| 1 | Dismentalling brick or stone masonry in lime or cement mortar under 3m height.scaffolding, staging charges with cost conveyance cess and royalties of all materials and labour with T&P required for the work etc. complete in all respect in all floors. |
| 2 | Dismentalling A.C.C/ G.C.I sheet roofing after carefully removing the nuts including stacking the materials for re-use and removing the debris with in 50m lead, including cost of all labour with T&P etc. complete. |
| 3 | Removing old tarfelt from roof slab, cleaning the surface, lowering and removing the debris with in 50m lead including cost of all labour with T&P etc. complete. |
| 4 | Earthwork in excavation in all types of soil for site leveling, foundation, pits, trenches and other civil works upto and including 2.4metre depth and stacking the soil upto a lead of 101 metre and including dewatering, removing slush, shoring and strutting (as required), complete as per specification and as directed by the Engineer-In-Charge. |
| 5 | Supplying and filling in foundation and plinth with good quality river sand including watering, ramming with cost, conveyances, royalties of all materials and cost of all labour with T&P required for the work etc. complete as per specification & direction of Engineer-in-charge |
| 6 | Cement concrete of proportion (1:3:6) in foundation and plinth using 4cm size clean hard black crusher broken granite stone metal of approved quality and from approved quarry including hoisting, lowering and laying concrete in layers not exceeding 15 cm. (6\\") thick to the required level ramming, watering, curing etc. complete including cost, conveyance, royalties of all materials with all labour and T&P required for the work etc. complete in all respect and as per the direction of the Engineer-in-charge. |
| 7 | Fly Ash Brick masonry in C.M. (1:6) using 9\\" size using of 23cmx11cmx8cm size brick in Super Structure having a crushing strength of not less than 75 kg per Sq.cm including splays, cuttings, circular moldings, watering & curing for 7 days, cost, conveyance, royalties of all materials, labour with T&P etc. complete in all respect as directed by the Engineer-in-charge |
| 8 | 2.5cm thick grading concrete of proportion (1:2:2) over roof including cost, conveyance, royality cess of all materials, all taxes, T&P etc required for the work complete in respect, as per specification & direction of the Engineer-in-Charge. |
| 9 | Waterproofing application:- Providing and application of two component polymer modified flexible cementitious waterproofing coating at a thickness of 1.5 -2.5 mm The membrane should have Elongation equal or more than: 30% Crack Bridging ability : Up to 1 mmAdhesive strength: 1.0 N/mm² @ 28dTensile elongation: 60% @ 20°CShore A Hardness >85 (between 3 - 7 days)etc. as per direction of E.I.C (For longer span, in terrace panel of 4m*4m should be done by groove cutting, and filling with PU Sealant)(Make-Myk, Fosroc, Sika) |
| 10 | Providing & laying water proofs with polymetric bituninous membrance Plastic felt of 2.25 Kg/sqm & 1.50mm thickness consisting of layers having centre core of 20 micron thermoplastic high molecular high density polythylens H.M.H.D.P.E. film of grade 2504 including priming the surface with bituminious primer @ 0.3 Kg/Sqm. providing a coat of hot blown bitumen of 1.32 Kg/Sqm applying & laying plastic felt membrance with 10cm. overlaping adhered to blown bitumen of 85/25 or 90/15 grade & covered with a layer of hot bitumen @ 1.2 Kg/sqm etc. complete including cost of al materials & labour etc. complete as per the direction of Engineer-in-Charge. |
| 11 | R.C.C. work of proportion M-20 grade having minimum compressive strength in work test of 200 Kg/Cm2 at 28 days using 20 mm and down graded size black hard crusher broken granite stone chips of approved quality and from approved quarry including hoisting lowering and laying concrete and compacting by using vibrators watering, curing for 28 days, centring & shuttering and finishing the exposed surface smooth providing grooves or beads where necessary in all floors including cost, conveyance, royalties and taxes of all materials , cost of all labour with cost of all T&P required for the work etc. complete in all respect but excluding cost and conveyance of M.S. rods or steel & binding wires and labour charges for strengthening, cutting, bending grills and placing in proper position etc complete as per direction of Engineer-in-Charge. Drain cover |
| 12 | Cutting, straightening coiled or bent up M.S. Rod or tor steel of SAIL/ TATA / RINL (VIZAG) make including bending, binding, welding and joining if necessary and tying the grills and placing in position as required for R.C.C. Work and for providing fan hooks as required, hoisting, lowering, laying including cost, conveyances, taxes of M.S. Rod or tor steel and binding wires of 18 to 20 gauge and labour required for the work for bending, binding and tying the grills in all floors (Linear measurement will be taken and quantity will be calculated basing on the standard weight of B.I.S. for M.S. Rods or tor steel only. Wastage if any, including weight of binding wire will not be considered for measurement) etc. complete as per specification & direction of Engineer-in-charge |
| 13 | Removing old lime or cement plaster from walls including racking out joints 12mm deep and removing the debris with in 50m lead including cost of all labour with T&P etc. complete. |
| 14 | Providing 12mm thick cement plaster (1:6) on the rough surface/ plumbed surface of masonry racking out of joints, scrapping and cleaning the surface and finishing the plastered surface smooth to proper plumbs and level and providing grooves as shown in the drawning including cost of all material, labour, conveyance, loading and unloading, taxes, royalties, sundries, tools and plants etc. complete as per the driection of the Engineer in Charge |
| 15 | 6mm thick cement plaster in cm (1:4) finished smooth to RCC surface including watering, curing, cost, conveyance, taxes, royalties, labour with T&P etc. complete in all respect. |
| 16 | 32 mm thick Flush Door with all labour iron fittings and wooden hinged cleats etc fitted and fixed complete in all respect including cost of all fitting materials etc complete. |
| 17 | Providing and fixing M.S grill of required patterns for windows/verandahs etc. with M.S flats, square or round bars etc. including applying a coat of approved steel primer and two or more coats of synthetic enamel paint of approved make & shade, all complete as per drawing & specification. |
| 18 | Supplying fitting and fixing of precoated Crill sheet semi glass of 1000mm width & total coated thickness .50mm in roof drilling hole in wind ties including fixing of ridges and valley s wind ties etc complete including cost of steel and nail fitting ,all taxes labour & T&P etc. complete |
| 19 | Painting two coats with over coat of primer any approved plastic emulsion paint to interior wall surface inluding cost of all materials and labour with T&P etc.complete in all respect. |
| 20 | Enamel Painting two coats with any approved paint to old wood/iron works including cost of paint, sand papering, polishing the surface including cost, conveyance, taxes, cess and royaltieis of all materials with cost of indigo, blue with labour and T&P etc., required for the work complete and as per direction of Engineer-in-charge. |
| 21 | Wall painting two coats with weather coat of approved shade & approved make to give an even shade over a coat of primming with approved wall primer etc including cost of all materials, taxes & labour with T&P etc. complete in all floors as per the direction of Engineer in charge. |
| 22 | Finishing wall surface with Acrylic wall putty of approved make and finished smooth and even surface to receive painting including cost of scaffolding staging charges with cost of all materials labour T&P etc.complete. |
| 23 | Providing ,fitting and fixing with sal wood battens,7.5 cm x 1.2 cm with 6 mm mesh wire netting,or expanded metal including panting complete(Mosquito Net) Please Enable Macros to View BoQ information |