|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:Rate for a lead upto All kinds of soil : |
| 2 | Providing & Laying of stone soling (dully hand packed)including watering dressing and ramming with all carriages loading un-loading and stacking etc complete |
| 3 | Providing & laying in position cement concrete of specified grade excld. The cost of centring and shuttering all work upto plinth level 1: 4: 8 (1:Cement: 4 coarse sand and 8 graded stone 40mm nominal size crushed.) |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) |
| 5 | Providing corrugated G. S. sheet roofing including vertical/curved surface fixed with polymer coated J or L hooks, bolts and nuts 8mm diameter with bitumen and G.I limpet washers or with G.I. limpet washers filled with white lead, including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete (upto any pitch in horizontal/vertical or curved surface)excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required.50 mm thick with zinc coating not less than 275 gram/m2 |
| 6 | Centring and shuttering incld. Strutting, proping etc & removal of form work for Founadtions, footings, bases of columns for mass concrete |
| 7 | Structural steel work in single section, fixed with or without connectingplate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. |
| 8 | Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.Welded |
| 9 | 12mm Cement plaster of mix: 1 : 4 ( 1 cement : 4 fine sand) in fine sand |
| 10 | Carriage of materails By Mech.Transport, from source to site of work |
| 11 | Stone Aggregate for an average lead of 25 kms. |
| 12 | Sand for an avg lead of 25 kms |
| 13 | Carriage of materails By Head load 100m for Stone Agg. And sand. Please Enable Macros to View BoQ information |