| 1 | Construction of Subgrade with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2.Including all material, labour & T&P with all taxes etc. complete but excluding GST |
| 2 | Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401.Including all material, labour & T&P with all taxes etc. complete but excluding GST |
| 3 | Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing.Including all material, labour & T&P with all taxes etc. complete but excluding GST |
| 4 | Construction of un-reinforced, dowel jointed, plain cement concrete pavement Grade M-30 over a prepared sub base with approved 43 grade cement, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing .Including all material, labour & T&P with all taxes etc. complete but excluding GST |
| 5 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade. Two or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture. DSR 13.62.1.Including all material, labour & T&P with all taxes etc. complete but excluding GST |
| 6 | Providing and laying of interlocking concrete block pavament M-30 Mpa compressive strength thickness 80 mm over prepared sub base / Base and prepared over sand bed surface including all labour T&P etc. required for proper completion of work.Including all material, labour & T&P with all taxes etc. complete but excluding GST |
| 7 | Brick masonry in 1:4 cement mortar in foundation complete excluding pointing and plastering as per drawing and technical specifications Clauses 600, 1202 & 1203.Including all material, labour & T&P with all taxes etc. complete but excluding GST |
| 8 | Earth work in excavation for structures as per drawing and technical specification clause 305.1 including setting aout construction of strong and bracing, removel of stumpsand other deleterious material upto a lead of 50 m dressing of surface.Including all material, labour & T&P with all taxes etc. complete but excluding GST |
| 9 | Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.Including all material, labour & T&P with all taxes etc. complete but excluding GST |
| 10 | Construction of RCC railing of M30 Grade in-situ with 20 mm nominal size aggregate, true to line and grade, tolerance of vertical RCC post not to exceed 1 in 500, centre to centre spacing between vertical post not to exceed 2000 mm, leaving adequate space between vertical post for expansion, complete as per approved drawings and technical specifications.Including all material, labour & T&P with all taxes etc. complete but excluding GST Please Enable Macros to View BoQ information |