and stone grit of 2cm guage including supply of all material,labour and T&P etc.required for proper completion of work. |
| 6 | Construction of granular sub base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC and compacting with smooth wheel roller to achive the desired density complete as per Technical Specification Clause 401 |
| 7 | WBM Grading 3 (22.4-53 mm Stone ballast) Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. |
| 8 | S/L 125 micron Polythene Sheet Complete |
| 9 | Consruction of un-reainfocement dowel joint at expansion and construction joit only cement concrete pavment thikness as per design over a prepared sub base with 43 grade cement or any other type as per cluouse 150.2.2 M30 Grade coarse sand fine aggregate comfirming to IS:383 i/c all completion of work. |
| 10 | Making Expansion/contraction joints in c.c road i/c approved filler materials in joints.depth of joint 10cm/require depth at the joints of panels and giving them a including supply of all material,labour and T&P etc.required for proper completion of work |
| 11 | R.C.C work in 1:2:4 with cement,coarse sand and stone ballast of 2cm guage including supply of all material,labour and T&P etc.required for proper completion of work |
| 12 | Supply and fixing of mild steel bars for RCC work and angle for channel including supply of all material,labour and T&P etc.required for proper completion of work. Please Enable Macros to View BoQ information |