| 1 | Earth work excavation by mechanical means /manual means in foundation trenches or drains including dressing of sides and ramming of bottoms including getting out and disposal of excavated earth lead upto 50m and for all lift etc all complete. |
| 2 | Providing and laying in cement concrete 1:4:8 4.1.8 cement coarse sand and 40mm stone ballast nominal size and curing all complete. |
| 3 | Reinforced cement concerete work with 1:1.5;3 cement coarse sand and 20mm stone aggregates in Raft,plinth beam, columns and band beam work excluding the cast of centering shuttering finishing and reinforcement with 1:1.5:3 etc all complete. |
| 4 | Structural steel work in single section fixed with or without connecting plate including cutting hoisting in position and applying a priming coat of approved steel primer all |
| 5 | M-150 brick work in 1:6 cement and coarse sand mortar in foundation upto plinth level including supply of all material, labour and tools and plants. ect. required for proper completion of work. |
| 6 | M-150 brick work in 1:4 cement and coarse sand mortar in super structure including supply of all material, labour and tools and plants. ect. required for proper completion of work. |
| 7 | Providing and laying 12mm thick plaster in 1:4 13 with cement coarse sand including all complete. |
| 8 | Providing and applying white cement based putty of average thickness 1 mm of approved brand and manufacture over the plastered wall surface to prepare the surface even and smooth |
| 9 | Applying priming coats with primer of approved brand and manufacture, having low VOC (Volatile Organic Compound ) content. With water thinnable cement primer on wall surface having VOC content less than 50 grams/litre. |
| 10 | Wall painting with acrylic emulsion paint 1 having VOC content less than 50 grams/litres of approved brand and manufacture including applying additional coats wherever required to achieve even shade and colour. |
| 11 | Providing and fixing M.S. Tubular frames for doors, windows, ventilators and cupboard with rectangular/ L-Type sections, made of 1.60 mm thick M.S. Sheet, joints mitred, welded and grinded finish, with profiles of required size, including fixing of necessary butt hinges and screws and applying a priming coat of approved steel primer. Fixing with 15x3 mm lugs 10 cm long embedded in cement concrete block 15x10x10 cm of C.C. 1:3:6 (1 Cement: 3 coarse sand: 6 graded stone aggregate 20 mm nominal size) |
| 12 | Providing and applying two coats of fire retardant paint on cleaned wood / ply surface @ 3.5 sqm per litre per coat surface as per recommendations of manufacturer to make the surface fire retardant. |
| 13 | Miscellaneous work including all complete. |
| 14 | Earth work excavation by mechanical means /manual means in foundation trenches or drains including dressing of sides and ramming of bottoms including getting out and disposal of excavated earth lead upto 50m and for all lift etc all complete. |
| 15 | Providing and laying in cement concrete 1:4:8 cement coarse sand and 40mm stone ballast nominal size and curing all complete. |
| 16 | M-150 brick work in 1:6 cement and coarse sand mortar in foundation upto plinth level including supply of all material, labour and tools and plants. ect. required for proper completion of work. |
| 17 | Fillling in foundation trenches as per drawing and technical specification Clause 305.3.9 |
| 18 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with moter graded on prepared surface mixing by mix in place method with rotavator at OMC, and compacting with smooth roller to achive the desired density, complete as per Technical Specification Clause. 401 |
| 19 | Providing & Laying 80mm thick cement concrete Grey colour rubber moulded zig-zag interlocking block over grey colour 3cm fine sand including all complete. |
| 20 | Providing & Laying 80mm thick cement concrete Red/Yellow colour rubber moulded zig-zag interlocking block over grey colour 3cm fine sand including all complete. |
| 21 | CConstrcution of padustrial board including all complete. |
| 22 | CC 1:2:4 with cement coarse sand and 20mm stone aggregates etc ali complete. |
| 23 | Supply and sapling of carpet green grass and small plantation work including all charges all complete. Please Enable Macros to View BoQ information |