| 1 | Complete maintenance of the entire Garden featured having as per yard stick in the garden area ie. lawn trees, shrubs, herbs, ledge, flower, beds foliage creeper etc. including hoeing wedding, pruning, replacement of palnts gap filing, watering, mowing of lawn, grass cutting by lawn moved and brush cutter, removal of garden waste, applying in secticide, pesticide & fertilizer, (Whenever required) top dressing of lawn with good earth and manure and maintenance of other garden related works as per directed by officer in charge, (cost of good eawrth, manure, fertilizer, insecticide, pesticide will be provided by constractor) and as per direction officers in charge.100077.00X24 = 2401848.00 Months |
| 2 | Complete maintenance of Trees in RSP (Out side garden features) jobs like making of basin at regular interval i/c watering, weeding pruning & application of fertilizer etc. (excluding the cost of material which shall be supplied by the department and other T&P material/articles shall be provided by the contractor) and as per direction of officer in charge |
| 3 | Trees4800.00X24 = 115200.00 Months |
| 4 | Complete maintenance of Trees in Green Belt (Out side garden features) jobs like making of basin at regular interval i/c watering, weeding pruning & application of fertilizer etc. (excluding the cost of material which shall be supplied by the department and other T&P material/articles shall be provided by the contractor) and as per direction of officer in charge |
| 5 | Trees9327.00X24 = 223848.00 Months |
| 6 | Complete maintenance of Shurbs in Green Belt (Out side garden features) jobs like making of basin at regular interval i/c watering, weeding pruning & application of fertilizer elc (excluding the cost of material which shall be supplied by the department and other T&P material/articles shall be provided by the contractor) and as per direction of officer in charge |
| 7 | Shrubs6627.00X24 = 159048.00 Months |
| 8 | Providing profuse watering arrangement for lawn/Park at site to make available for irrigation RII Pipe/Canvas Pipe & other T&P etc. In the process of watering with arrangment of submersible pump & accessories as per direction of office in Charge in charge25.47X24 = 611.28 Months |
| 9 | Supply and stacking of well decayed cattle manure site including royalty and carriage up to 5 Km. lead completed. (Cattle manure measured in stacks will reduced by 8% for payment) |
| 10 | Supply of chloropyriphos 20% E.C. Lindan 20% E,C, FOR Anti-Termite treatment of plants@2ml/plant in the interval of 01month up to one year i.e.12times in a year hence it comes 0.24ml/per plant. As per market rate ) |
| 11 | D/I/T/C tube well boring of 150nun dia including all material & Labour complete PVC boring pipe and stainer of make Finolex / Kisan /Supreme approved by engineering in charg eof boring 200 feet. |
| 12 | S/F submersible moto pump CRI make of 3 IIP fixing and all meterial and labour complete. |
| 13 | Excavation & back filling the french for PVC Pipe line with all labour T&P etc. complete (size 1.00 x 0.45 x 0.9) as per UP PWD SOR rate. |
| 14 | P/F following size fo Finole makes PVC, pipes 6.0 kg./cm2 with required PVC Standard special confirming to IS codes with latest amendment and lowering the same tranches and laying true to alignment and gradient complete i/e the cost of cutting of pipes for making upt to length and making joints i/c cost of socket. Plsiochem PV-85 pvr solvent cement complete PVC pipe must the confirming to IS 4985-2000 with latest amendment Make Finolex Kisan/supreme Industries Ltd. (Rate as per comparative statement Per Rm.) 90mm dia with coupler @ 6kg/Cm2 Pressure with i/e all PVC Stanared specials |
| 15 | Provding and fixing hydrant with all complete. |
| 16 | Supply of Tractor trolley wth driver and including POL(AR/GNIDA) |
| 17 | Clearing of Jungle inlcuding uprooting of weeds ran vegetation grass brush wood trees and sapling of girth up to 30cm measured at height of 1.00mtr. Above ground level removal of rubbish up to a distance of 50mtr. Out side the periphery of the area cleared (As per UP PWD SOR item No. 259 (1) (Area Should be clean each and everypoint of time). |
| 18 | Civil work |
| 19 | Earth work in ordinary soil in all of foundation trenches including dressing of the side and ramming of bottom lifts upto 1.5m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m AR/GNIDA |
| 20 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: |
| 21 | 1:3:6 (1 cement: 3 coarse sand: 6 graded stone) (SOR-2020/281) |
| 22 | Supply at site R.C.C Standards post/struts/rails/pales of mix 1:1.5:3 (1 cement: 1.5 coarse sand: 3 graded stone aggregate 12.5 mm nominal size) with wooden plugs or mm bar nibs wherever required as per direction of Engineer-in-charge (cost of earth works in excavation, concrete works in foundation to be paid separately). |
| 23 | DSR-2013/16.15.1/P- |
| 24 | Fencing with R.C.C Post placed at required distance, embedded in cement concrete blocks, every 15th post, last but end post and corner post shall be strutted on both sides and end post one side only provided with norizontal lines and two diagonals of barbed wire 9.35 Kg. per 100 meters (min) between the two posts fitted and fixed with G.1. staples on wooden plugs or G.1 binding wire tied to 6mm bar nibs fixed while casting the post (cost of R.C.C Posts, struts, earth work and concrete to be paid for separately): Payment to be made per metre cost of total length of barbed wire used. |
| 25 | With G.I. barbed wire |
| 26 | DSR-2018/16.18.1 |
| 27 | White Washing with lime to give and even shade. |
| 28 | Old work (three or more coat) |
| 29 | SOR-2020-P-671 |
| 30 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer -in-charge |
| 31 | M-150 brick work in 1:4 one cement or four coarse sand 2.20 F.M mortar in foundation and plinth including supply of all material, Labour, T&P etc. |
| 32 | UPPWD/SOR-2020/305 (a) |
| 33 | Supply and Fixing of R.C.C. Grill work 9(JAL.I) of approved pattern & make at site of work in cement concrete consisting of cement, approved coarse sand and 6 mm. nominal size stone grit in the proportion of 1:2:4 & reinforced with 6 mm. dia M.S. wire/bar Including cutting & finishing with 1:3 cement and & fine sand of 1.25 fineness modules mortar including including supply of all materials, Labour, Tools & Plants etc, required for proper completion of the work but excluding plaster on jambs, still & soffit of the opening. |
| 34 | 12 mm cement plaster of mix: |
| 35 | 1:4 (1 cement: 4 coarse sand) |
| 36 | For boundary wall |
| 37 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement -All work up to plinth level: |
| 38 | 1:2:4 (1 cement: 2 coarse sand: 4 graded stone aggregate 20 mm nominal size) |
| 39 | For Jali fixing |
| 40 | Finishing walls with one coat of water proffing cement paint of approved quality on previously old treated surface with this paint to give an even shade including supply of all material, labour, tool and plant etc SOR2020-662(A) |
| 41 | Same as item 660 but for weather coat (Asian or Burger Brand) |
| 42 | Labour Cess and GST will be paid extra as per govt. orders Please Enable Macros to View BoQ information |