| 1 | Carriage of PCC Pole 11 Mtr Long from Store center to various work site loading and unloading both side. distance 1 km to 50 km. |
| 2 | Carriage of ACSR DOG CONDUCTOR from Store center to various work site loading and unloading both side. distance 1 km to 50 km. |
| 3 | Carriage of HT XLPE 11 KV 3X185 SQMM from Store center to various work site loading and unloading both side. distance 1 km to 50 km. |
| 4 | Carriage of all line material as per site requirement:- M/S ANGLE 65X65X6 MM-1000KG, M/S CHANNEL 100X50MM-3000KG, 11 KV V TYPE CROSS ARM STEEL 65X65X6MM-15Nos, 11 KV COMPOSIT PIN INSULATOR WITH PIN & NUT- 250Nos, 11 KV POLY DISC INSU 45 KN-150Nos, EARTH ROD- 70Nos, STAY SET GI 20X1800MM-15Nos, DANGER BOARD WITH CLAMP-33Nos, NUMBER PLATE-60Nos, CABLE BOX 11 KV 3X185 XLPE O/D-116Nos, CABLE BOX 11 KV 3X185 XLPE ST TH-20Nos, ALUMINIUM PAINT-50LTR, RED OXIDE PAINT-100LTR................etc and other remaining material shall be carrried if requirment of work, from Store center to various work site loading and unloading both side. distance 1 km to 50 km. |
| 5 | Dismantling of old & used different size Cable and accessories(in Shifting of complete line) carriage from work site to Store center/JE store loading and unloading both side. (Recived Back Material Shall be return as per Guideline) |
| 6 | Dismantling of Damage ST Pole and Other Scrap(in Shifting of complete line) carriage from work site to Store center/JE store loading and unloading both side.(Recived Back Material Shall be return as per Guideline) |
| 7 | Dismantling of Different type(Capecity 25KVA to 100KVA) of many T/F(in Shifting of complete line) and Safely carriage from work site to new Shifting Site loading and unloading both side. |
| 8 | Dismantling of Different type Ratio CT/PT(in Shifting of complete line) and Safely carriage from work site to new Shifting Site loading and unloading both side. |
| 9 | Dismantling of Damaged RMU(in Shifting of complete line) and Safely carriage from work site to Store center/JE store loading and unloading both side.(Recived Back Material Shall be return as per Guideline) |
| 10 | Erection of PCC Pole 11 Mtr long long complete in all respect as per respo Norms. |
| 11 | Providing/Making Plinth or Grounting/Concreting of Pole complete in all respect as per respo Norms. |
| 12 | Requrement of Making Double Pole (The poles has been carried from the store) and Safely placing of Different type(Capecity) of meny T/F(in Shifting site to new place) and Safely help of Crane/Chain Cuppie and making Proper connection with complete in all respect as per Respo Norms at various site. |
| 13 | Requrement of Making Double Pole (The poles has been carried from the store) and Errection/Commissioning/Fixing/Installation of CT/PT(in Shifting site to new Place) at various site complete in all respect as per respo Norms. |
| 14 | Errection/Commissioning/Fixing/Installation of all carriage line material as per site Requirement:- M/S ANGLE 65X65X6 MM-1000KG, M/S CHANNEL 100X50MM-3000KG, 11 KV V TYPE CROSS ARM STEEL 65X65X6MM-15Nos, 11 KV COMPOSIT PIN INSULATOR WITH PIN & NUT- 250Nos, 11 KV POLY DISC INSU 45 KN-150Nos, EARTH ROD- 70Nos, STAY SET GI 20X1800MM-15Nos, DANGER BOARD WITH CLAMP-33Nos, NUMBER PLATE-60Nos, CABLE BOX 11 KV 3X185 XLPE O/D-116Nos, CABLE BOX 11 KV 3X185 XLPE ST TH-20Nos, ALUMINIUM PAINT-50LTR, RED OXIDE PAINT-100LTR................etc and other remaining material shall be proper completed at work Site complete in all respect as per respo Norms. |
| 15 | Laying of 3×185 sqmm XLPE Cable with digging, sand & bricks (with HDPE pipe) and loop riser, etc.,(as per site requirement Double Circuit for each Feeder), complete in all respects as per RESPO norms. (If one or more feeders (i.e., 2 to 3 feeders) are encountered along the route, the responsibility for converting them into underground shall also rest with the external agency. The work shall be executed using the same available (balance) cable, and the entire cable shall be fully utilized as per site requirements during execution.) |
| 16 | After Laying of 3x185 sqmm Cable XLPE, Road Restoration if required (Permission shall be concerned authority by contractor) for kacchha and footpath road Charges at work site complete in all respect as per respo Norms. |
| 17 | After Laying of 3x185 sqmm Cable XLPE, Road Restoration if required (Permission shall be concerned authority by contractor) for Pucca road Charges at work site complete in all respect as per respo Norms. |
| 18 | Laying/Lifting/Sagging/Jumpering of ACSR DOG CONDUCTOR …..etc work at various site with proper connection complete in all respect as per respo Norms. |
| 19 | Supply & Errection/Fixing/Installation NUT BOLT OFF SIZE at various site complete in all respect as per respo Norms. |
| 20 | Supply & Errection/Fixing/Installation STONE PAD at various site complete in all respect as per respo Norms. |
| 21 | Supply & Errection/Fixing/Installation G.I PIPE 6\\" at various site complete in all respect as per respo Norms. |
| 22 | Supply & Errection/Fixing/Installation HDPE PIPE 140\\" at various site complete in all respect as per respo Norms. |
| 23 | Supply & Errection/Fixing/Installation XLPE CABLE SUPPORT CLAMP at various site complete in all respect as per respo Norms. |
| 24 | Supply & Errection/Fixing/Installation EARTHING OF T/F CHEMICAL at various site complete in all respect as per respo Norms. |
| 25 | Supply & Errection/Fixing/Installation HOLDING CLAMP ROUND POLE at various site complete in all respect as per respo Norms. |
| 26 | Supply & Errection/Fixing/Installation F-BRACKET 11 KV at various site complete in all respect as per respo Norms. |
| 27 | All other remaining works shall be completed and energised the Line by contractor in all respect as per site requirement. Please Enable Macros to View BoQ information |