| 1 | For for New Connection 150 KW, LMV 11, Vehicle Charging Station Newada Sundarpur near Mahila Polytechnic Varanasi. |
| 2 | Decentralized Item |
| 3 | OD Cable Jointing Kit suitable for 3x70mm2 XLPE Cable |
| 4 | Gi Pipe 6\\" dia |
| 5 | Concreting of Support |
| 6 | Number Plate With Clamp |
| 7 | Danger Board with Clamp |
| 8 | Barbed Wire G.I. |
| 9 | Aluminium Paint |
| 10 | Clamp With Bolt & Nut |
| 11 | Copper Z Clamp |
| 12 | Making Of Plinth of Material with fencing |
| 13 | Al Lug 400sqmm |
| 14 | holding clamps with bolts & nuts and wasar off size |
| 15 | Labour charge |
| 16 | Carriage of 250kva transformer from store to site |
| 17 | Sp. earthing of 250kva T/F neutal & body seperately with 60 mm GI pipe & 60 feet deep and connection with gi strip off size 35X5 mm including cost of materials |
| 18 | Cartage of materials from store to site including loading & unloading |
| 19 | Cable Jointing charges for O/D& I/D Jointing Kit & Hoisting and clamping od 3x70Sqmm. Cable on Pole and cable connection |
| 20 | laying of HT 11kV XLPE cable 3x70sqmm with sand, bricks stone by open trench method. |
| 21 | Fitting of DP & mounting of 250kva T/F with all accessories |
| 22 | Labour charge for earthing of ST 9mtr Pole |
| 23 | Painting of STP with fitting including cost red oxide primer and Al paint with material |
| 24 | Loading unloading & carriage of ST Pole 9mtr |
| 25 | Loading unloading & carriage charge of 11kV HT 3x70sqmm |
| 26 | for New Connection 120 kw, LMV 11, Vehicle Charging Station Panitanki Ramnagar VNS |
| 27 | Decentralized Item |
| 28 | I/D & OD Cable Jointing Kit suitable for 3x70mm2 XLPE Cable |
| 29 | Gi Pipe 6\\" dia |
| 30 | Concreting of Support |
| 31 | Number Plate With Clamp |
| 32 | Danger Board with Clamp |
| 33 | Barbed Wire G.I. |
| 34 | Aluminium Paint |
| 35 | Concreting of Stay |
| 36 | Clamp With Bolt & Nut |
| 37 | Copper Z Clamp |
| 38 | Making Of Plinth of Material with fencing |
| 39 | Al Lug 400sqmm |
| 40 | Clamp With Bolt & Nut |
| 41 | Labour charge |
| 42 | Labour charge of O/D & I/D jointing kit with all materials |
| 43 | Carriage charge for 11 KV Pilfer Proof Metring Cubicle from Store to Site |
| 44 | Cable Laying by Digging/Drilling)(L/S) |
| 45 | laying of HT 11kV XLPE cable 3x70sqmm with sand, bricks stone by open trench method. |
| 46 | Installation of 250 Transformer |
| 47 | Carriage of materials from store to site including loading & unloading |
| 48 | Cable Jointing charges for O/D& I/D Jointing Kit & Hoisting and clamping od 3x70Sqmm. Cable on Pole and cable connection |
| 49 | Fitting of DP & mounting of 250kva T/F with all accessories |
| 50 | Labour charge for earthing of ST 9mtr Pole |
| 51 | Painting of STP with fitting including cost red oxide primer and Al paint with material |
| 52 | Loading unloading & carriage of ST Pole 9mtr |
| 53 | Loading unloading & carriage charge of 11kV HT 3x70sqmm |
| 54 | Sp. earthing of 250kva T/F neutal & body seperately with 60 mm GI pipe & 60 feet deep and connection with gi strip off size 35X5 mm including cost of materials |
| 55 | Loading-unloading and carriage charge of MS channel, MS angle etc. |
| 56 | Installation of 11 KV Pilfer Proof Metring Cubicle Store to Site Please Enable Macros to View BoQ information |